ECAL Shift Duty: A Beginners Guide By Pourus Mehta.

Slides:



Advertisements
Similar presentations
J. Varela, CERN & LIP-Lisbon Tracker Meeting, 3rd May Partitions in Trigger Control J. Varela CERN & LIP-Lisbon Trigger Technical Coordinator.
Advertisements

Clara Gaspar on behalf of the LHCb Collaboration, “Physics at the LHC and Beyond”, Quy Nhon, Vietnam, August 2014 Challenges and lessons learnt LHCb Operations.
P5 Meeting - Jan , US LHC University M&O Personnel University with major hardware responsibility at CERN Based on > 10 years of US Zeus experience.
CMS ECAL Prompt Feedback Group Toyoko J. Orimoto, California Institute of Technology A Brief History: From GRUMM to First BeamThe Future of the ECAL PFG.
First CMS Results with LHC BeamToyoko Orimoto, Caltech 1 First CMS Results with LHC Beam Toyoko Orimoto California Institute of Technology On behalf of.
DAQ2 Shift TutorialcDAQ group1 Monitoring of the DAQ2 system.
Cosmic Rays Data Analysis with CMS-ECAL Mattia Fumagalli (Università di Milano Bicocca) CIAO!
Central DQM Shift Tutorial Online/Offline. Overview of the CMS DAQ and useful terminology 2 Detector signals are collected through individual data acquisition.
Central DQM Shift Tutorial Online/Offline. Overview of the CMS DAQ and useful terminology 2 Detector signals are collected through individual data acquisition.
Central DQM Shift Tutorial Online/Offline. Overview of the CMS DAQ and useful terminology 2 Detector signals are collected through individual data acquisition.
Offline Tracker DQM Shift Tutorial. 29/19/20152 Tracker Shifts Overview Online Shifts at P5 (3/day for 24 hours coverage) – One Pixel shifter and one.
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
Requirements Review – July 21, Requirements for CMS Patricia McBride July 21, 2005.
11 CTP Training A.Jusko, M. Krivda and R.Lietava..
ILC Trigger & DAQ Issues - 1 ILC DAQ issues ILC DAQ issues By P. Le Dû
Offline shifter training tutorial L. Betev February 19, 2009.
David BAILLEUX US CMS on behalf of the Caltech group Laser Monitoring System - Electronics review 20 March Overview Overview Laser control Laser.
CAF shifts and procedures Marcello, Raffaello, Alberto, Pigi, Sungeun, David, Silvia, Anna & all the 2009 shifters.
OFFLINE TRIGGER MONITORING TDAQ Training 5 th November 2010 Ricardo Gonçalo On behalf of the Trigger Offline Monitoring Experts team.
A.Golunov, “Remote operational center for CMS in JINR ”, XXIII International Symposium on Nuclear Electronics and Computing, BULGARIA, VARNA, September,
Click to add Text L. CONEY1 MICE Shifter Training June 2015.
Collisions… … with “non-stable beams” maybe on Thursday –Got experts to converge on goal and how to do it … to check timing, using L1 = zero-bias seeding.
ALICE Pixel Operational Experience R. Santoro On behalf of the ITS collaboration in the ALICE experiment at LHC.
DOE Review Adi Bornheim California Institute of Technology July 25, 2007 CMS ECAL Status, Test Beams, Monitoring and Integration.
E-log is a very clever software written by Steffen Ritt from PSI It can do lots of things and can be used well. Will give you an example of use by NA61.
1 Checks on SDD Data Piergiorgio Cerello, Francesco Prino, Melinda Siciliano.
Pixel DQM Status R.Casagrande, P.Merkel, J.Zablocki (Purdue University) D.Duggan, D.Hidas, K.Rose (Rutgers University) L.Wehrli (ETH Zuerich) A.York (University.
Preparation for CERN TB - Erika Garutti1 Preparation for CERN test beam H6 test beam area in Prevessin.
First CMS Results with LHC Beam
6. Shift Leader 1. Introduction 2. SL Duties 3. Golden Rules 4. Operational Procedure 5. Mode Handshakes 6. Cold Start 7. LHCb State Control 8. Clock Switching.
Software for the CMS Cosmic Challenge Giacomo BRUNO UCL, Louvain-la-Neuve, Belgium On behalf of the CMS Collaboration CHEP06, Mumbay, India February 16,
CMS livetime during last week’s runnin 11 Sep 2012G. Rakness (UCLA)1 Fills  1.02/fb delivered, 0.98/fb recorded 96.1% live ~2.4% not running.
ECAL Off detector Electronics Workshop Lisbon April T. Camporesi ECAL activity sites 2005 Integration (now) 904 (now) Cosmic ray calibration (May)
Online Consumers produce histograms (from a limited sample of events) which provide information about the status of the different sub-detectors. The DQM.
LHC CMS Detector Upgrade Project RCT/CTP7 Readout Isobel Ojalvo, U. Wisconsin Level-1 Trigger Meeting June 4, June 2015, Isobel Ojalvo Trigger Meeting:
CSC Shifter Training Course – Global Running Fred Borcherding Reach from CSCOperations Twiki page or directly:
AEM, Sept Frank Chlebana (Fermilab) Status of the LHC and CMS Frank Chlebana (Fermilab) All Experimenter’s Meeting Sept
1 ECS CALO LED Control System CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  Introduction  Calorimeter ECS LED monitoring.
ID Week 13 th of October 2014 Per Johansson Sheffield University.
CMS Status & Commissioning Menu: 1 Recent Progress Commissioning Prior to and After First Beam Commissioning with first LHC Events Outlook Wolfgang Funk.
The LHCb Online Framework for Global Operational Control and Experiment Protection F. Alessio, R. Jacobsson, CERN, Switzerland S. Schleich, TU Dortmund,
1 Calorimeter LED & LV - HV control systems LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Outline Status of the calorimeters LV & MV power supplies.
ATLAS Tile Calorimeter Data Quality Assessment and Performance
CMS ROC Report Patricia McBride May 26, 2005.
DAQ Status and Prospects
Central DQM Shift Tutorial Online/Offline
P. Paolucci G. Pugliese M.Tytgat
Draft of to institute heads
F. Bellini for the DQM core DQM meeting, 04th October 2012
Central Online DQM Shift Tutorial March 2017, CMS DQM group
Shift instructions August 16, 2017 Antoni Aduszkiewicz
Approved Plots from CMS Cosmic Runs (mostly CRUZET, some earlier)
Preparation for CERN test beam
Offline shifter training tutorial
Commissioning of the ALICE HLT, TPC and PHOS systems
PEDESTAL STABILITY OF HCAL DURING GLOBAL RUNS AND 2009 CASTOR DQM ANALYSIS Emine GÜRPINAR Cukurova University 7/31/2018.
Pixel DQM Status & Plans
Group CERN Taylan Yetkin Post-Doctoral Research Scholar.
Offline shifter training tutorial
Data Quality Monitoring of the CMS Silicon Strip Tracker Detector
HCAL Commissioning and Related Activities
Central DQM Shift Tutorial Online/Offline
DQM (Local and FNAL ROC) & Event Display experience at MTCC
Shift Leader Tutorial Made by : Maria Chamizo Andrea Barisone
SLB Synchronization in H4 Beam (LIP - Lisbon)
CMS Pixel Data Quality Monitoring
DQM for the RPC subdetector
CMS Pixel Data Quality Monitoring
CSC Shift Training and Operation + B904 Status
Presentation transcript:

ECAL Shift Duty: A Beginners Guide By Pourus Mehta

2 Types of Shifts  Sub-detector Shifts for ECAL, RPC, HCAL, Tracker, Castor & Pixels  Central Shifts: DQM, DAQ, DCS & Trigger  Expert On-Call Shifts Pre-requisites for ECAL Sub-detector Shifts Requirement to take Safety Courses Levels (1, 2, 3 & 4C) for access to CMS- CR & CMS-USC Need to Study Shift Tutorial Training Shifts to be taken Subscription for Shifts through Shift Selection tool

3 Shifters Duties  Read the Run Field Manager’s Current Plan  Fill the Run Checklist for every run (Run Time > 15 Minutes)  Write an E-Log for any problems or crashes  Monitoring FED Status for all FEDs participating in Global Run  Monitor Central DQM & ECAL DQM for Status of various Parameters  Monitor Beam Status and give feedback to LHC-CR  Take Local Runs incase ECAL (EB + EE) or Preshower (ES) fails  Write Shift Summary  In rare cases, Take control of DCS from central DCS

4 Run Check-list Plots Summary Plots Event Types Data integrity FED status Data occupancy & Data timing Trigger occupancy & Trigger timing FED event size Selective Readout occupancy Calibration sequence quality Calibration sequence occupancy (EB & EE) Laser amplitude & timing LED amplitude & timing (EE) Laser fast check MEM occupancy & integrity LED system

5 Summary Plots Event TypesFront-End Status

6 ECAL E-Log

7 FED Status page

8 Data Quality Management Portal (Central & ECAL)

9 Beam Status ( Courtesy LHC CR )

10 Shift Summary Report

11 Detector Control System (DCS)

12 THANK YOU