CRYSTAL COLLIMATION EXPERIMENT AT THE TEVATRON CSN1 LNF 17 September 2007 Walter Scandale CERN.

Slides:



Advertisements
Similar presentations
Stefan Roesler SC-RP/CERN on behalf of the CERN-SLAC RP Collaboration
Advertisements

W. Scandale for the UA9 Collaboration CERN – IHEP - Imperial College – INFN – JINR – LAL - PNPI – SLAC LAL January 24, 2012.
W. Scandale for the UA9 Collaboration CERN – IHEP - Imperial College – INFN – JINR – LAL - PNPI – SLAC SPSC, October 25, 2011.
Bent Crystal Results to Date Feb 26, 2007 D. Still.
MTest Facility Low Energy Beam Erik Ramberg AEM 15 October, 2007.
Introducing Channeling Effect
Yury CHESNOKOV Crystal Collimation workshop, March 7, 2005 CALIBRATION of CMS CALORIMETERS with LHC PROTON BEAM DEFLECTED BY CRYSTAL CALIBRATION of CMS.
NTA-HCCC Stato aggiornato della sperimentazione Vincenzo Guidi Sezioni di FE, LNL, MIB (Como e TS) Partecipazione esperimento UA9– CERN Coordinato da W.
The performance of LHCf calorimeter was tested at CERN SPS in For electron of GeV, the energy resolution is < 5% and the position resolution.
Loss maps of RHIC Guillaume Robert-Demolaize, BNL CERN-GSI Meeting on Collective Effects, 2-3 October 2007 Beam losses, halo generation, and Collimation.
CRYSTAL-BASED COLLIMATION SYSTEM AS AN ALTERNATIVE WAY TO SOLVE THE COLLIMATION PROBLEM FOR FUTURE HIGH ENERGY ACCELERATORS ALEXEI SYTOV Research Institute.
1 October 2007Reflection on bent crystals W. Scandale 1/24 OBSERVATION OF PROTON REFLECTION ON BENT SILICON CRYSTALS AT THE CERN-SPS Walter Scandale CERN.
T-980 Crystal Collimation Recent Results T-980 Collaboration: FNAL, SLAC, BNL, CERN, PNPI, IHEP, INFN D. Still CM14 April 27, 2010.
1/17 November 2006Walter Scandale H8-RD22 Experiment to test Crystal Collimation for the LHC Walter Scandale CERN For the H8-RD22 collaboration (CERN,
Experimental Setup of the H8-RD22 Experiment Massimiliano Fiorini (on behalf of the H8-RD22 Collaboration) University of Ferrara – INFN Ferrara CARE HHH.
H8-RD22 Experiment to test Crystal Collimation for the LHC Organized by: Walter Scandale Conducted at CERN Geneva, 27 September 2006 Participants included:
W. Scandale 1 Status of UA9 Walter Scandale CERN CC09 5 th workshop on crystal channeling March 2009.
Crystal channeling 2009 A. Afonin, IHEP, Protvino New results of use and research of crystals at U-70. A.Afonin, IHEP, Protvino 4- th Crystal channeling.
Ralph Assmann What Do We Want To Measure (in 2009) R. Assmann S. Redaelli, V. Previtali CERN/BE discussed with W. Scandale CERN/EN26/3/2009CC09  See also.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
ESGARD – OMIA 10 & 11/09/2007 JRA on Collimators and Materials for High Power Accelerators Motivation Work Packages Partners & resources R. Assmann.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
US LHC Accelerator Research Program Jim Strait For the BNL-FNAL-LBNL LHC Accelerator Collaboration DOE Meeting 18 April 2003 brookhaven - fermilab - berkeley.
THE T980 CRYSTAL COLLIMATION EXPERIMENT AT THE TEVATRON 4 th Crystal Channeling Workshop CERN, Switzerland March 24-27, 2009 Nikolai Mokhov Fermilab Accelerator.
Bent Crystal Results to Date Feb 22, 2007 D. Still.
Status of UA9 1 W. Scandale on behalf of the UA9 Collaboration W. Scandale – SPSC 20/10/2015 Introduction Measurements and tests in the SPS North Area.
D. Still-FNAL/Tevatron HALO '03 Tevatron Collider II Halo Removal System Dean Still Fermilab Tevatron Department 5/21/2003 Motives for the Collider Run.
Crystal collimation for LHC Valery Biryukov IHEP Protvino Vincenzo Guidi Ferrara University and INFN Walter Scandale CERN CERN, Geneva, 24 April 2003.
CERN 9 March 2006Biryukov: crystal collimation1 Simulations and interpretation of crystal collimation experiments at RHIC and Tevatron CERN, 9 March 2006.
Crystal Collimation at RHIC Raymond Fliller III Brookhaven National Laboratory HALO03, Montauk, NY.
Project X RD&D Plan Beam Transfer Line and Recycler Injection David Johnson AAC Meeting February 3, 2009.
LHC Crystal MD 22/09/2015 – LSWG #7 R. Rossi for the LHC Collimation team and the UA9 Collaboration.
Crystal channeling for electron/position beams T.Takahashi Hiroshima Univ. 28 May 2008 Nanobeam 2008 BINP.
Joint IR Studies: Operating Margins Nikolai Mokhov Fermilab bnl - fnal- lbnl - slac US LHC Accelerator Research Program LARP Collaboration Meeting SLAC.
TOWARDS COLLABORATION “CRYSTAL COLLIMATION EXPERIMENT AT THE TEVATRON” Nikolai Mokhov Fermilab bnl - fnal- lbnl - slac US LHC Accelerator Research Program.
Status of Head-on Beam-Beam Compensation BNL - FNAL- LBNL - SLAC US LHC Accelerator Research Program A. Valishev, FNAL 09 April 2009 LARP CM12.
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
Crystal Channeling Study (experiment to study and apply channeling to HEP) Vincenzo Guidi University of Ferrara and INFN.
CRYSTAL COLLIMATION EXPERIMENT AT THE TEVATRON Accelerator Advisory Committee Fermilab, Batavia, IL August 8-10, 2007 Fermilab Accelerator Advisory Committee.
Using crystals facilitates the LHC upgrade the LHC upgrade Victor Tikhomirov Institute for Nuclear Problems Minsk INP.
Study Group for slow extraction assisted by bent crystals in the SPS B.Goddard, W.Scandale 23/7/15.
Collimation Overview 28 October 2008 LARP CM11, Fermilab Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research Program 1)Short Status.
Status and Results of the UA9 Crystal Collimation Experiment at CERN-SPS Walter Scandale (CERN, LAL, INFN) for the UA9 collaboration Mini-workshop UA9,
26 June 2007Reflection on bent crystals W. Scandale 1/22 OBSERVATION OF PROTON REFLECTION ON BENT SILICON CRYSTALS AT THE CERN-SPS Walter Scandale CERN.
TEVATRON COLLIDER COLLIMATORS AND ABSORBERS Fermilab Materials for Collimators and Absorbers Nikolai Mokhov, Fermilab Workshop on Materials for Collimators.
Recent developments in crystal collimation at the Fermilab Tevatron (T-980) FNAL, CERN, PNPI, IHEP, INFN Dick Carrigan UA9 Crystal Collimation Workshop,
W. Scandale For the UA9 Collaboration.  Historical perspective  RD22 at the CERN-SPS as a test bed of beam extraction at LHC  E853 at the FNAL-Tevatron.
Crystal Channeling Radiation and Volume Reflection Experiments at SLAC Robert Noble, Andrei Seryi, Jim Spencer, Gennady Stupakov SLAC National Accelerator.
STATUS OF T980 CRYSTAL COLLIMATION EXPERIMENT AT THE TEVATRON LARP Collaboration Meeting 11 Fermilab, Batavia, IL October 27-28, 2008 Nikolai Mokhov Fermilab.
F Project X: Recycler 8.9 GeV/c Extraction D. Johnson, E. Prebys, M. Martens, J. Johnstone Fermilab Accelerator Advisory Committee August 8, 2007 D. Johnson.
CHANNELING 2014 COMPTE-RENDU R.CHEHAB R.Chehab/Channeling20141.
Thanks to all members of organisation committee for the preparation of this event Thanks to all participants for their interest R.Schmidt Introduction.
Engineering Department ENEN Introduction to EuCARD2 WP 11: Collimator Materials for fast High Density Energy Density Deposition (ColMat-HDED) Alessandro.
ODR Diagnostics for Hadron Colliders Tanaji Sen APC.
Crystal Collimation at SSC and Tevatron CARE Workshop on Crystal Collimation in Hadron Storage Rings CERN March 7-8, 2005 Fermilab CARE CC-2005 Nikolai.
Halo Collimation of Protons and Heavy Ions in SIS-100.
CRYSTALS AS LONG-TERM IMPROVEMENT FOR LHC COLLIMATION
Status of UA9, the crystal collimation experiment at the CERN-SPS
T980 STATUS AND CHANGES FOR
CRYSTAL COLLIMATION EXPERIMENT AT THE TEVATRON
Bending crystals for magnetic and electric dipole moment measurements
Historical Perspective and First Experiments with Bent Crystals
History of Crystal Extraction at the SPS (RD22)
CLIC-ILC BDS & MDI work.
Talk originally given at 4th Crystal Channeling Workshop
Crystal technology at PNPI
LHC Collimation Requirements
LHC External Collimation Review
Operational Results of LHC Collimator Alignment using Machine Learning
Presentation transcript:

CRYSTAL COLLIMATION EXPERIMENT AT THE TEVATRON CSN1 LNF 17 September 2007 Walter Scandale CERN

CSN1, Sept. 17, 2007Crystal Collimation Experiment - W.Scandale2 OUTLINE Introduction Proposal for Experiment at Tevatron Tevatron Study Plan Contributions, Matching Efforts, LARP Support Summary

CSN1, Sept. 17, 2007Crystal Collimation Experiment - W.Scandale3 INRODUCTION Bent-crystal technique is well established for extraction of high energy hadron and heavy-ion beams from accelerators. Such an extraction was successfully demonstrated for up to 900 GeV beams at JINR, IHEP, CERN and Fermilab. Bend crystal channeling technique for beam halo collimation at high-energy considered for the SSC and the LHC since the early 90’s. A bent crystal, serving as a primary element, should coherently bend halo particles onto a secondary collimator. First successful measurements were performed at IHEP in 1998 for 1 to 70 GeV protons. Results of H8RD22 crucial to this respect (volume reflection efficiency up to 98 %). Test of a bent crystal into the Tevatron collimation system. First measurements (2005/06) quite encouraging.

CSN1, Sept. 17, 2007Crystal Collimation Experiment - W.Scandale4 Two-Stage Collimation with Target and Crystal Courtesy R. Assmann

CSN1, Sept. 17, 2007Crystal Collimation Experiment - W.Scandale5 PROPOSAL FOR EXPERIMENT AT TEVATRON Perform tests of crystal collimation at the tevatron, aiming at the highest-performance collimation in both the transverse planes. The results will be extrapolated to the LHC collimation system at full luminosity and beyond, A US-LARP Crystal Collimation Project has been proposed to conduct these studies in the time frame required by the LHC plans. An international collaboration is being organized to address the scientific issues

CSN1, Sept. 17, 2007Crystal Collimation Experiment - W.Scandale6 WHERE TO INSTALL CRYSTAL ~5   Scattered trajectories Install Crystal Collimator at E0 to replace a Tungsten Target and utilize the rest of the collimator 2 stage System. Proton Set 1 D49 Tar, E03 & F172 2nd Proton Set 2 D171Tar, D173 & A0 Pbar Set 1 F49 Tar, F48 & D172 Pbar Set 2 F173 Tar, F171 & E02

CSN1, Sept. 17, 2007Crystal Collimation Experiment - W.Scandale7 CRYSTAL COLLIMATOR SYSTEM E03 Secondary Collimator E0 Crystal Collimator Assembly E0 Scintillator Paddles PIN Diode BLM Laser – angular measurement crystal E03H 2 nd Collimator 14 mm channeled beam m Pin Diode BLM to be extended for the purpose of the future experiment

CSN1, Sept. 17, 2007Crystal Collimation Experiment - W.Scandale8 TEVATRON MEASUREMENT GOALS 1.Channeled beam* 2.Volume-reflected beam* 3.Beam loss and radiation levels downstream of the crystal setup 4.Beam loss rate in the B0 (CDF beam-halo monitors) for 1- and 2- plane collimation 5.Possible deformation of the crystal or crystal holder during a vacuum baking process. 6.Attempt to study crystal damage: shock and integrated dose. (*) Add dedicated beam diagnostics Quantitative measure of collimation efficiency improvement is reduction of (3) – primary LHC concern – and (4). Simulate the deflected beam loss in the Tevatron and LHC (in collaboration with IHEP and CERN colleagues). Consistency with the current secondary collimator and absorber layout is of a concern here: need simulations and optimizations.

CSN1, Sept. 17, 2007Crystal Collimation Experiment - W.Scandale9 1.Demonstrate channeling with the existing strip crystal or with the ST4 crystal that was characterized in the September 2006 H8 experiment at CERN (by IHEP, CERN & INFN, arrived at Fermilab in March 07). 2.Confirm the preliminary result that crystal channeling and volume reflections can improve the Tevatron collimation system efficiency. 3.Perform detailed simulations of collimation system performance with a single strip crystal in the realistic Tevatron lattice for both channeled and volume-reflected beams. 4.Work out a plan on beam diagnostics improvement and specify new goniometer for 2009 beam studies. TASKS-2007 (TeV study time: 1.5 shifts = 12 hrs)

CSN1, Sept. 17, 2007Crystal Collimation Experiment - W.Scandale10 1.Build improved beam diagnostics system and new goniometer. 2.Develop new strip and multistrip crystals. 3.Complete EOS and proton-only store angular scans with the crystal chosen in Perform detailed simulations for a complete two-plane crystal-based Tevatron collimation system. 5.Try to perform tests to provide information about the possible deformation of the crystal or crystal holder during a vacuum baking process (up to 200 degrees). 6.Investigate a possibility for a crystal damage experiment where crystals and instrumentation for assessing dose rates could be placed in the Fermilab beams. Once enough beam is integrated on one crystal, it should be moved back to CERN for H8 beam line characterization. TASKS-2008 (TeV study time: 1.5 shifts = 12 hrs)

CSN1, Sept. 17, 2007Crystal Collimation Experiment - W.Scandale11 1.Install New Hardware:  Remove E01 collimator to replace with vertical crystal assembly  Crystal, goniometer, instrumentation tunnel installation GeV Beam Tests (1.25 shifts):  Test BLM response, inchworm and channel the beam  Debug all motion control and instrumentation GeV End-of-Store Beam Studies (4.75 shifts):  Find and characterize channeling (V-plane)  Collimate channeled beam (V, H)  Collimate volume-reflected beam (V, H)  Attempt full channeled collimation (V&H)  Attempt full volume-reflected collimation (V&H)  Repeat with another crystal type TASKS-2009 (TeV study time: 6 shifts = 48 hrs)

CSN1, Sept. 17, 2007Crystal Collimation Experiment - W.Scandale12 Demonstrate efficiency of a well-prepared bent crystal collimation system for 2 planes with channeled and volume-reflected 1-TeV beams at least for two crystal types (single and multi- layer) in comparison with tungsten target results. GOAL-2009

CSN1, Sept. 17, 2007Crystal Collimation Experiment - W.Scandale13 COLLABORATION CONTRIBUTIONS CERN: Experiments at H-8 beamline, manpower, beam characterization of “TeV” crystals to guarantee success at Tevatron INFN: manpower, crystal preparation, etching, mechanical and optical characterization, goniometer, roman-pots and trackers for the inspection of the deflected beams and for the measurement of the collimation efficiency. (? 350 keuro for ‘08 and 200 keuro for ‘09 ?) IHEP: manpower, crystal preparation, etching, characterization; simulations, new crystal technologies PNPI, JINR: manpower, theory, simulations, beam diagnostics, DAQ, new crystal technologies KEK: manpower, beam diagnostics Fermilab*: crystal and other hardware implementation in the Tevatron, EOS beam time, beam diagnostics, DAQ, simulations, deformation/damage tests SLAC*, BNL*: manpower, beam diagnostics, deformation and damage tests (*) As a part of the LARP project

CSN1, Sept. 17, 2007Crystal Collimation Experiment - W.Scandale14 DELIVERABLES 1. Conclusive data and directly relevant input for decisions on a possible upgrade path for LHC collimation: improved collimation efficiency and reduced irradiation of downstream components in a quantitative agreement with corresponding calculations, and quantitative answers to the questions on damage limits and sensitivity analyses. 2. Crystal technology, process (channeling or volume reflection), hardware (goniometer etc.) & instrumentation most suitable for 2-plane collimation of LHC beams, transferred to CERN.

CSN1, Sept. 17, 2007Crystal Collimation Experiment - W.Scandale15 LARP SUPPORT This proposal was presented to the LARP Collaboration meeting in April 2007 and at the FNAL Accelerator Advisory Committee in August It was very welcomed at the two meetings. It was noted that the timing is right and critical (next year start would be too late). The proposal was supported by the LARP Accelerator System management, DOE Review and approved by the LARP Executive Committee. The FY08 budget request is $0.22M, while for FY09 it is $0.13M.

CSN1, Sept. 17, 2007Crystal Collimation Experiment - W.Scandale16 SUMMARY Demonstration of crystal-based collimation by utilizing unique possibilities provided at the Tevatron at the end of the experimental collider run opens doors to: Possible upgrade path for the LHC collimation system:  enhanced performance  reduced impedance  heavy-ion beam halo cleaning Possible complementary collimation systems:  Fermilab Recycler in Project X  ILC Beam Delivery System  Muon Collider With all of the above, we are now seeking for the INFN CSN1 support of this proposal.