ALL GROWN UP PROJECT ADULTHOOD Matt Looney Section Engineer’s Meeting Spring 2014.

Slides:



Advertisements
Similar presentations
Project Estimates There are two types of estimates 1Partial Payment Estimate 2Final Payment Estimate.
Advertisements

FAA Project - Bidding Phase FAA Recommends.. Consider how you would like to bid the project early on in the design. Due to possible budget constraints.
Unauthorized Commitments
Change Order Missouri Local Programs How to Complete a Change Order & Get it Approved.
Field Orders on Construction Contracts Guidance Document CLC-8 May 13, 2013.
Managing a Successful Mechanical System project Following design – what next?
14.21 Contract Closeout Procedure Update Notice of Completion, Release of Retention and Punchlist Resolution December 8, 2005.
Engineers/Contractors Meeting Lexington, KY Steven Criswell Division of Construction.
Marcy Mealy Procurement Specialist CDBG Program
Community Facility Loans/Grants Architect Flow Chart Owner has need for project. RD Area Office is contacted. RD visits project site and discusses project.
AUDITS Process and Corrective Actions OIG RolesGAO ROLES – OIG –OIG Lead Auditor –OCFO – owner of MATS and Agency Audit Process –OEI AA – Designated OEI.
CBER Managed Review Process Sheryl A. Kochman Deputy Director, DBA, OBRR, CBER September 15, 2009.
WELCOME TO THE PROCUREMENT SEMINAR Procurement and Contracts An Overview of Contract Administration.
Sole Source Training.
Discussion Topics Construction Contract Administration Lessons Learned Other Construction Issues Questions? / Comments (Anytime)
Subcontract Requests. P rocess After the notice to begin work is issued, Construction Procurement uploads the contract into SiteManager. At that point.
1 Addendum Preparation Process ESC-OE Caltrans. 2 Introduction An addendum is a change in contract requirements for an advertised project for which bids.
Work Plan Development Aschalew Aberra Highway Utility Engineer, INDOT November 20, 2013.
Discussion Topics Construction Contract Administration Other Construction Issues Questions? / Comments (Anytime)
Field Questions. –Asked by sub or GC when discrepancy in construction docs or existing site conditions Design change verification request Field information.
Mn/DOT AUDIT COUNTY HIGHWAY ACCOUNTANTS SINGLE AUDIT DISCUSSION.
Closing Out a Federal Aid Construction Project Missouri Local Programs How to Close-Out a Federal Aid Construction Project.
District Operations Contracts Office / Final Estimates Jennifer Taylor Steve Lange John Burnette.
MARCH 9, 2006 Boating Safety and Enforcement Grant Program Regulations Stakeholder Workshop Proposed Conceptual Regulations Department of Boating and Waterways.
CONSTRUCTION ADMINISTRATION Measurement and Payment Dr. Alaattin Kanoğlu Spring, 2013 Professional Practice Management I.B.U. Architecture Undergraduate.
Go CATS!!!. KAHC-KYTC Joint Meeting March )Construction Information on Web 2)Formal Acceptances 3)Final Pay Estimates 3\16\07.
Highway Utility Engineer, INDOT
Title V, Preliminary Completeness Review. What do I need to do?  I need to find out if the application contains the required information.  Initial Title.
Connections II Acquisition U.S. General Services Administration Connections II Industry Day April 13th, 2010.
OTC Pres Project Del P5 12/08 Page 1 Project Delivery Performance Improvement Report to the Oregon Transportation Commission Jeff Gower, State Construction.
1 RMS Training RMS BASICS July Before you start RMS Six basic steps to success: 1.Establish offices (enter descriptions of offices) 2.Enter staff.
KYTC Change Order (Contract Modifications).
PROJECT DEATH Stephanie Rich. Corrective Work Punch List Punch List Work Complete Date Work Complete Date Request Final(s) Request Final(s) Comprehensive.
CONDUCTING BUSINESS WITH THE TOWN OF MIAMI LAKES Construction Services October 28, 2013.
 Final Inspection Reminders  and  Recurring Corrective Work Items.
Kentucky Transportation Center Contractor Performance Evaluations S TEPS AND G UIDANCE Kentucky Transportation Center Kentucky Transportation Cabinet.
CHANGE ORDER/CLAIMS MANAGEMENT MODULE 9. Change Order Management.
SCHEDULE MANAGEMENT MODULE 8. Required by Specification City/Caltrans Level 1 schedule – simple Less than $1 million, less than 100 working days Advanced.
QUALITY ASSURANCE MODULE 3. Definitions Quality Assurance - A process/effort that ensures that processes are followed, that the processes of doing right.
NJDOE Testing for Lead in School Drinking Water
Level 1 timeline of activities Links to helpful documents
Award Management Post Award By Ana Ayala College of Engineering Director of Finance.
Terminating Contracts and CLINS
Final Report.
CONTRACT ADMINISTRATION
Administration of a FIDIC Contract - Project Control
Dealing with Faculty Personnel Issues
Administration of a FIDIC Contract - Commencement Date to + 28 Days -
Document control MODULE 4.
Construction Oversight
Contract Basics For State Agencies.
Managing Outgoing Subawards April 18, 2017
LOCALLY ADMINISTERED PROJECTS
Sponsored by the RMS Center
OSD Verification of Certification
MnDOT Office of Civil Rights Disadvantaged Business Enterprise (DBE) Special Provisions Update March 2017.
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Request for Proposal & Proposal
THE OFFICE OF PROCUREMENT CONTRACT TRAINING MAY 2018
Force Accounts.
Administrator of Construction Todd Wilson Senior Project Manager
Brown Bag Breakfast Briefing: Professional Service Providers
Role and Responsibility for Quality Assurance Vishnu P. Shrestha
ARCH 435 PROJECT MANAGEMENT
Creating a Contract for Category 1
Directed Change Constructive Change
Txdot field inspection
Diversity management system (DMS)
Role and Responsibility for Quality Assurance Vishnu P. Shrestha
Project Manager / Utility Liaison
Presentation transcript:

ALL GROWN UP PROJECT ADULTHOOD Matt Looney Section Engineer’s Meeting Spring 2014

CHANGE ORDERS You get to hear about this is the next presentation by BOB!

MYLARS & CONSTRUCTION REVISIONS WHEN IS A CONSTRUCTION REVISION NECESSARY – RIGHT-OF-WAY CHANGE – TYPICAL SECTION CHANGE – MAJOR DESIGN FEATURE CHANGE MYLARS No Longer Required REVISION NEEDS TO COME WITH DRAFT CHANGE ORDER GUIDANCE MANUAL CST-301

WHY CAN’T WE ALL JUST GET ALONG  CLAIMS

CLAIMS SPECIFICATION & CONSTRUCTION ENGINEER RESOURCE CENTER ON WEB IF THERE IS AN IMPASSE, ADVISE CONTRACTOR THE CLAIMS PROCESS IS AVAILABLE RESPOND WITHIN SPECIFIED TIMEFRAME TO NOTICE OF CHANGED CONDITION CONTRACTOR IS RESPONSIBLE FOR TRACKING WORK – SECTION ENGINEER PROVIDES FORM TC PER SECTION E – SECTION ENGINEER SHOULD CHECK AND SIGN EACH DAY THIS IS HOW THE DEPARTMENT WILL ULTIMATELY CHECK ANY SUBMITTED CLAIM IF A FORMAL CLAIM IS SUBMITTED, IT MUST BE EVALUATED ACCORDING TO SECTION AND GUIDANCE MANUAL CST 311

VALUE ENGINEERING CID XX-XXXX, project. A project barely buildable. Cabinet, we can build it better. We have the technology. We have the capability to build Kentucky's first bionic project. CID XX-XXXX will be that project. Better than it was before. Better, stronger, faster.

VALUE ENGINEERING SEE SPECIFICATION SECTION 111 & GUIDANCE MANUAL SECTION CST 312 ENSURE ALL INFORMATION REQUIRED BY SECTION IS IN SUBMITTAL – DETAILED DESCRIPTION OF WORK & CHANGES – COMPLETE SET OF PLANS & CONSTRUCTION DETAILS – DETAILED COST ESTIMATE FOR WORK PERFORMED UNDER EXISTING CONTRACT & PROPOSED CHANGE INCLUDING BREAKDOWN OF PRICING FOR LABOR, EQUIPMENT, MATERIALS, ETC. – DETAILED COST ESTIMATE FOR NON-CONTRACT ITEMS – DETAILED CHANGES IN FUTURE COSTS TO CABINET – WHAT EFFECT VE WILL HAVE ON PROJECT COMPLETION DATE DISTRICT REVIEWS VE PER SECTION

VALUE ENGINEERING District submits Value Engineering proposal to Central Office Construction for Review (With District Recommendation). Director of Construction makes decision as to whether or not to accept VECP and informs Contractor by Letter. If approved, a change order will be processed to pay Contractor.

PROGRESS ESTIMATES SHOW ME THE MONEY!!

CHECK AND RESOLVE ANY DISCREPANCIES PROGRESS ESTIMATES SEE GUIDANCE MANUAL CST 302 MUST BE CHECKED BEFORE BEING APPROVED CHECK FUNDING LINES FOR ANY FLAGS BEFORE APPROVING $ $ $ $

SECTION ENGINEER PUNCHLIST ARE WE DONE YET?

SECTION ENGINEER PUNCHLIST REFER TO SPECIFICATION SECTION DURING LIFE OF PROJECT, PROVIDE WRITTEN LIST OF CORRECTIVE WORK TO CONTRACTOR AND UPDATE AS NEEDED. – MAKE SURE CONTRACTOR UNDERSTANDS PROJECT WILL NOT BE CALLED COMPLETE UNTIL SECTION ENGINEER’S LIST IS COMPLETE – WHEN WEATHER OR OTHER “COMPELLING” REASONS EXIST, SECTION ENGINEER CAN CALL PROJECT COMPLETE BEFORE PUNCHLIST IS COMPLETE AND LET ITEMS CARRY OVER TO FINAL INSPECTION REPORT. IF USED PROPERLY, THE SECTION ENGINEER PUNCHLIST SHOULD GREATLY LIMIT THE LIST OF CORRECTIVE WORK INCLUDED ON FINAL INSPECTION REPORT

WORK COMPLETION NOTICE “THIS IS THE END”

WORK COMPLETION NOTICE SPECIFICATION SECTION Generated from PROCESS LIST in SITEMANAGER DATES ARE AUTO-FILLED IN FROM KEY DATES – COMPLETE KEY DATES IN SM BEFORE GENERATING REPORT SEND COMPLETION NOTICE TO CONTRACTOR, DISTRICT TEBM FOR PD&P AND CENTRAL OFFICE LIAISON – SEE CONSTRUCTION MEMO REPORT INCLUDES TYPES OF INSPECTIONS NEEDED – TYPE “YES” IN SM NEXT TO ALL TYPES OF INSPECTIONS REQUIRED

QUESTIONS? Contact Info (502)