ILC : Type IV Cryomodule Design Meeting Main cryogenic issues, L. Tavian, AT-ACR C ryostat issues, V.Parma, AT-CRI CERN, 16-17 January 2006.

Slides:



Advertisements
Similar presentations
19th – 20th of September 2007Cryogenic Expert Meeting at GSI, Jan Patrick Meier1/11 Cryogenic Experts Meeting at GSI, 2007 The SIS 100 Cryogenic Jumper.
Advertisements

MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
Felix Wamers, Technical Coordination Meeting, 12 th -13 th of May CERN-GSI Technical Coordination Meeting Felix Wamers, Yu Xiang,
CRYO PIPING & INTER-MODULE CONNECTIONS Yun He, Daniel Sabol, Joe Conway External Review of MLC Daniel Sabol, MLC External Review 10/3/2012.
1 Presented at ColUSM by D. Ramos on behalf of the Cold Collimator Feasibility Study Working Group Longitudinal.
Laurent Tavian Thanks to contribution and helpful discussions with M. Jimenez, V. Parma, F. Bertinelli, J.Ph. Tock, R. van weelderen, S. Claudet, A. Perin,
Cryomodule Concept for the ODU RF Dipole Crab Cavity Tom Nicol* - Fermilab December 10, 2013 * With lots of help from HyeKyoung, Tom J, Shrikant, Ofelia,
Alignment and assembling of the cryomodule Yun He, James Sears, Matthias Liepe MLC external review October 03, 2012.
Large-capacity Helium refrigeration : from state-of-the-art towards FCC reference solutions Francois Millet – March 2015.
23 Jan 2007 LASA Cryogenics Global Group 1 ILC Cryomodule piping L. Tavian for the cryogenics global group.
R&D Status and Plan on The Cryostat N. Ohuchi, K. Tsuchiya, A. Terashima, H. Hisamatsu, M. Masuzawa, T. Okamura, H. Hayano 1.STF-Cryostat Design 2.Construction.
Heat load study of cryomodule in STF
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Stress and cool-down analysis of the cryomodule Yun He MLC external review October 03, 2012.
Accelerators for ADS March 2014 CERN Approach for a reliable cryogenic system T. Junquera (ACS) *Work supported by the EU, FP7 MAX contract number.
SCU Segmented Cryostat Concept M. Leitner, S. Prestemon, D. Arbelaez, S. Myers September 2 nd, 2014.
Type IV Cryomodule Proposal (T4CM) Don Mitchell, 16 JAN 2006.
Arnaud Vande Craen (TE-MSC) 27/02/20131 EUCARD : ESAC Review – CEA Saclay.
Stress and Cool-down Analysis Yun HE MLC Internal Review 9/5/2012Yun HE, MLC Internal Review1.
CRYOGENICS FOR MLC Cryogenic Piping in the Module Eric Smith External Review of MLC October 03, October 2012Cryogenics for MLC1.
Americas Region: T4CM Status and Plans H. Carter TD SRF Dev. Dept. July 14, 2006.
Mechanical issues SPL cavities/cryomodules: Objectives V.Parma Mini-workshop on Mechanical issues SPL cavities/cryo-modules, CERN 30th September 2009.
Aug 23, 2006 Half Current Option: Impact on Linac Cost Chris Adolphsen With input from Mike Neubauer, Chris Nantista and Tom Peterson.
5 K Shield Study of STF Cryomodule Norihito Ohuchi, Norio Higashi KEK Xu QingJin IHEP 2008/3/3-61Sendai-GDE-Meeting.
Date 2007/Oct./25 FNAL-GDE-Meeting Global Design Effort 1 Cryomodule Report N. Ohuchi KEK 1.Cryomodule & Cryogenics KOM 2.GDE-meeting discussion I.Interface.
Process Definition of the Operation Modes for Super-FRS Magnet Testing CSCY - CrYogenic department in Common System, GSI, Darmstadt Y. Xiang, F. Wamers.
30 May 2007 DESY Cryomodule Discussion 1 Type 4 Cryomodule Technical Discussion Tom Peterson Compiled from various previous meeting notes and many sources.
Carlo Pagani University of Milano INFN Milano-LASA & GDE ILC and XFEL Cryomodules Preliminary thoughts for convergence ILC EDR Kick-off Meeting DESY,
CRYOGENICS FOR MLC Cryogenic Principle of the Module Eric Smith External Review of MLC October 03, October 2012Cryogenics for MLC1.
Alignment and assembling of the cryomodule Yun He, James Sears, Matthias Liepe.
Heat loads and cryogenics L.Tavian, D. Delikaris CERN, Cryogenics Group, Technology Department Accelerators & Technology Sector Friday, October 15, 20101HE-LHC'10.
Cryostat & LHC Tunnel Slava Yakovlev on behalf of the FNAL team: Nikolay Solyak, Tom Peterson, Ivan Gonin, and Timergali Khabibouline The 6 th LHC-CC webex.
SLHC WG3 (Cryomodule) summary & plan with recommendation to the CB V.Parma, CERN TE-MSC P. DUTHIL, IN2P3-CNRS 3rd SPL collaboration meeting, CERN
The integration of 420 m detectors into the LHC
Mike Struik / LHC-CRI INSTRUMENTATION FEEDTHROUGH SYSTEM FOR LHC MACHINE ARC QUADRUPOLE MAGNETS. 123rd LHC Vacuum Design Meeting 19 April 1999.
HL-LHC 11 T Dipole for DS Collimation 8 th to10 th December, 2014 D. Duarte Ramos, C. Mucher, L. Gentini, T. Sahner, H. Prin, R. Wawrowski, F. Savary,
Rossana Bonomi R. Bonomi TE-MSC-CMI SPL Seminar 2012.
S1 global: thermal analysis TILC09, April 19th, 2009 Serena Barbanotti Paolo Pierini.
Cryogenic Cooling Schemes for the SPL U. Wagner TE-CRG.
Cryogenic scheme, pipes and valves dimensions U.Wagner CERN TE-CRG.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
SPL cryomodule specification meeting, CERN 19th October 2010 SPL cryomodule specification: Goals of the meeting SPL cryomodule specification: Goals of.
5 K Shield Study of STF Cryomodule (up-dated) Norihito Ohuchi KEK 2008/4/21-251FNAL-SCRF-Meeting.
CW Cryomodules for Project X Yuriy Orlov, Tom Nicol, and Tom Peterson Cryomodules for Project X, 14 June 2013Page 1.
Ralf Eichhorn CLASSE, Cornell University. I will not talk about: Cavities (Nick and Sam did this) HOM absorbers (did that yesterday) Power couplers (see.
Comments from the SNS Cryostat Design Review February 2010 Tom Peterson, Fermilab 15 February 2010.
Low Beta Cryomodule Development at Fermilab Tom Nicol March 2, 2011.
Overview of the ESS Linac Cryogenic Distribution System
Spoke section of the ESS linac: - the Spoke cryomodules - the cryogenic distribution system P. DUTHIL (CNRS-IN2P3 IPN Orsay / Division Accélérateurs) on.
FCC Infrastructure & Operation Update on the cryogenics study Laurent Tavian CERN, TE-CRG 28 October 2015.
ESS Cryomodule Status Meeting – Introduction | | Christine Darve Introduction to Cryomodules for the ESS 2013 January, 9 th Christine Darve.
TDR Cryogenics Parameters Tom Peterson 28 September 2011.
Crab Cavity Technical Coordination meeting:
The Evolving ILC Project
SPL RF coupler: integration aspects
Stress and cool-down analysis of the cryomodule
Roadmap for triplet cryostats
IT-4189 Supply and installation of a cryogenic distribution system
T5.2: Harmonization - Material and Component Reference
HFM Test Station Main Cryostat
Status of design and production of LEP connection cryostat
A. Vande Craen, C. Eymin, M. Moretti, D. Ramos CERN
5K or not? & TTF module thermal modeling update
TTF module thermal modeling
The 11T cryo-assembly: summary of design and integration aspects
UK RFD Pre-Series cryomodule
ILC Cryogenics -- Technical Design Report Planning
FRIB summary of performance degradation - VTA to cryomodule
Cryomodules Challenges for PERLE
Status of QQXF cryostat
Presentation transcript:

ILC : Type IV Cryomodule Design Meeting Main cryogenic issues, L. Tavian, AT-ACR C ryostat issues, V.Parma, AT-CRI CERN, January 2006

2 Content Design pressure of cavity cold mass structure Minimum diameter requirement of distribution lines Cool-down and warm-up principle

3 Design pressure of cavity cold-mass structure

4 The spacing of safety device needed to protect the cavities depends strongly on the design pressure of the cold-mass structure: »“High” design pressure (~ bar) Discharge of helium during technical incident (break of beam vacuum with air) can be done via the pumping line (DN300) with safety relief valves located close to access shaft. »“Low” design pressure (< bar) Safety relief valves must be periodically installed in the tunnel on the pumping line, i.e. ODH issues in the tunnel or large additional header to collect the valve discharge.

5 Design pressure of cavity cold-mass structure Design pressure level AdvantageDrawback “High” - No helium discharge in the tunnel - Cost of safety devices - Cavity design “Low”- Cavity design - ODH issue (personnel safety) - Additional header (space + cost) - Larger safety device number (cost and reliability)

6 Minimum diameter of distribution lines Line Minimum diameter [mm] Line A60 Line B300 Line C70 Line D70 Line E100 Line F100

7 Cool-down and warm-up principle Tesla TDR principle

8 Cool-down and warm-up principle ILC principle proposal

9 Cool-down and warm-up principle PrincipleAdvantageDrawback Tesla TDR No change W/r to the TTF type III cryomodule. - Need of additional valve - Additional temperature measurement - Need of hydraulic restriction to share the CD WU flow (risk of plugging) - Risk of unbalanced and uncontrollable CD/WU operation of cryo-string elements (// cooling). ILC proposal - CD/WU operation fully controllable (series cooling). - Saving of 1 valve per cryo-string (128 valves in total) - Saving of ~15000 temp. sensors and corresponding acquisition (~10 MEuro). Change w/r to the TTF III cryomodule design.

10 Main cryostat design issues Real-estate gradient: inter-cavity and cryomodule interconnection space optimization [1][1] Cryomodule length? [2][2] Thermal performance. review of static heat loads: table 1 of bcd:main_linac:ilc_bcd_cryogenic_chapter_v3.doc [3] bcd:main_linac:ilc_bcd_cryogenic_chapter_v3.doc[3] Design of thermal shielding feed-throughs and thermalisations (couplers, tuners, etc.): strong impact on cryostat thermal performance. [4][4] Cryomodule interconnection design: Length optimization, thermal design, interconnection bellows stability. [5] [5] Cryo-string extremity modules (Technical Service module in LHC jargon) housing cryo equipment: 2 out of 15 cryomodules in a cryo-string. [6][6] Cryogenics flow (and vacuum pumps) induced vibrations. Performance limiting? bcd:main_linac:ilc_bcd_cryogenic_chapter_v3.doc [7] bcd:main_linac:ilc_bcd_cryogenic_chapter_v3.doc[7] Materials and assembly technologies: »Ti helium vessel and weldability to Ni. [8][8] »Ti-to-st.steel transitions leak-tightness at cryo T (13 units per cryomodule!). [9][9] External support system (ground support vs. hanging) and re-alignment strategy  impact on tunnel integration

11 Inter-cavity space optimisation ~283mm Space optimisation is a must! (1 cm gain  ~100m gain per linac)

12 Cryo-module length Impact of cryo-module length: »Increasing length: »< No.of interconnections:  < No.componets (bellows) and installation cost saving »So > real estate gradient:  tunnel length cost saving »< No. critical components (bellows)  higher reliability  All desirable effects Practical limits: »Weight increase. (TTF~8 tons?). Longer Cryo-modules will remain “light” objects (below 15 tons). »Road transport: from ~11 m to ~ 15 m cryomodule still transportable (according to European regulations). LHC cryo- dipoles are ~15 m long. »Handling: no major limitation, but…wider tunnel shafts:  cost increase  Increase length to about 15 m or longer?

13 Interconnections…often forgotten Optimise compactness  > real estate gradient Specific design of compensation systems: »Mechanical stability of pressurised lines (Al extruded thermal shields for LHC) »Low stiffness/compact optimised bellows (plastic domain for LHC bellows) Do not forget thermal performance: »Appropriate (active) thermal shielding with MLI »Beware of thermal contraction gaps in thermal shields (radiation multi-reflection paths). »Cryo-module extremities need specific features LHC interconnection Experience gained in the past! 

14 Thermalisations Welded Al thermal shields (50-65 K) Al welded shrink-fit thermalisation of pumping tubes (SSS) (50-65 K) Avoid bolted braid assemblies and st.steel brazing whenever possible All-welded or shrink-fitted solutions preferable  Proper interface must be foreseen on components for effective thermalsations Thermalisation weld of support post / bottom tray (50-65 K) A few LHC solutions

15 Estimated heat loads Table 1. Estimated values of distributed heat loads in steady operation [W/m] (without contingency) Temperature level K5 - 8 K2 K Static heat inleaks Dynamic loads at initial energy Couplers, absorbers… RF load Total at initial energy Dynamic loads at final energy Couplers, absorbers… RF load Total at final energy

16 Vibrations Table 4. Maximum vibration level (integrated RMS of vertical displacement) FrequenciesMaximum vibration level [nm] f >= 0.5 Hz80 f >= 1 Hz70 f >= 5 Hz20 f >= 10 Hz5