Austin Energy Elevated Requests for High Reliability Service South West Electric Distribution Exchange (SWEDE) May 8, 2015 David Tomczyszyn, P.E. – Distribution.

Slides:



Advertisements
Similar presentations
DISPUTES & INVESTIGATIONS ECONOMICS FINANCIAL ADVISORY MANAGEMENT CONSULTING Early Lessons Learned from DOE-EPRI Framework Experience Melissa Chan MA DPU.
Advertisements

Introduction Build and impact metric data provided by the SGIG recipients convey the type and extent of technology deployment, as well as its effect on.
VSE Corporation Proprietary Information
Constellation Heating and Cooling Building Automation Systems.
Pentagon Washington, D.C. UMCS contract for modernization of the Pentagon Scope includes: Design, engineering and commissioning of the Building Operations.
Fully Compliant Cloud Based Repository Lessons along the way Mark Ellis, Electronic Records Management Consultant April 8th, 2014.
Dynamic Distribution Grids © 2012 San Diego Gas & Electric Company. All trademarks belong to their respective owners. All rights reserved. Neal Bartek.
DOD Microgrids The Missing Link: Microgrid Applications Michael Dempsey P.E. Burns & McDonnell June 12, 2013 © 2013 Burns & McDonnell. All Rights Reserved.
Data Center Site Infrastructure Tier Standard: Topology Dr. Natheer Khasawneh Sadeem Al-Saeedi (8276)
1 Pacific Gas & Electric Company MTS: Evolution of the Electric Distribution System Manho Yeung, Senior Director, System Planning and Reliability PG&E.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II ASAC Review Conventional Facilities Briefing Electrical Utility Service Dennis Danseglio, P.E. Project Engineer.
Reporting the Economics of Reliable Energy Ralph Fehr, P.E. Engineering Consultant Reliability of the U.S. Power Grid.
IMPACTS OF LARGE DISTRIBUTED GENERATORS ON CENTERPOINT ENERGY’S DISTRIBUTION SYSTEM 1 Presented by Ed Briggs, P.E. Manager of Electric Distribution Planning.
Location of the theme gray Location of the theme blue ZTE Proprietary On Reliability of COTS Hardware Dr. Li Mo Chief Architect, CTO Group.
All content in this presentation is protected – © 2008 American Power Conversion Corporation Rael Haiboullin System Engineer Capacity Manager.
A New Building Data Center Upgrade capacity and technology step 2011 – May the 4 th– Hepix spring meeting Darmstadt (de) Pascal Trouvé (Facility Manager.
Siemens sans siemens sans bold siemens sans italic siemens sans italic bold siemens sans black siemens black italic Siemens Building Technologies.
THE ELECTRIC SUB STATION
Cogeneration at UC July 18, Welcome 3 Transformation of the Power Plant POWER PLANT CENTER OF CAMPUS CENTRAL UTILITY PLANT 2007.
1 Power Quality Mary Santori, P.E. Senior Engineer September 12, 2013.
Chicago Department of Water Management Thomas H. Powers, P.E. Commissioner Leadership Summit June 2, 2015.
APPA Engineering and Operations Technical Conference Atlanta, Georgia April 13-18, 2007 “Nailing the Basics” Earns Princeton, IL RP3 Diamond Award.
Section 3 TRANSMISSION & DISTRIBUTION US Bulk Power Transmission System Transmission & Distribution (T&D) Components New T& D Technologies This product.
Distribution Automation: Fault Detection, Isolation, and Restoration
NASHVILLE ELECTRIC SERVICE | Association for Financial Professionals March 2012.
AFREPREN/FWD Cogen Centre Training Workshop on Cogeneration in Africa
Standards Committee Rules/Standards July Committee Members  Rodney CatesCarteret CountyJim SoukupCity of Durham  Perry DavisCleveland CountyChristy.
Overview of Southern Company Transmission
Managing Reliability and the Markets with PI
Utility Engineers, PC.  Generation  Transmission  Distribution.
CHP & DG METERING & MONITORING IN NEW YORK STATE CASE STUDIES AND IMPLEMENTATIONS Presented By: STEPHEN STONE, PE DSM ENGINEERING ASSOCIATES, PC
Jesus A. Guerra, P.E. Distribution System Reliability CenterPoint Energy SWEDE 2011.
Welcome. GRU South Energy Center Anderson Illustration Association, Inc Phase 1 – 500,000 sf – 192 beds Build out – 3 M sf - 1,200 beds Shands.
2006 Hurricane Preparedness June 5, 2006 Sumter Electric Cooperative, Inc R. Ben Brickhouse: Director of Engineering & IT John J. LaSelva: Director of.
Teknologi Pusat Data 12 Data Center Site Infrastructure Tier Standard: Topology Ida Nurhaida, ST., MT. FASILKOM Teknik Informatika.
2014 Storm Preparedness Jeff Brewer – Manager of Engineering Tri-County Electric Cooperative, Inc.
2015 Hurricane Season Preparedness Briefing Jorge Puentes Engineering Manager – Northeast and Northwest Divisions March 18, 2015.
Oncor Transmission Service Provider Kenneth A. Donohoo Director – System Planning, Distribution and Transmission Oncor Electric Delivery Co LLC
2014 Hurricane Season Preparedness Briefing Jorge Puentes Technical Projects Manager – Northeast and Northwest Divisions March 26, 2014.
WELCOME!. Who is T&T Power Group? WELCOME! Who is T&T Power Group? What can we do for you?
Utilities & Engineering Department16 Blossom St., Boston Introduction to the Hospital Emergency Power Supply System (EPSS) Jason D'Antona,
Douglas Bowman, PE, PMP Project Manager Entergy Corporation New Projects and Processes Ensure Power Transfer for Northeast Arkansas Customers.
©2003 PJM 1 Presentation to: Maryland Public Service Commission May 16, 2003.
Florida Keys Electric Cooperative Association, Inc. Storm Hardening Florida Public Service Commission May 1, 2008 Scott Newberry, CEO John Stuart, COO.
Power Resiliency at Water Utilities: What States Can Do Lauren Wisniewski U.S. Environmental Protection Agency ASDWA Webinar August 5, 2015.
Black Start Service in New England System Operator’s Perspective Robert B. Burke ISO New England Inc. July 23, 2002 IEEE - Chicago, Illinois.
UTC STUDY OF DISTRIBUTED GENERATION AND RECOMMENDATIONS Presentation for the Washington Future Energy Conference October 19, 2011.
Module 11 -Cost Estimation This module covers how to estimate project costs including: –Equipment costs – combination of procurement and installation (including.
Chapter 8. Electrical Systems
Tier Certification Explained
Progress Briefing - Energy Initiative
Irvine Ranch Water District Distributed Energy Storage Case Study
Utility Needs and Smart Grid for Major Storm Events
Distributed Generation
Infrastructure & Safety
Advanced Fuse-Saving Techniques
Subteam 1a Competitive Solicitations Framework Working Group Meeting
Implementing Effective Energy O&M Strategies on a Limited Budget
the high-voltage network of CERN ToMORROW
EE6501 POWER SYSTEM ANALYSIS
Circuit Breakers & Reclosers
Pacific Power Seismic Preparedness Update
Transmission Engineering
Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Smart Grid Overview] Date Submitted: [13.
2500 R Midtown Sacramento Municipal Utility District
Interconnection of AES With The Grid
Which path to Choose? Zero Carbon Glendale Project
Electrical Distribution System Basics
Safety Meeting Topics Standby Generator Safety
TxMAG presentation
Presentation transcript:

Austin Energy Elevated Requests for High Reliability Service South West Electric Distribution Exchange (SWEDE) May 8, 2015 David Tomczyszyn, P.E. – Distribution Design North Manager

Austin Energy 2 8 th largest community-owned electric utility serving 435,000 meters and a population of approximately one million 437 square miles of service area covering City of Austin, Travis County and portions of Williamson County. Owns and operates generation, transmission, and distribution System peak load MW Annual budget - $1.51 billion First public power utility in Texas to earn Diamond Level recognition (2011) as a Reliable Public Power Provider (RP3) by the American Public Power Association (APPA); again in 2013 (eligible every 2 years) ISO Certified T&D Organization since 2007 Austin, Texas

Definitions Emergency Power - “an independent reserve source of electric energy that, upon failure or outage of the normal source, automatically provides reliable electric power within a specified time to critical devices and equipment whose failure to operate satisfactorily would jeopardize the health and safety of personnel or result in damage to property.” - IEEE Std Optional Standby Systems – ”Those systems intended to supply power to public or private facilities or property where life safety does not depend on the performance of the system. These systems are intended to supply on-site generated power to selected loads either automatically or manually.“ – NEC, NFPA

Definitions Automatic Throw Over (ATO) / Automatic Transfer Switch (ATS) – a device which allows for the transfer of electric power from a preferred source to an alternate source if the preferred source loses power. Open Transition – break before make Close Transition – make before break Transfer Time – time required to switch from the preferred to the alternate source OR the alternate source back to the preferred source Retransfer – automatically switching back to the preferred source from the alternate source when the preferred source is restored 4

How does an ATO work?

Types of Customers 6 Government Hospitals and Nursing Homes Data Centers Corporations & Technology Companies Schools Water Treatment Plants

Data Center Tiers 7 Tier LevelRequirements 1 Single non-redundant distribution path serving the IT equipment Non-redundant capacity components Basic site infrastructure with expected availability of % 2 Meets or exceeds all Tier 1 requirements Redundant site infrastructure capacity components with expected availability of % 3 Meets or exceeds all Tier 2 requirements Multiple independent distribution paths serving the IT equipment All IT equipment must be dual-powered and fully compatible with the topology of a site's architecture Concurrently maintainable site infrastructure with expected availability of % 4 Meets or exceeds all Tier 3 requirements All cooling equipment is independently dual-powered, including chillers and heating, ventilating and air-conditioning (HVAC) systems Fault-tolerant site infrastructure with electrical power storage and distribution facilities with expected availability of %

Transfer Times 8 Type Emergency Power Restoration Time – NFPA UBasically Uninterruptible (UPS Systems) 1010 sec 6060 sec sec MManual stationary or nonautomatic - no time limit Standby Power - Transfer TimesAE Dual Feed Services Determined by Customer EquipmentDirect or Dedicated Feeds 1-3 secPowell or S&C PME ATO 7-10 secVista ATO UPS Source: APC – Schneider Electric Flywheel Source: VYCON - Schneider Electric

High Level Dual Feed Process 9 Planning reviews existing system loads to determine sources, recommends a preliminary feeder routing, and Provides customer with an order of magnitude estimate. Design & System Engineering design both the on-site and off-site services, requisition equipment and collect payment. Customer requests have ranged from MVA with most services falling between 2-12 MVA. AE reviews request with the customer and recommends the best type of service (dedicated feeds, direct feeds, multiple ATOs, single ATOs, standard service, etc..) Construction, System Engineering, Control Engineering set, install, and commission the service.

Single Tank Vista ATO Source: S&C

Single Tank PME ATO Source: S&C Example: PME – 9 Source Transfer

PME ATO & Transformers 12

Dual Tank ATO 13 Source: Powell

Powell ATO & System VI PM 14

2 Direct Feeds & System VI PM 15

Cost of Dual Feed Service 1)Initial assessment fee - $6000 per site 2)Capacity reservation & maintenance Fee - $3,100/MVA per month 3)Facilities design and construction – cost* + 15% per fee schedule - approximately $250K to $1M+ per installation depending on distance to source and type of service requested * Effective Oct 1 st, 2014 AE line extension policy was changed to 100% of estimated cost for labor and material 16

Design & Operations  Do you need redundant transmission feeders, power transformers, circuit routing, ATOs, distribution transformers, etc..?  Will the customer have direct OR dedicated feeds?  Should you add a bypass switch to your design for maintenance purposes?  Should you coordinate your ATO transfers with your substation breakers to ride through the 1 st reclose?  Do you manually do a retransfer or do you allow the ATO do it automatically? 17

Lessons Learned  Multiple dual feed studies for real estate companies  Data center operator competition  Maintenance program / staffing levels  Customer’s ability to move load when two feeds are provided at one time – consider a contract  Do you need communication to monitor your equipment? 18

Questions? David Tomczyszyn, P.E. Office: