EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement 312453 Ionisation Cooling Test.

Slides:



Advertisements
Similar presentations
Progress in the construction of the MICE cooling channel and first measurements Adam Dobbs, EPS-HEP, 23 rd July 2011.
Advertisements

1 UK Project Alan Grant, STFC. Finance How savings are made Update on stepIV position Milestones Critical Path - stepIV Concerns 2.
Introduction to EuCARD2 & WP4: Applications of Accelerators AccApplic  EuCARD2  WP4: Applications of Accelerators  The applications  Current workshops.
Project Managers Update Roy Preece Particle Physics Department, STFC MICE Video Conference, 18 th September 2014.
Participants WP3total Imperial College CERN STFC University Warwick CRNS University Oxford6 6 Total Euro  - WP3.
MICE FAC Alain Blondel 7 October   MICE The International Muon Ionization Cooling Experiment MICE CM19.
1 MICE PM Report Installations to date Future installation work Preparations for Phase Two Target status MICE Video Conference, 22nd May, 2008.
K. Long, 26 June, 2015 Phase II: introduction to discussion Background (reminder) Responses Assumptions Presently planned bids Input to summary table Summary.
WP4: Applications of Accelerators
Accelerating Science and Innovation. Science for Peace CERN was founded in 1954 as a Science for Peace Initiative by 12 European States Member States:
Report from WP4: Applications of Accelerators AccApplic  Accelerator Applications  Aims of WP4  Workshops so far  Future workshops  Status  Plans.
Alan Grant OsC 30/4/ UK Project Finance & Schedule.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement Overview of EuCARD-2.
Emittance measurement: ID muons with time-of-flight Measure x,y and t at TOF0, TOF1 Use momentum-dependent transfer matrices iteratively to determine trace.
MICE TECHNICAL UPDATE & ISIS/RAL PLANS. Belgium Italy Japan The Netherlands Russian Federation Switzerland UK USA Acknowledge.
Emittance measurement: ID muons with time-of-flight Measure x,y and t at TOF0, TOF1 Use momentum-dependent transfer matrices to map  path Assume straight.
1 UK PM Report Costs & Schedule Alan Grant, STFC.
SuperB. SuperB has been approved as the first in a list of 14 “flagship” projects within the new national research plan. The national research plan has.
European design study on Neutrinofacilities - Euronu within FP7.
RSLR mtg 28/3/2014 RLSR mtg Alan Grant. 2 RLSR mtg 28/3/ MICE Finances - Forward Look.
The status of the construction of MICE Step IV K. Long, on behalf of the MICE collaboration.
Results from Step I of MICE D Adey 2013 International Workshop on Neutrino Factories, Super-beams and Beta- beams Working Group 3 – Accelerator Topics.
ICHEP 2012 Melbourne, 7 July 2012 Paul Soler on behalf of the MICE Collaboration The MICE Beam Line Instrumentation (Trackers and PID) for precise Emittance.
Norman McCubbin1 Report from the Collaboration MICE Project Board (CMPB) Norman McCubbin Director, Particle Physics Department MICE/UKNF Oversight Committee.
Status of the MICE Project & Dashboard MICE Project Board 14 th November 2013 Roy Preece.
Particle Production in the MICE Beamline IPAC10 Linda Coney, UC Riverside, Adam Dobbs, Imperial College London, Yordan Karadzhov, Sofia University The.
RLSR 16/4/2015 UK Financial Plan & Risks. Content Finances – Cost to Completion Risks – Top level to completion – R9 working space – Summary 2 RLSR 24/11/2014.
MICE FAC Alain Blondel 21 september   MICE The International Muon Ionization Cooling Experiment BRIEF STATUS OF MICE.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement EuCARD-2 Communication.
MICE Status & Plans MICE-UK paul drumm 15 th September 2004.
John Womersley Welcome Director of Particle Physics, CCLRC International Scoping Study Meeting, RAL April 2006.
Project Managers Report CM40 Collaboration Board – Rome Roy Preece 28 th October 2014.
MICE CM 29 Collaboration Board Summary. Agenda 1.Intro 2.Approval of minutesBooth/Bross 3.Spokeʼs remarks & EB reportBlondel 4.PM reportNichols 5.US magnet.
MICE CC visit at CERN Alain Blondel 1   MICE The International Muon Ionization Cooling Experiment.
MICE Oversight Committee Meeting RAL, 24 April 2014 Paul Soler on behalf of the MICE Collaboration Status of MICE and Spectrometer Solenoids.
MICE CMPB Alain Blondel 1 Highlights on MICE.
MICE FAC open session Alain Blondel 1   MICE The International Muon Ionization Cooling Experiment.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement European Network for.
Progress in the construction of the MICE cooling channel and first measurements Adam Dobbs, EPS-HEP, 23 rd July 2011.
OsC mtg 24/4/2014 OsC mtg Alan Grant. 2 OsC mtg 24/4/ MICE Finances - Forward Look.
CHIPP Aug 2010J.S. GraulichSlide 1 MICE and the Neutrino Factory Jean-Sebastien Graulich, Geneva.
Status and Plans for EUROnu FP7 Design Study Status and Plans for EUROnu FP7 Design Study EUROnu = A High Intensity Neutrino Oscillation Facility in Europe.
1 UK PM Report Costs & Schedule Alan Grant, STFC.
MICE CM20 Alain Blondel 10 February The International Muon Ionization Cooling Experiment MICE CM20 Spokesmouse remarks.
Aims of the Workshop  EuCARD2  WP4: Applications of Accelerators  Past workshops  Future workshops  Plans  Aims of this workshop EuCARD-2 is co-funded.
1 Costs to Completion Common funds &Running Costs Support for Running OPERA Funding Issues L. Votano Resource Coordinator OPERA Funding Agencies meeting.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement EuCARD-2, ADS, linacs,
CHIPP Oct 2007Jean-Sébastien Graulich Status of MICE Jean-Sebastien Graulich, Univ. Genève o o Introduction o o Beam Line o o Technical Design o o PID.
CARE08 Dec 2008Jean-Sebastien GraulichSlide 1 MICE, a facility for precision beams and muon cooling o MICE in EuCARD o MICE Facility: Beam, Infrastructure.
EURO EURO A High Intensity Neutrino Oscillation Facility in Europe Introduction Aims Structure Tasks Link to other activities Future dates.
1 How the Muon Ionization Cooling Experiment Found a Home MICE hall at RAL in Spring
WP4: Applications of Accelerators AccApplic  WP4: Applications of Accelerators  The applications  Current workshops  Future workshops  Plans EuCARD-2.
RLSR 16/4/2015 UK Financial Plan & Risks. Content Finances – FY 2014/15 – Cost to Completion Risks – Top level to completion – R9 working space – Summary.
Collaboration Board RAL, 30 October 2015 Paul Soler, Stefania Ricciardi MICE Common Fund Status.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement EUCARD-2 Update for.
FISCO2 – Financial and Scientific Coordination Work Package dedicated to ENSAR2 management WP leader: Ketel Turzó WP deputy: Sandrine Dubromel ENSAR2 Management.
Schedule and Milestones Roy Preece STFC RAL FAC 17 th April 2015.
1 UK Project Finance & Schedule. Overview Finance  Budget Setting 2013/14  June Finance  Forward look to complete stepVI Schedule  Overview 2.
MICE Step IV Commissioning: Overview (March-April 2015) Milorad Popovic MAP 2015 Spring Collaboration Meeting.
UK Project Plan Roy Preece STFC RAL RLSR 26 th October 2015.
Muon Ionization Cooling Experiment - MICE HEPTech - Grenoble 4-5 th June 2015 Tom Bradshaw STFC, Rutherford Appleton Laboratory.
Muon Ionisation Cooling Experiment Overview
An introduction to MICE
Accelerator R&D for Future Neutrino Projects
UK Financial Plan & Risks
Accelerator Research and Innovation for European Science and Society
European Detector R&D: AIDA
Completing the Step IV Programme
Report on EUCARD WP6: MICE Transnational Access (TA)
K. Tilley, ISIS, Rutherford Appleton Laboratory, UK Introduction
Presentation transcript:

EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement Ionisation Cooling Test STFC WP8 Roy Preece Particle Physics Department, STFC EuCARD2 Annual Meeting, Barcelona, April 2015

2 Content  ICTF – Reminder of what it is  Users Update – How is the ICTF being used  TNA Applications / Allocations

3 ICTF  The Ionisation Cooling Test Facility (ICTF) comprises a specially developed target and beam-line at the ISIS proton synchrotron (800 MeV) at STFC’s Rutherford Appleton Laboratory.  The beam-line provides µ, p, π, e at 100 MeV/c to 400 MeV/c. It has been operational for several years, though intensity continues to increase.  The ICTF infrastructure includes installations to supply radio-frequency (RF) power and liquid hydrogen (LH2).  The ICTF beam and infrastructure have been designed for the study of ionisation cooling, and meet the requirements of the Muon Ionisation Cooling Experiment (MICE), which is installed at the ICTF.  WP8 under EuCARD-2 supports access to the ICTF.

ICTF : Ionisation Cooling Test Facility Beamline Experimental Hall

Users of the MICE Muon Ionisation Cooling Experiment (MICE) MICE is a key step for evaluating the feasibility of ionisation cooling for a neutrino factory and possible µ-collider. An international project with many collaborators around the world European Collaborators – UK, Switzerland, CERN, Bulgaria, Netherlands, Italy and Belgium. USA, China and Japan The ICTF was originally built to supply beam for the MICE experiment To this point the MICE Project has been the user of the ICTF I hope this will change and I will be able to report on an additional experiment utilising the ICTF

MICE SCHEDULE – STEP IV Step IV Construction complete June 2015 Step IV Commissioning complete August 2015 Absorber materials to be used are Lithium Hydride and Liquid Hydrogen Data taking period to end 1 st June 2016

MICE SCHEDULE – Cooling Demonstration Cooling Demonstration Construction complete March 2017 Cooling Demonstration Commissioning complete May 2017 Absorber material to be used for final step is Lithium Hydride Data period to end of UK FY 18

8 MICE Step IV Installation

9 MICE Update  EMR, KL and TOF –Data runs complete –The main area that the access has been used for.  

10 TA (WP8): application process  Applications are assessed by TA Panel: –Ken Peach (Oxford, Chair) –Francesco Terranova (Milan) –Steve Geer (Fermilab) –plus technical and administrative input as needed.  Panel works on cycle of two calls per year, advertised on the web pages of: –EuCARD-2 ( –PPD – STFC (  Contact has been made with the Research Directors of PSI, KEK and TRIUMF who have been asked to advertise the access to the ICTF throughout their communities.

11 Allocations  Application was received at the September 2014 deadline from University of Geneva  An allocation of €30k for a 18 month period (~184 visitor days, ~770 access units)  Applications were received from The University of Sofia, INFN and a new MICE collaborator, the University of Belgrade at the March 15 deadline. –The Project coordinator was contacted to confirm associated membership of the EU for Serbia –Happy to say they are permitted to apply for funding  The latest allocations panel has not as yet met and so allocations have not been made. –The meeting date has been set as the 5 th May  Next call deadline will be September 2015

12 Allocations made and Access units  Total funding for the 4 year project – €199,058 –Access management estimate – €45,443 –Leaving €153,615 Euro for access support  This estimate has come from the following :- –Number of visits – 36 –Persons present per visit – 2 –Days spent at the facility – 8 –Travel estimate used – €700 –Subsistence (Accommodation + subsistence) – €182  My estimates for travel and subsistence –Return flight to be no more than €400 –Accommodation (including breakfast) at Ridgeway house £60 (€72) –Meals - £35 (€42)  Total Units of Access for the lifetime of the project – 2280 InstituteAllocation period startAllocation period endCurrent periodAllocation(€)Spend on allocation (€)Num Users for periodUser days for periodAccess Units for period GenevaSep-13Sep-14No University of SofiaSep-13Mar-15No INFNSep-13Mar-15No GenevaSep-14Sep-15Yes University of SofiaMar-15Sep-16YesTBD 0 INFNMar-15Sep-16YesTBD 0 BelgradeMar-15Mar-17YesTBD 0 Totals Total Spend€ 51,810 Total Days559 Access Units2337 Required2280 Percentage102% Budget€ 153,615 Remaining budget€ 101,805