Common Systems – Holger Kollmus Holger Kollmus FAIR - Machine Advisory Committee Meeting 10.11.2011 Common Systems and Controls.

Slides:



Advertisements
Similar presentations
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Advertisements

JINRs PARTICIPATION IN SIS100 & SIS300 JINRs PARTICIPATION IN SIS100 & SIS300 5 th WORKSHOP on the SCIENTIFIC COOPERATION between GERMAN RESEARCH CENTERS.
CEA DSM Irfu - Bernard GASTINEAU - R3B Technical Board Meeting -April 4, Reactions with Relativistic Radioactive ions Beams GSI Large Acceptance.
Introduction 1 Proposal for the structure of FAIR GmbH construction phase 2 Relationship between FAIR GmbH and GSI mbH construction phase Contract Site.
Status of the LHC Project L.Evans - C.Wyss Riunione CSN1 INFN Napoli, 21 Settembre 2005.
Applied superconductivity group L. García-Tabarés, F. Toral, I. RodriguezCIEMAT, I/2008.
(C.Betz Kick-Off Meeting Vacuum 5th March 2013) Agenda: First steps using WinCC OA First steps using UNICOS V5 Vacuum Test Rig Principles of.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
HIE-ISOLDE (High Intensity and Energy) project Protection of superconducting solenoids MPE work shop – December 14, 2010 G.J. Coelingh TE-MPE-CP.
Prospects of SC Quadrupole Production at IHEP-Protvino The 2nd Institutes Meeting on International Construction of the FAIR Accelerator Complex Protvino,
Helmholtz Centre for Ion Research D. Krämer, 2nd Lab Directors Meeting, Protvino, January 15-16, 2008 Design and Engineering Issues; Standardization and.
Progress Report Günther RosnerNuPECC, Copenhagen, 15/6/121.
Global Design Effort Push-pull studies How to proceed LCWS07 June 1, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi.
Thoughts about the MQXF development plan P. Fessia Thanks to discussions within the MDT section (P. Ferracin, J. C. Perez, E. Todesco, P. Ferracin), L.
WP3 Required interfaces for cryostat design / integration Patxi DUTHIL SPL 3 rd Collaboration Meeting, CERN, Geneva November 12 th 2009.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
Workshop 12/04/2006AT/MTM SM18 Test Facility A. Siemko "Workshop on Test Facilities and measurement equipment needed for the LHC exploitation"
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities.
Paris 5 September 2005 HHH Status progress W. Scandale CERN Accelerator Technology Department CARE-HHH Network: coordinators: F. Ruggiero and W. Scandale.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Jürgen Florenkowski GSI, Darmstadt Agenda Annual Report Meeting EU construction ( CNI ) contract "DIRAC-PHASE-1" for the FAIR project September 26, 2006.
1 1. Some recent views ( ) 2 Linac tunnel
Peter Spiller, COLMAT-Kick off meeting, Cryo-Collimator, CERN, COLMAT Kick-off meeting CERN Peter Spiller Cryo-Collimator (Catcher) for.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
Status of the PMT light detection system Gian Luca Raselli 20-AUG-2015 ICARUS executive meeting.
ILC Test Facility at New Muon Lab (NML) S. Nagaitsev Fermilab April 16, 2007.
Management’s preliminary comments to the ERC Report FINANCE COMMITTEE June 19, 2002.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
1 V. Kashikhin for ILC ALCPG 2007, FNAL Meeting October 23, 2007 Ring to Main Linac Magnets.
4/27/06 1 US LHC ACCELERATOR RESEARCH PROGRAM brookhaven - fermilab – berkeley - slac US LARP Inner Triplet Cryogenics and Heat Transfer LARP Collaboration.
Interface of FP420 to LHC FP420 meeting 28-Sep-2006.
S UPER B site status report S. Tomassini INFN-LNF On behalf of SuperB Collaboration SuperB general meeting– Frascati – December 1-5, 2009.
H. Weick, 8 th MAC meeting, GSI, Super-FRS Status Target Area H. Weick / M. Winkler 8th FAIR - Machine Advisory Committee Meeting
O. Kester, NuSTAR annual meeting, 27/02/2013
Contents: -GSI organization structures -Tasks of GSI (accelerator) -Status of evaluations / technical developments -Overview -Note : (only) accelerator.
MAC meeting (12-13 January 2010) Machine Advisory Committee participants: B.Sharkov (ITEP/FAIR) P.Belochitskii (CERN) S.Ivanov (IHEP, Protvino) M.Steck.
Proposal for Microstation Prototype Jaak Lippmaa CERN 2005.
Progress Report Günther RosnerNuSTAR Annual Meeting, Darmstadt, 29/2/121.
Cost and schedule for ELENA Beam Transfer Systems W. Bartmann, J. Borburgh, E. Carlier, L. Ducimetiere, T. Fowler, M. Hourican, R. Ostojic, L. Sermeus.
Summary of IAPP scientific activities into 4 years P. Giannetti INFN of Pisa.
NIKHEF Annual Meeting, December 18, The LHC Project Status report to the NIKHEF annual meeting Jos Engelen Based on last week’s reports to CERN.
ELENA installation progress F. Butin / ELENA collaboration.
Peter Spiller, November 2012, Structure and Tasks of the Project Division Primary Beams Peter Spiller Machine Advisory Committee Meeting.
O. Kester, 6 th MAC meeting, Darmstadt, 10/10/2011 FAIR ACC planning and schedule O. Kester 6th FAIR - Machine Advisory Committee Meeting
WP High Beta Cavities Delivery
Preparation Phase of the FAIR Project
Status of the FAIR Project
Oleksiy Dolinskyy December 1st, 2014
Existing Prototype Test Facility (PTF) and planned Series Test Facility Schroeder, Claus Cryo-Review Darmstadt
Status of HESR 18th March Gießen Dieter Prasuhn.
CSP 25th November 2010 Technical agreement number 3: overview
Testing of SC Magnets Status - November 2010
ELENA installation and commissioning status
Installation of an Instrument on a CERN machine
Uppsala Commitment to ESS and FREIA Planning
on behalf of the RF group
(Procurement, testing of magnets)
Status of the PANDA Magnet
ESS RF Development at Uppsala University
Status of the cryogenic system for B180
GlueX Electronics Review Jefferson Lab July 23-24, 2003
TEST PLANS for HL LHC IT STRING
HIE-LINAC status report
IHEP Cryomodule Status
ThomX – Commissioning Meeting – 25/01/2018
East Hall under construction
CERN-FAIR Steering Committee
Presentation transcript:

Common Systems – Holger Kollmus Holger Kollmus FAIR - Machine Advisory Committee Meeting Common Systems and Controls

Common Systems – Holger Kollmus WP Common Systems WP (PSP No.): WP leader Deputy Electric power H. Ramakers H. Welker Detector gas supply M. Schwickert P. Forck Cryogenics M. Kauschke C. Schroeder Alignment I. Pschorn T. Miertsch Control system R. Bär U. Krause Link existing facilities O. Kester (acting) H. Eickhoff Installations/assembly H. Reich-Sprenger M. Bevcic Magnet testing P. Schnizer E. Fischer Quench detection E. Floch

Common Systems – Holger Kollmus Status and progress Cryogenics Cryogenics:  Constantly updated heat load definition.  Work on site planning for the compressor building.  Work on the compressor layout and the electrical power consumption.  Planning on HeSu cryo plant and the refurbishment of DESY cryo plant (not part of FAIR cost book but can be used for FAIR R&D and training). There is a detailed presentation this afternoon!

Common Systems – Holger Kollmus Status and progress Alignment Alignment:  Study to develop a measurement system for use in highly activated machine environments is ongoing.  The general requirements for manufacturers as well as specific requirements for first magnet types in order to align are defined.  The performance requirements for all the accelerator alignments are defined.  Test measurements on superconducting magnets for the determination of the dynamic behavior of the cold mass vs. the cryostat.

Common Systems – Holger Kollmus Status and progress Controls Control system:  Advanced development of the FESA software framework for component control.  Advanced development on the accelerator-control data supply LSA.  Positive evaluation of the LSA framework with SIS18. SIS18 controls will fully migrated in  There is a strong collaboration with CERN also to develop the timing and event distribution system and on the production of first prototypes for switches and receivers.  The prototype manufacturing of a standard device controller is nearly finished.  Fruitful collaboration with CERN also on industrial slow control using PCL with UNICOS and WinCC OA (former PVSS).  A proposal for an in-kind contribution from Germany and Slovenia is submitted to the next IKRB.

Common Systems – Holger Kollmus Status and progress Controls II

Common Systems – Holger Kollmus Status and progress Link Existing Facility Link existing facility:  Strongly increased stripper efficiency.  Improved transmission through UNILAC.  World record intensity in the SIS18 reproducible observed.  The dynamic vacuum effect is cured by a ion catcher system and high pumping speed in the injection Septum combined with a optimized injection.  NEG coating of dipole and quadrupole chambers finished.  The optical beam layout studies for the transfer lines from the p-LINAC to SIS18 and from SIS18 to SIS100 are done.  Radiation safety calculations for shielding improvements are in progress.

Common Systems – Holger Kollmus Status and progress Assembly an Installation Assembly and installation:  Pre mounting areas in testing hall (north part) are provided.  Storage areas are in preparation and different scenarios are investigated.  Call for tender for an internal logistic system is in preparation and will be completed in It will be commissioned in the next projects.  All technical guidelines are defined.

Common Systems – Holger Kollmus Status and progress Magnet Testing Magnetic testing  Development of various options and scenarios for magnet testing.  Negotiations with CERN regarding SuperFRS magnetic testing. First meeting was on the 26 th of September. Further contact with KIT.  Evaluation of potential sites for SIS 100 quadrupole magnet testing.  Evaluation of potential sites for SIS100 dipole magnet testing at GSI.  Proposal for an in-kind contribution from Germany. There is a detailed presentation this afternoon!

Common Systems – Holger Kollmus Status and progress Quench Detection Quench detection  The first functional specification will be ready end of November  A quench detection expert meeting (inviting specialists for CERN, Desy and KIT) will be organized for January  The complete functional specifications will be finalized in April  A collaboration with KIT was started in August  Development of quench protection at KIT is starting right now.

Common Systems – Holger Kollmus WP 2.14 – Work Package Descriptions and Time Schedule WPDTS Electric power x Detector gas supply Cryogenics in preparation Alignment * Control system Link existing facilities in preparation Installations/assembly SuperFRS Magnet testing in preparation Quench detection in preparation *strongly dependent on other subproject schedules

Common Systems – Holger Kollmus WP 2.14 – Summary  Time planning ongoing. The tasks strongly depend on other subprojects.  Proposal for in-kind contributions for controls and magnet testing (SIS100 dipoles) is submitted to the next IKRB.  Cryogenic HeSub and Cryo1 should be submitted to next IKRB.  Magnet testing scenario for SuperFRS and SIS100 quadrupole magnets should be decided soon. Long term work packages:

Common Systems – Holger Kollmus ENDE Electric power: The planned electrical power topology is negotiated with the local power company. Two new 110kV lines are in planning. Empty tubes will be piped in spring The FAIR 20 kV and 400V grids are in planning. There is work ongoing on the magnet power supply Detector gas supply: Requirements are specified, detailing system design nearly finished (mid. October), strong collaboration with FAIR civil construction. The task is comparable with cabling and other CC staff. Next step: adoption of CC planing for module 0 to 3.

Common Systems – Holger Kollmus Some activities Cryogenics: * Planning on HeSu cryo plant and the refurbishment of DESY cryo plant * Work on HTS current leads * Planning on buzz bar routing Alignment: * Fiducialization of components at GSI  benches for measurements, secure know how at GSI, training of staff Control system: * Continue general system design and technical developments (Timing, FESA, etc.) * FESA v3.0-beta available for prototype device class developments * First timing system WR-switch hardware prototype available for testing * Project to deliver commissioning cs to CEA for p-source/LEBT in Q3/2013 initiated Magnet testing: * Planning on upgrade of existing test bench (Power supply) * Planning on the test benches for the series magnets * Estimation of required resources for the SIS100 magnet testing (Personnel, invest) Quench detection: * Definition of voltage sensitivity of the system for the different magnets

Common Systems – Holger Kollmus Major problems and risks and according mitigation actions Control system: * No experience for controls of cryogenic systems  Collaboration with CERN (general support, training at CERN)  hire 1 automation engineer  gain experience on DESY cryo plant at GSI and S100 dip. magnet testing installation Magnet testing: * No man power for series testing * In case of external testing  man power for follow up * Quality assurance strategy for SC magnets * Cryo plant for testing  Hiring temporary staff Quench detection: * Now R&D concerning quench detection done (Voltage detection  long distances between magnets and electronic devices) * Lack of man power: A single person is working on a topic which requires 3 people * Missing know how at GSI on quench det. Electronics  Get KIT and CERN involved, get EE at GSI involved, hiring of an engineer