1M. Ellis - Tracker PC - 7th March 2007 VLPC Cassette Characterisation  Third application (as described in past tracker meeting and CM17) is now working.

Slides:



Advertisements
Similar presentations
MICE Collaboration MTG IIT – Feb 2002 The Fiber Tracker Option for MICE Spectrometers The D0 Central Fiber Tracker – Experience and Implications for MICE.
Advertisements

Light Transport and Detection with VLPCs D. Dutta TUNL/ Duke University MEP group.
Tracker Software 1M.Ellis - CM23 - Harbin - 15th January 2009  Four key areas that currently need some work: u Digitisation u Decoding files u Unpacking.
1 Scintillating Fibre Cosmic Ray Test Results Malcolm Ellis Imperial College London Monday 29 th March 2004.
29 June 2004Paul Dauncey1 ECAL Readout Tests Paul Dauncey For the CALICE-UK electronics group A. Baird, D. Bowerman, P. Dauncey, C. Fry, R. Halsall, M.
1 Status of Cosmic Analysis Malcolm Ellis Imperial College London Wednesday 10 th March 2004.
Status of the MICE SciFi Simulation Edward McKigney Imperial College London.
MICE Tracker Readout Overview channel AFE II-t boards - 8 Visible Light Photon Counter (VLPC) cassettes - 4 cryostats.
1 VLPC system and Cosmic Ray test results M. Ellis Daresbury Tracker Meeting 30 th August 2005.
Prototype Performance in D0 test stand M.Yoshida (Osaka Univ.)
1 Online data quality and monitoring M. Ellis Daresbury DAQ Meeting 31 st August 2005.
MICE Video MTG 9/25/2002 MICE Fiber Tracker Design Update Requirements and Proposed Detector Implementations A. Bross Fermilab.
1 Analysis code for KEK Test-Beam M. Ellis Daresbury Tracker Meeting 30 th August 2005.
1 KEK Beam Test Analysis Hideyuki Sakamoto 15 th MICE Collaboration Meeting 10 st June,2006.
Cosmic Ray Analysis 1M.Ellis - CM23 - Harbin - 15th January 2009  Not enough time to go into detail, so just a quick summary of the status since CM22:
Prototype Performance in D0 test stand & fiber intrinsic performance with KEK test beam M.Yoshida (Osaka Univ.) Osaka.
Tracker 2 Cryo &Electronics Update Linda Coney, UC Riverside Terry Hart, U Mississippi Ben Freemire, IIT Malcolm Ellis, Brunel University ADB MICE Collaboration.
1 G4MICE Analysis of KEK Test Beam Aron Fish Malcolm Ellis CM15 10th June 2006.
1 G4MICE Malcolm Ellis SciFi Tracker Meeting, KEK Thursday 31st March 2005.
1Malcolm Ellis - Tracker Meeting - 6th November 2006 Tracker Software  Offline u Modeling u GRID u Tests u Decoding u Kalman fit u Reconstruction & “data.
J. Estrada - Fermilab1 AFEII in the test cryostat at DAB J. Estrada, C. Garcia, B. Hoeneisen, P. Rubinov First VLPC spectrum with the TriP chip Z measurement.
CFT Calibration Calibration Workshop Calibration Requirements Calibration Scheme Online Calibration databases.
Fiber, Ribbon Production and Cryo Update Alan Bross Tracker Phone October 26, 2006.
1M. Ellis - MICE Video Conference - 15th March 2007 Software Report  New G4MICE Users  TOF Simulation and Digitisation  SciFi Reconstruction  Tracker.
1 MICE Tracker Update M. Ellis UKNFIC Meeting 25 th August 2005.
1 System Description (2-4) Gains from single photo-electrons in vacuum at room temperature (5-8) Linearity Test at V in vacuum at room temperature.
1 SciFi Results and Comparison Malcolm Ellis, for the MICE Scintillating Fibre Group Abingdon, 31 st October 2003.
1 MICE Tracking Detectors Malcolm Ellis NFMCC Meeting 12 th March 2006.
STAR Analysis Meeting, BNL, Dec 2004 Alexandre A. P. Suaide University of Sao Paulo Slide 1 BEMC software and calibration L3 display 200 GeV February.
1 CPC2-CPR2 Assemblies Testing Status Tim Woolliscroft.
1M. Ellis - MICE Tracker PC - 19th October 2007 Station QA Analysis (G4MICE)  For details of software see my previous talk here: u
Linear collider muon detector: Marcello Piccolo Amsterdam, April 2003.
G4MICE Status and Plans 1M.Ellis - CM24 - RAL - 31st May 2009  Firstly, a correction to the agenda:  I failed to spot a mistake in the agenda that I.
Cryo and AFE IIt Update Fiber Tracker Meeting April 6, 2006 Imperial College A. Bross.
1 Development of Multi-Pixel Photon Counters (1) S.Gomi, T.Nakaya, M.Yokoyama, M.Taguchi, (Kyoto University) T.Nakadaira, K.Yoshimura, (KEK) Oct
Don Lincoln, Fermi National Accelerator Laboratory, Instr’99, November 1999 Characterization and Performance of Visible Light Photon Counters (VLPCs)
July, 2002CMS Tracker Electronics1 APV25 wafer testing Outline Mark Raymond, Imperial College Wafer test procedure speed improvements.
1M. Ellis - MICE Tracker Meeting - 12th February 2007 Readout Electronics & DAQ  Introduction  DAQ Spreadsheet u VLSB_DAQ Sheet u Initialisation u Bias.
All DØ Meeting, 12/01/00 Central Fiber Tracker Light Guide Performance Thomas Nunnemann Fermilab 90 days before RunII … (a.k.a. 12/01/00)
1M. Ellis - NFMCC - 31st January 2007 MICE Tracker.
1M. Ellis - 17th May 2007 SciFi Decoding (Everything you never wanted to know but couldn’t avoid going over and over)  VLSB Data (unpacking to AFE, MCM,
1 KEK test-beam software progress Malcolm Ellis MICE Video Conference 4 th May 2005.
1Malcolm Ellis - Tracker Meeting - 28th November 2006 Electronics - Station Acceptance  Hardware: u 1 MICE cryostat with 1 VLPC cassette. u VME crate,
1 A first look at the KEK tracker data with G4MICE Malcolm Ellis 2 nd December 2005.
VLPC System Update A.Bross MICE CM Feb 9, Cryo  Production cryostats 1 and 2 ran smoothly at operating temperature  However, Cassette 109 in cryo.
G.Barber: Sci-Fi Mechanical Design - Tracker Meeting Cern 29 March Latest thoughts on Mechanical Design Contents:- Revised Fibre Pitch Fibre Optic.
G.Barber Mice Tracker Mechanical Progress Tracker Mechanical Progress Contents:- Station Space Frame Station Layout Light Guide Map Connectors Patch.
February 24, DØ’s VLPC Detectors: The Fiber Tracker and Preshowers Greg Davis University of Rochester.
Database David Forrest. What database? DBMS: PostgreSQL. Run on dedicated Database server at RAL Need to store information on conditions of detector as.
F Don Lincoln, Fermilab f Fermilab/Boeing Test Results for HiSTE-VI Don Lincoln Fermi National Accelerator Laboratory.
Analysis for QA (temporary) Hideyuki Sakamoto 1 st October 2007 MICE Tracker Phone Meeting.
1 Light Yield results from the KEK tracker test using G4MICE M. Ellis Tracker Phone Meeting 25 th January 2006.
Summary of final results from MICE note: “ MICE Scintillating Fibre Tracker Prototype - First progress report - ” M.Yoshida (Osaka Univ.) for the SciFi.
1 Performance of a Magnetised Scintillating Detector for a Neutrino Factory Scoping Study Meeting U.C. Irvine Monday 21 st August 2006 M. Ellis & A. Bross.
1 Tracker Software Status M. Ellis MICE Collaboration Meeting 27 th June 2005.
1 EMCAL Reconstruction in Pass pp 900 GeV 29/03/2010 Gustavo Conesa Balbastre.
G. Eigen, Paris, Introduction The SiPM response is non-linear and depends on operating voltage (V-V bd ) and temperature  SiPMs need monitoring.
Tracker Readout Progress Terry Hart, MICE Tracker Meeting, July 29, 2008 Cosmic Ray Readout with 1 st Tracker at RAL 2 nd Tracker Preparation at FNAL Firmware.
T585 analysis status 2005/12/02 HIDEYUKI SAKAMOTO This analysis was done by RUN# (+1.0 GeV/c normal beam run) For the problem of small light yield.
Station Acceptance Test. 22/02/2007 M. Takahashi 2 Lab Layout at IC.
1M. Ellis - MICE Tracker PC - 1st October 2007 Station QA Analysis (G4MICE)  Looking at the same data as Hideyuki, but using G4MICE.  Have not yet had.
G.Barber: Summary of Mice Fibre Tracker Meeting FermiLab 8-12 March Developments during Tracker workshop Contents:- Revised Fibre Pitch Fibre Optic.
Noise results from SR1 combined SCT barrel tests Summary of some initial results Alan Barr, UCL Pepe Bernabeu, Valencia.
20 April 2007MICE Tracker Phone Meeting1 Analysis of cosmic/self-triggerd data of station 5 Hideyuki Sakamoto MICE Tracker Phone Meeting 20 th April 2007.
Development of Multi-Pixel Photon Counters (1)
PreShower Characterisations
Fabio, Francesco, Francesco and Nicola INFN and University Bari
MICE VLPC Cryo Update Alan Bross MICE CM18 June 13, 2007.
Tower 8 – X6 anomaly MRB Meeting – 24 August 2005.
T2Kロシアグループに向けたMPPC(SiPM)の性能評価
Presentation transcript:

1M. Ellis - Tracker PC - 7th March 2007 VLPC Cassette Characterisation  Third application (as described in past tracker meeting and CM17) is now working and has been used on the data taken from cassettes 105 and 112.  First look at cassette 105 data and compare set points determined by this application with those used at KEK.  Then look at unknown cassette 112.  Application attempts to categorise each channel as either: u Dead(no obvious light with the LED on) u Alive(good multi photon fit) u Break down(wide pedestal, no clear multi photon peaks)  The application determines for each MCM which voltage produces the maximum number of alive channels with the highest number of photons seen (i.e. maximum QE).  The gain is also returned for this optimum value.

2M. Ellis - Tracker PC - 7th March 2007 Cassette 105  Was used in KEK.  Set points were taken from D0 values and then modified while at KEK to attempt to optimise the performance for the cosmic ray data taking (lower rate).  This optimisation was done “by hand”, but serves as a resonable basis for comparison.  Following plots show results of application.  Three plots per MCM: 1. Shows the number of dead (red +), alive (green *) and broken down (blue o) channels as a function of the bias. 2. Shows the gain as a function of bias 3. Shows the number of photons as a function of bias.

3M. Ellis - Tracker PC - 7th March 2007 Cass 105 – MCM 1

4M. Ellis - Tracker PC - 7th March 2007 Cass 105 – MCM 2

5M. Ellis - Tracker PC - 7th March 2007 Cass 105 – MCM 3

6M. Ellis - Tracker PC - 7th March 2007 Cass 105 – MCM 4

7M. Ellis - Tracker PC - 7th March 2007 Cass 105 – MCM 5

8M. Ellis - Tracker PC - 7th March 2007 Cass 105 – MCM 6

9M. Ellis - Tracker PC - 7th March 2007 Cass 105 – MCM 7

10M. Ellis - Tracker PC - 7th March 2007 Cass 105 – MCM 8

11M. Ellis - Tracker PC - 7th March 2007 Cass 105 – Results AFE MCM Bias Alive Gain Num PE MCMKEK VCalib VGain# PE Voltages determined by application seem to be in reasonable agreement with values used in KEK run. Gains at these voltages are also similar. Mean number of PE is uniform ~ 10% over the cassette. No dead channels in cassette 105

12M. Ellis - Tracker PC - 7th March 2007 Cassette 112  New VLPCs with unknown performance.  No prior experience (D0 or MICE) so no idea of correct bias, number of dead or noisy channels, gain, QE, etc...  Application returned the following:  A few channels are apparantly dead.  Two MCMS have all channels good.  Worst MCM has 5 dead channels.  Overall: 495 out of 512 good channels

13M. Ellis - Tracker PC - 7th March 2007 Cass 112 – MCM 1

14M. Ellis - Tracker PC - 7th March 2007 Cass 112 – MCM 2

15M. Ellis - Tracker PC - 7th March 2007 Cass 112 – MCM 3

16M. Ellis - Tracker PC - 7th March 2007 Cass 112 – MCM 4

17M. Ellis - Tracker PC - 7th March 2007 Cass 112 – MCM 5

18M. Ellis - Tracker PC - 7th March 2007 Cass 112 – MCM 6

19M. Ellis - Tracker PC - 7th March 2007 Cass 112 – MCM 7

20M. Ellis - Tracker PC - 7th March 2007 Cass 112 – MCM 8

21M. Ellis - Tracker PC - 7th March 2007 Conclusions  When I get a chance I want to tidy up the third application so that it is a little more user friendly, then it will go into CVS.  I think the tools are working reasoanbly, although I suspect Alan and I need to spend some time together looking over the results to tweak a few things.  We can get going with the VLPC characterisation (still need to sort out cryo set points for 9.5K though).  It looks like Cassette 112 should be fine for QA work, but perhaps shouldn’t be used for a production cryostat.