Introduction to the Accelerator layout www.europeanspallationsource.se February 2016 Nick Gazis Mechanical Integration Lead Engineer.

Slides:



Advertisements
Similar presentations
Final Design of a CW Radio-Frequency Quadrupole (RFQ) for the Project X Injector Experiment (PXIE)* Abstract: The Project X Injector Experiment (PXIE)
Advertisements

ESS End-to-End Optics and Layout Integration Håkan Danared European Spallation Source Catania, 6 July 2011.
Accelerator Integration Design Integration Group [DIG] Apr. 2015
Requirements Structure and Status for NCFE
CENF – Civil Engineering Extension B887 CERN: An accelerator complex unique in the world -Prevessin site complex- -EHN1 Extension Area- EHN1 Extension.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
ESS Cryogenic Distribution System for the Elliptical Linac MBL/HBL - CDS requirements Preliminary Design Review Meeting, 20 May 2015, ESS, Lund, Sweden.
LHC Insertions Upgrade Working Group (LIUWG) Space available in tunnel Y. Muttoni.
Anders Sunesson RF Group ESS Accelerator Division
MEF - Machines & Experimental Facilities Linac4 project EN/MEF roles & responsibilities EN/MEF group meeting October J.Coupard1.
HWDB: Operations at the Spallation Neutron Source Workshop on Accelerator Operations August 6-10, 2012 Glen D. Johns Accelerator Operations Manager.
Configuration Management Romuald Duperrier Head of Systems Engineering Division April 22, 2015.
Survey, Alignment and Metrology Fabien Rey Pawel Garsztka ESS Survey, Alignment and Metrology Group Interface Workshops for ESS Warm-Linac: ISrc - LEBT.
ESS Linac Modifications for ESSnuSB Dave McGinnis Chief Engineer / Accelerator Division August 27, 2014.
Status report on ICS interfaces (Accelerator, Target, NSS, CF) and related activities Miha Reščič Deputy Project Manager, ICS
Details on the Accelerator Installation Plan E. Sargsyan & L. Lari 20 April 2016.
ESS wire scanner Benjamin Cheymol
Personnel Safety Systems Stuart Birch Senior Engineer, Personnel Safety Systems November 6 th, 2014.
Installation plans for RFQ and Superconducting linac Dave McGinnis Chief Engineer Eugene Tanke Systems Engineer March 20,
Accelerator Tunnel Layout (G01) Nick Gazis Senior Mechanical Engineer Review of ESS Accelerator Conventional Facility Design.
ESS Cooling System - Interface with DTL 1 John Jurns Cooling System Engineer.
ESS Cooling System - Interface with RFQ 1 John Jurns Cooling System Engineer.
PRELIMINARY VERSION Mechanical integration in the ESS Accelerator tunnel HENRY PRZYBILSKI.
Status of the 3D model and updates from the IKC models May 2015
M. Munoz April 2, 2014 Beam Commissioning at ESS.
Accelerator Installation Plan: Graphical representation E. Sargsyan & L. Lari DRAFT - March March 2016.
ESS Linac Upgrade Dave McGinnis Chief Engineer / Accelerator Division May 27, 2014.
Chapter Editor: John Weisend TDR Chapter 6 Cryogenic System, Vacuum System & Test Stands.
ESS Front End diagnostic
ESS Cryomodule Status Meeting – Introduction | | Christine Darve Introduction to Cryomodules for the ESS 2013 January, 9 th Christine Darve.
Status of the design integration strategy and installation design January on.
Status of Primavera (P6) Accelerator Plan & an Introduction to the Accelerator Installation Plan Luisella Lari Head planner for Accelerator & Senior Scientist.
Slides for TAC meeting Oct/2015 Marcelo juni Ferreira Vacuum section leader October,
Operation SE view point Romuald Duperrier ESS SE manager.
RF cell Anders Sunesson RF group leader
Cryomodule test stand at ESS site
Overview and System Design for ESS LLRF Systems
Staging in the TDR.
Emanuele (ESS), Alessandro (CERN), Mikel (Tekniker), Hayley (ISIS)
Status of Cryogenics Facilities Design
Andreas Jansson, Lali Tchelidze
Mikael Jakobsson ESS Installation Manager
Overview of Day One – 29 Feb 2016
ESS Project Status Roland Garoby – Technical Director August 2018.
Jaroslaw Fydrych SHC Lead Engineer
RF Distribution for Warm Linac
Managing Parameters Karin Rathsman
Beam Commissioning at ESS
PSS1 overview Stuart Birch
RF systems introduction
Ciprian Plostinar Workshop on Testing and Commissioning
Operations Section Leader
Mechanical Engineering & Technology (MET)
Licensing requirements for Cryomodules
Introduction CDR Normal Conducting Linac LLRF
PSS0 Design & Concept of Operations
PSS Verification and validation
Bunker Wall Design Wall ESS
European Spallation Source ERIC
High Level Readiness Reviews
Beam Commissioning Planning
Status of the ESS High Power RF Systems
Plan for early Operation
RF introduction Anders Sunesson RF group leader
Charge and Agenda of the 18th TAC meeting
Radiation fields During 1st stage beam commissioning
Accelerator Installation Schedule
Overview of the TARGET Monolith Rough Vacuum
General Overview of WP 12 ESS Vacuum System
Project Support Meeting January 9, 2019
Presentation transcript:

Introduction to the Accelerator layout February 2016 Nick Gazis Mechanical Integration Lead Engineer

Morning questions 210-Feb-2016ESS Cryogenic Safety Workshop - N.Gazis Galvanized steel grounding grid The metallic structure of the tunnel has to be grounded by law in Sweden Tunnel expansion joints

ESS buildings under construction (Feb. 2016) 310-Feb-2016ESS Cryogenic Safety Workshop - N.Gazis Target Accelerator Logistics Instruments Electrical Cryo compressor Klystron Gallery Front-End Building HEBT Loading Bay

Reporting 410-Feb-2016ESS Cryogenic Safety Workshop - N.Gazis Target A2T  DgLg  HEBT (56 m) 571 MeV Cryo Spoke Medium β (77 m) (179 m) High β 2000 MeV 216 MeV 75 keV Warm Source DTL MEBT RFQ LEBT (2.4 m) (4.6 m) 3.6 MeV (3.8 m) (39 m) 90 MeV

Accelerator Tunnel personnel entrances/exits 510-Feb-2016ESS Cryogenic Safety Workshop - N.Gazis Emergency exits HEBT entrance (chicane) FEB entrance (chicane) A2T egress Overview

Accelerator Tunnel equipment access 610-Feb-2016ESS Cryogenic Safety Workshop - N.Gazis HEBT Loading BayFEB drop hatch Overview

ESS accelerator layout 710-Feb-2016ESS Cryogenic Safety Workshop - N.Gazis

Warm linac 810-Feb-2016ESS Cryogenic Safety Workshop - N.Gazis

Warm linac 910-Feb-2016ESS Cryogenic Safety Workshop - N.Gazis  Access to the installations (north) tunnel wall is possible under the DTL  ISRC is situated inside the HV cage  Access to the installations (north) tunnel wall could be possible under the LEBT/RFQ/MEBT (t.b.d.)

Spoke 1010-Feb-2016ESS Cryogenic Safety Workshop - N.Gazis  Access to the installations (north) tunnel wall is possible under the LWU (through the LWU support table)  Temporary ladders can be installed on top of the LWU for access around it  SPK CM do not allow for access route to the installations (north) tunnel wall

Medium & High Beta Linac (MBL & HBL) 1110-Feb-2016ESS Cryogenic Safety Workshop - N.Gazis  Access to the installations (north) tunnel wall is possible under the LWU (through the LWU support table)  Temporary ladders can be installed on top of the LWU for access around it Elliptical CM support design in progress

High Energy Beam Transport, Dog-Leg & Accelerator to Target (HEBT, DgLg & A2T) 1210-Feb-2016ESS Cryogenic Safety Workshop - N.Gazis  Access to the installations (north) tunnel wall is facilitated throughout HEBT, DgLg and A2T

Integration strategy 13 “Strategy for the engineering integration of the ESS accelerator“ 49_final.pdf?version=2&modificationDate= &api=v2 “IKC 3D model guidelines” - ESS /valid  References for warm linac interface drawings included 10-Feb-2016ESS Cryogenic Safety Workshop - N.Gazis

Last slide 1410-Feb-2016ESS Cryogenic Safety Workshop - N.Gazis Red is reserved for Personnel Safety Systems (PSS) Yellow is reserved for radiation safety Transportation in the tunnel can be influenced by the floor expansion joints Accelerator Tunnel has no overhead crane 20 tn overhead crane is situated on top of both HEBT and FEB drop-hatches (for lowering components in the tunnel) Entrance is not possible through the emergency exits (only exits!) Entrance to the tunnel through the FEB is possible for equipment of W=2.3 m, H=2.2 m, L=3 m Enquiries concerning 3D model integration, please contact

ESS 1510-Feb-2016ESS Cryogenic Safety Workshop - N.Gazis