PRODUCTION COSTING W.D. Prasad Lecturer Dept. of Electrical Engineering University of Moratuwa.

Slides:



Advertisements
Similar presentations
Treatments of Risks and Uncertainty in Projects The availability of partial or imperfect information about a problem leads to two new category of decision-making.
Advertisements

Section 7.3 Multiplication in Different Bases
Mechanical Engineering Department ME 322 Operation and Management of Power Plants Prof. Osama A El Masry Prof. Osama El Masry Load Curves.
Power Supply Adequacy Assessment Model/Methodology Review Steering Subcommittee Meeting January 29, 2010.
Chapter 9: The Normal Distribution
EXAMPLE 1 Graph a function of the form y = ax 2 Graph y = 2x 2. Compare the graph with the graph of y = x 2. SOLUTION STEP 1 Make a table of values for.
Miao Lu 1. Content Overview I. Load Models II. Economic Dispatch III. Disturbance and Recovery IV. Demand-Side Management V. Energy Storage Units VI.
System Planning & Operations Spring 2010
Example 15.3 Supplying Power at Midwest Electric Logistics Model.
Row Reduction Method Lesson 6.4.
Costing of energy generation of multi area interconnected systems with conventional as well as renewable sources Kaisar R. Khan McNeese State University.
CHAPTER 5 THE COORDINATE PLANE THE BEGINNING!!. 5.1THE COORDINATE PLANE Points are located in reference to two perpendicular number lines called axes.
Multiplying and Dividing Decimals by 10, 100, and 1,000
Graphs of Functions. Text Example SolutionThe graph of f (x) = x is, by definition, the graph of y = x We begin by setting up a partial table.
© 2002 Eaton Corporation. All rights reserved. Designing for System Reliability Dave Loucks, P.E. Eaton Corporation.
Inventory Management MD707 Operations Management Professor Joy Field.
1 Planning Reserve Margin Dan Egolf Senior Manager, Power Supply & Planning.
ENERGY CENTER State Utility Forecasting Group (SUFG) Alternative Resources and Energy Capacity Presented by: Douglas J. Gotham Purdue University Presented.
ERCOT Planning WMS 10/20/2010 Target Reserve Margin and Effective Load Carrying Capability of Installed Wind Capacity for the ERCOT System – Methodology.
ERCOT Planning October 2010 Target Reserve Margin and Effective Load Carrying Capability of Installed Wind Capacity for the ERCOT System - Methodology.
11/23/2015Slide 1 Using a combination of tables and plots from SPSS plus spreadsheets from Excel, we will show the linkage between correlation and linear.
Summary of Astrapé Reserve Margin Impact Analysis for the PUCT Pete Warnken WMS February 4, 2015.
Electricity pricing Tariffs.
Terms & Definitions.
ECE498HZ: Power Distribution System Analysis
Resource Analysis. Objectives of Resource Assessment Discussion The subject of the second part of the analysis is to dig more deeply into some of the.
RFPEG2013 PRE-BID MEETING RFPEG2013 – Pre-Bid meeting January 9, 2014 Presentation by Derek Davis – Public Utilities Commission.
CRICOS No J a university for the world real R Aging Equipment Replacement in Power Systems, Using Reliability and Cost Considerations By Dr. Ghavam.
Announcements Please read Chapter 7 HW 6 is due today
Estimating the resource adequacy value of demand response in the German electricity market Hamid Aghaie Research Scientist in Energy Economics, AIT Austrian.
Modeling DER in Transmission Planning CAISO Experience
“Other” Cost Estimates
RENEWABLES AND RELIABILITY
INTRODUCTION TO STATISTICS
Lesson 8: Basic Monte Carlo integration
Introductory Statistics and Data Analysis
Variable Energy Resource Capacity Contributions Consistent With Reserve Margin and Reliability Noha Abdel-Karim, Eugene Preston,
Relative Cumulative Frequency Graphs
Section 7.3: Probability Distributions for Continuous Random Variables
Expectations of Random Variables, Functions of Random Variables
Chapter 4 Systems of Linear Equations; Matrices
Digital Logic & Design Dr. Waseem Ikram Lecture 02.
Objectives The student will be able to:
ME 312 PPE POWER SYSTEM ANALYSIS
MTH 161: Introduction To Statistics
The Standard Deviation as a Ruler and the Normal Model
Economic Operation of Power Systems
ECEN 460 Power System Operation and Control
Combined operation of different power plants PREPARED BY : Priyanka Grover Btech (EE) SBSSTC,FZR.
EE 369 POWER SYSTEM ANALYSIS Lecture 15 Economic Dispatch Tom Overbye and Ross Baldick 1.
Introduction to Summary Statistics
Introduction to Summary Statistics
Introduction to Summary Statistics
Introduction to Summary Statistics
ECE 333 Green Electric Energy
Digital Logic & Design Lecture 02.
Introduction to Summary Statistics
Financial benefits of solar and wind power in South Africa in 2015
Strategic Bidding in Competitive Electricity Markets
Dr. Clincy Professor of CS
Microwave Engineering
Introduction to Summary Statistics
GENESYS Current Functionality
Day 52 – Box-and-Whisker.
ECE 576 Power System Dynamics and Stability
INTERCONNECTED SYSTEM GENERATING CAPACITY RELIABILITY EVALUATION
RELIABILITY Reliability is -
Planning Reserve Margin
Introduction to Summary Statistics
Micah S. Ziegler, Joshua M. Mueller, Gonçalo D
Presentation transcript:

PRODUCTION COSTING W.D. Prasad Lecturer Dept. of Electrical Engineering University of Moratuwa

Introduction Electricity generation system planning requires minimization of the total cost of supplying the demand during a specified period of time. Short term, Medium term or Long term. Medium term and Long term planning initial investment cost + production costs Short term planning production cost only

Load and Generator Models Production costing includes probabilistic treatment of the system load and the generation unit availability in almost all planning models. Chronological load curve Load duration curve Chronological load curve is modified with a plot of load versus the duration that the system load exceeds that load level. This curve can be converted to a probability curve, F(x) by dividing the horizontal axis (x- axis) by the total duration of the chronological load profile, T and rearranging the axes (Load Duration Curve, LDC).

Load and Generator Models Cont… Generators are normally represented by a two-state model where either a generating unit is available at its full capacity or not available. p i - Availability q i -FOR 0 C i ; C i = Capacity Probability associated with the state where the unit is not available is called Forced Outage Rate (FOR).

Production Cost Calculation Generators are first ranked according to their average incremental costs so that the units with the lower costs are placed at the top of the list (Merit Order). These units are now gradually loaded onto the LDC in merit order. After loading each generator the Effective Load Duration Curve (ELDC), F i can be obtained. The area under each of these ELDCs multiplied by the normalizing value, T, directly indicates the energy not served in the system. Unserved energy (UE i ) after loading the generator i is given by, Where T is the total duration

Production Cost Calculation Cont… Once the unserved energies are known the difference in unserved energies before and after loading a generator can be used to obtain the energy served by that generator. Energy produced by generator i, E i is given by, Corresponding production cost, Cost i is given by where IC i is the incremental cost of generator i Total production cost, TC is given by Where ng is the number of generator units

Multiple Availability States of Generators In most practical circumstances some of the generation units are likely to be deliberately operated at output levels below their full capacities during operation. Consider a generating unit model with two availability states. New ELDC will be In the case of a generator with multi-level availability states where n is the no. of availability levels

System Unserved Energy and Loss of Load Probability After loading all the generating units onto the load curve there will be a final ELDC left behind. Loss of Load Probability (LOLP) is the probability that the system generation is not able to supply the system load either fully or partially. This can be directly obtained from the final ELDC.

The total energy left to be served after loading all the generating units is called the Expected System Unserved Energy. Average cost of losses due to the power supply failures is called the Value of Lost Load (VLL) which is given in Rs/ kWh not supplied. System planners need to add new generating units into the system until the following condition is satisfied.

Example 1)[a] Determine LOLP, EUE and total production cost if the system load given in Table 1 is supplied with generators in Table 2. Time (hrs) Load (MW) Table 1: Load Variation GeneratorIncremental Cost (Rs/MWh) Capacity (MW)Forced Outage Rate Generator Generator Generator Table 2: Generator Data

Answer Cost (Rs/MWh) FOR Capacity Load (x)Duration (hrs)F 0 (x)F 1 (x)F 2 (x)F 3 (x) Unserved Energy (MWh) Energy Served (MWh) Production Cost (Rs) LOLP7.6 % EUE (MWh)189.3 Total Production Cost (Rs)

b] Comment on possible changes to the answers in (a) if generator 2 and 3 are replaced with generator 4 given in Table 3 having an incremental cost of 1100 Rs/MWh Table 3: Generator 4 Data Capacity (MW) Probability

Answer When generators 2 and 3 are combined the resultant generator will have an availability distribution with four levels of operation as given below. This distribution is exactly the same as the generator 4 distribution given. Thus even though the generators 2 and 3 are replaced with the generator 4, the final probability distribution will not change. This means that the LOLP and the expected system unserved energy also will not be modified. However, the production cot will change due to the modified incremental cost. Total energy served by generator 2 & 3= MWh Total production cost of generator 2 & 3= Rs Energy served by generator 4= MWh Production cost of generator 4= Rs Generation Level (MW) Probability