Makara/Geynisman, Aug. 31, 2007 1 Cryo Dept. Shutdown Status.

Slides:



Advertisements
Similar presentations
Measures of solid hydrogen contamination problem in the liquid helium
Advertisements

Russ Rucinski, PPD/MD/DZero Ops DZero Solenoid status November 29, 2004.
1 Cooling the Hydrogen (Helium) Absorbers with Small Coolers Michael A. Green University of Oxford Department of Physics Oxford OX1 3RH, UK MICE Video.
Magnet Cooldown Scheme 17 th February 2012 Roy Preece (STFC RAL)
Coupling Coil Test Facility Update Ruben Carcagno Fermilab September 20, 2012.
ZONE 18 CRYOGENICS M. Sanmarti On behalf of AT-ACR-OP section.
February 17-18, 2010 R&D ERL Roberto Than R&D ERL Cryogenics Roberto Than February 17-18, 2010 CRYOGENICS.
ESS Cryogenic System Design
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM24 at RAL June 1, 2009.
1 Technical Arguments in Favor of using the Cryomech PT-415 Cooler for Cooling the LH 2 Experiment Michael A. Green Lawrence Berkeley Laboratory Berkeley.
ITER Cryoplant System Status
Current status Arkadiy Klebaner November 21, 2012
ESS Cryogenic System Process Design Philipp Arnold Section Leader Cryogenics CEC – ICMC 2015 June 29, 2015.
F All Experimenters' Mtg - 9 Jun 03 Week in Review: 06/02/03 –06/09/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
CV activities on LHC complex during the long shutdown Serge Deleval Thanks to M. Nonis, Y. Body, G. Peon, S. Moccia, M. Obrecht Chamonix 2011.
H. Herzog, 22th-26th September 2008 Cryogenics Operations 2008, CERN, Geneva, Switzerland 1 CRYOGENICS OPERATIONS 2008 Organized by CERN LARGE SCALE CRYOGENIC.
Cryogenics Science Center/KEK (Nobuhiro KIMURA –20/April./2010 at ATF2 meeting ) 1 Resent Progress at KEK N. KIMURA, T. TOMARU, Y. AJIMA, T. KUME, A. YAMAMOTO,
MTA Cryogenics: Where We Are The Work of Fermilab AD/Cryo Barry Norris, Christine Darve and a host of wonderfully talented Cryogenic Personnel John Thompson,
4/5/2005FLARE Cryogenics, RLSchmitt1 Argon Refrigeration Supply Purity.
Conceptual Design Study - Cryogenic Requirements How to decide the layout of ILC cryogenic system Conceptual design of cryogenic system Layout of cryogenic.
SCU Layout Concept - Minimal Segmentation Joel Fuerst (ANL) SCU 3-Lab Review Meeting Dec. 16, 2014.
Internal review of superconductors and magnet laboratories 2nd part: Infrastructure/Laboratories Cryogenics Klaus Barth (CERN), Vladislav Benda (CERN)
April, 2009 ERL SRF CRYO MODULES AND CRYOGENIC SYSTEM.
Cryo AIP Muon Campus AIP Review Arkadiy Klebaner January 23, 2012.
January 4, 2007 Project Overview RHIC II Project Internal Cost Review Roberto Than Cryogenics Systems January 4, 2007.
New compressor station Second stage of nitrogen system (N2 refrigerator, cryogenic tank, pipe lines) Cryogenic equipment required to run NICA Third stage.
Cryogenic System for Superconducting Final Focus Magnets* at ATF-2
Subjects for SC FF magnet system at ATF2 Infrastructures at ATF2? How supply cryogen at ATF2 (set up cryogenic system?) (Gas helium recovery line?) Set.
Thomas Jefferson National Accelerator Facility Page 1 SPL Cryogenic and vacuum sectorisations 9-10 November, 2009 Joe Preble Workshop on cryogenic and.
Process Definition of the Operation Modes for Super-FRS Magnet Testing CSCY - CrYogenic department in Common System, GSI, Darmstadt Y. Xiang, F. Wamers.
G-2 Cryogenic System Restoration of G-2 Refrigerator for Proposed E969 Experiment WBS 1.11 Tony Nicoletti 2/8/06.
Restoring Komag Yasuhiro Makida Consideration of restoring and modifying Komag for a stand alone operation without the refrigerator. Contents 1.Magnet.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab MICE Video Conference 120 May 7, 2009.
1 Small Coolers for MICE Michael A. Green University of Oxford Department of Physics Oxford OX1 3RH, UK MICE Collaboration Meeting RAL.
SM18 cryogenics infrastructure upgrade L. Serio TE-CRG.
Central He distribution service upgrade status and dedicated He distribution for AD K. Barth on behalf of TE/CRG ADUC and ELENA Meeting Wednesday, September.
MAGNET#1MAGNET#2MAGNET#3 SATELLITE VB#1 SATELLITE VB#2 SATELLITE VB#3 PRECOOLER#1PRECOOLER#2 DISTRIBUTION VALVE BOX DVB CP#1CP#3CP#2 BUFFER DEWAR LHe 5m.
TE-CRG Activities D. Delikaris, TE-CRG.
RESEARCH AND DEVELOPMENT FOR FUTURE LHC SUPERCONDUCTING MAGNETS POINT SUR LA STATION D’ESSAIS préparé par Jean-Marc Gheller Steering committee –September.
Thomas Jefferson National Accelerator Facility Page 1 CEBAF Cryo & SRF Workshop April 3, 2014 Mathew Wright Cryogenic Systems Operations Engineer
NML Cryogenic System Arkadiy Klebaner Cryomodule One Commissioning June 3, 2011.
17-18 December 2013 LARP VTF Workshop BNL Proposal 1 A.Marone
CMTF Cryogenics (status and plans) SRF program and AD/Cryogenics work presented by Arkadiy Klebaner May 21, 2013.
1 BNL LHC Hi-Lumi QXF Vertical Test Facility Status Update M. Anerella, H. Hocker, P. Joshi, P. Kovach, A. Marone September 25, 2015.
LCLS-II Cryoplant Overview
Makara, Aug. 17, Cryo Dept. Shutdown Status.
Energy efficiency considerations in cryogenics Philipp Arnold Section Leader Cryogenics Proton Driver Efficiency Workshop.
1 Young-Ju Lee Vacuum & Cryogenic Engineering Team National Fusion Research Institute Young-Ju Lee Vacuum & Cryogenic Engineering Team National Fusion.
Study and Development of Large Cryogenic Systems in China
2K Cold Box FDR Introduction
FRIB Cryogenic Support
MICE Meeting at RAL, Oct-23, 2005
Online Helium Inventory Monitoring of JLab Cryogenic Systems
Cryoplant Installation Scope
N. Hasan1, P. Knudsen2 and V. Ganni2
LARP Vertical Test Facility
Preparation of the activities for the LHC Long Shutdown 2
Small Coolers for MICE MICE Collaboration Meeting RAL Michael A. Green
Status of the cryogenic system for B180
Mathew C. Wright October 2016
SHMS Cryogenics and Q2(Q3Dipole) Cool Down
Mathew C. Wright January 26, 2009
Overarching Commissioning Plan
A Complete System for Operation of a Superconducting Magnet*
SNS Cryoplant Commissioning Past Experiences
CryoPlant Commissioning
CTF Users’ Perspective
ESR2 Process Cycle Design
ESR2 Cryoplant Utilities
ESR2 Process Cycle Design
Presentation transcript:

Makara/Geynisman, Aug. 31, Cryo Dept. Shutdown Status

Makara/Geynisman, Aug. 31, Current Operations Tevatron at LN2 temperature except A1, C4, D1, and E1 at room temperature. –Tunnel magnet cryostat vacuums at A25 and D35 regions are of concern. –D-Zero Cryo online with Tev Cryo Compr discharge/suction headers due to pond work. –3 FRIG Mycom comprs (plus CDF) running with helium precooled to LN2 temperature flowing through magnet strings. CHL helium inventory management system operating on clean Helium Tank Farm, though A0 GHe Recovery being vented due to CHL Main Helium Purifier plugged after 8-hour planned power outage. Currently CHL operating Screw Comprs on Mobile Helium Purifier while Main Purifier is being warmed up to room temperature for derime.

Makara/Geynisman, Aug. 31, Current Operations Pbar Helium system (Debuncher and S/C Notch Filter tank) will be cooled down to LHe temperature next week for testing; FRIG Compr system has been purified past several weeks via CDF and D-Zero Helium Purifiers while they were online with FRIG Compr suction/discharge headers. CHL Nitrogen Reliquefier plant off and LN2 supply dependent on vendor deliveries to CHL LN2 dewar tanks; deliveries are fine. CHL runs on a fire hose for ICW.

Makara/Geynisman, Aug. 31, FRIG Maintenance in progress –10 of 13 wet expander flywheels have been replaced –12 of 26 wet/dry expander overhauls of cold ends are completed (A1 thru C2, plus PBar) –Various vacuum, instrumentation, and controls maintenance continuing. CHL Maintenance in progress –Coldbox-1: Charcoal Adsorber east unit regeneration at high temperature completed and now cooling down. –Nitrogen Reliquefier plant maintenance in progress: Marley Cooling Tower refurbishment almost complete. Rotoflow compr aftercooler tube bundle was replaced. TSI Compr 3000 hp motor replaced and newly installed to be test run. –Various compr and facility maintenance in progress