Beam Diagnostic Tools David Christian Fermilab May 17, 2013.

Slides:



Advertisements
Similar presentations
ATF2: Status Update Glenn Christian (on behalf of FONT group) 10 th ATF Project Meeting.
Advertisements

24 September 2002Paul Dauncey1 Trigger issues for the CALICE beam test Paul Dauncey Imperial College London, UK.
RPC Electronics Status Overall system TDC –Digitizing frequency issue (determine the bin size of the TDC value) Discriminator test result Trigger module.
D. Peterson, “Status of the Cornell/Purdue Program” TPC R&D Mini Workshop, Orsay 12-January Status of the Cornell/Purdue Program: first events with.
DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 1 DDAQ Trigger o Reminder: DAQ Trigger vs Particle Trigger o DAQ Trigger o Particle Trigger 1) Possible.
1 Linac/400 MeV BPM System Status Nathan Eddy PIP Meeting 8/8/12.
Conducting a Test Beam Experiment - Page 1 To begin with, elect an experimental spokesman, who can act as a coordinator. Survey the area to understand.
U niversity of S cience and T echnology of C hina Design for Distributed Scheme of WCDA Readout Electronics CAO Zhe University of Science and Technology.
3/7/05A. Semenov Batch-by-Batch Intensity Monitor 1 Two-Channel Batch by Batch Intensity Monitor for Main Injector BBI.
Status of the Beamline Simulation A.Somov Jefferson Lab Collaboration Meeting, May 11, 2010.
Craig Drennan Linac and Booster Beam Diagnostics Proton Source Workshop December 7 and 8, 2010.
Hall A DAQ status and upgrade plans Alexandre Camsonne Hall A Jefferson Laboratory Hall A collaboration meeting June 10 th 2011.
Jornadas LIP 2008 – Pedro Ramalhete. 17 m hadron absorber vertex region 8 MWPCs 4 trigger hodoscopes toroidal magnet dipole magnet hadron absorber targets.
NMLTA Protection System Update -Loss Monitors- Arden Warner October 13 th, 2010 Arden Warner, FNAL.
Status of the NO ν A Near Detector Prototype Timothy Kutnink Iowa State University For the NOvA Collaboration.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 17, 2013.
Electron Spectrometer Work Package Simon Jolly 19 th May 2014.
A Novel Digitization Scheme with FPGA-based TDC for Beam Loss Monitors Operating at Cryogenic Temperature Wu, Jinyuan, Arden Warner Fermilab Oct
The Meson Test Beam Facility Erik Ramberg LRP Meeting – Oct. 30,2003 Delivering MI beam to MTBF User area layout Operational characteristics Detectors.
Lead Fluoride Calorimeter for Deeply Virtual Compton Scattering in Hall A Alexandre Camsonne Hall A Jefferson Laboratory October 31 st 2008.
Asian Test Beam Facilities Satoru Uozumi Kyungpook National University Mar-29 th 2010 Beijing China IHEP Beijing TBF Russia.
NUMI Off Axis NUMI Off Axis Workshop Workshop Argonne Meeting Electronics for RPCs Gary Drake, Charlie Nelson Apr. 25, 2003 p. 1.
Peter-Bernd Otte - 8 th March 2010 CB collaboration meeting, Mainz.
Status of NA62 straw electronics Webs Covers Services Readout.
January 31, MICE DAQ MICE and ISIS Introduction MICE Detector Front End Electronics Software and MICE DAQ Architecture MICE Triggers Status and Schedule.
1 Linac/400 MeV BPM System Plans and Status Nathan Eddy PIP Meeting 9/7/11.
Apollo Go, NCU Taiwan BES III Luminosity Monitor Apollo Go National Central University, Taiwan September 16, 2002.
1 07/10/07 Forward Vertex Detector Technical Design – Electronics DAQ Readout electronics split into two parts – Near the detector (ROC) – Compresses and.
F.Murtas1 CNAO- ARDENT Workshop October 19 th 2012 Triple GEM detectors : Beam monitoring for beam profile and intensity measurements. Construction of.
Beam Line BPM Filter Module Nathan Eddy May 31, 2005.
Proposed AP2 line BPM readout card 1. Variation on a theme – based on debuncher LLRF boards. Reuse uController, CPLD, Ethernet, SDRAM, Software 2. Nim.
June 7, 2004Karen Dow CODA at Bates BLAST Data Acquisition.
Jefferson Laboratory Hall A SuperBigBite Spectrometer Data Acquisition System Alexandre Camsonne APS DNP 2013 October 24 th 2013 Hall A Jefferson Laboratory.
High Rate Tracking Test Beam Area David Christian & Richard Coleman.
CMS pixel telescope at MTEST 1 A. Kumar, S. Kwan, A. Prosser, R. Rivera, M. Turqueti, L. Uplegger.
NA62 straw readout Characterization and qualification of the frontend electronics Detector and interface to frontend Small readout system Plans Expected.
Peter LICHARD CERN (NA62)1 NA62 Straw tracker electronics Study of different readout schemes Readout electronics frontend backend Plans.
Craig Drennan Linac and Booster Beam Diagnostics Proton Source Workshop December 7 and 8, 2010.
11 October 2002Paul Dauncey - CDR Introduction1 CDR Introduction and Overview Paul Dauncey Imperial College London.
Vienna Group Discussion Meeting on Luminosity CERN, 9 May 2006 Presented by Claudia-Elisabeth Wulz Luminosity.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
16th May 2007 MICE tracker phone meeting 1 Setup test bench/ Installation DATE Hideyuki Sakamoto 16 th May 2007 MICE phone meeting.
ATLU for AIDA High Rate Synchronous as well as Asynchronous 21/11/2013 David Cussans, AIDA WP9.3, DESY 1.
Tracking at the Fermilab Test Beam Facility Matthew Jones, Lorenzo Uplegger April 29 th Infieri Workshop.
May E906 Work and Status TDC readout – One full TDC board, 4 ECL cables/modules KTEV UCLA LV PS – Thanks Dave N.! – +/- 5V, 18A each – Spade /10-12AWG.
The NA62 Spectrometer Acquisition System TWEPP 2015, Lisbon Peter Lichard and Vito Palladino - CERN On Behalf of NA62 Straw Working Group.
CBM-TOF-FEE Jochen Frühauf, GSI Picosecond-TDC-Meeting.
1 IP FB tests at ATF2 Philip Burrows Douglas Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John Adams Institute Oxford.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
Proposal for the End Station Test Beam (ESTB) at SLAC John Jaros ALCPG09 Albuquerque September 30, 2009.
Tevatron Beam Position Monitor Upgrade Stephen Wolbers (for the Tevatron BPM Upgrade Project) PAC05, Knoxville, TN May 16-20, 2005.
TLU plans 21/03/20161 D. Esperante, Velo upgrade meeting.
Mai 31th 2011 Christophe Beigbeder PID meeting1 ETD meeting Test setup : Activities in Bari, Univ of Maryland and at Orsay Test setup : Activities in Bari,
Readout controller Block Diagram S. Hansen - CD-1 Lehman Review1 VXO Ø Det Links to 24 SiPM Front End Boards Clock Event Data USB ARM uC A D Rd Wrt 100Mbit.
Minerva Test Beam 2 Status Geoff Savage for the Test Beam 2 Team March 23, /23/2015AEM - Minerva Test Beam 2 Status1.
NMLTA Protection System Update -Loss Monitors- Arden Warner September 2 nd, 2009.
DAQ and Trigger for HPS run Sergey Boyarinov JLAB July 11, Requirements and available test results 2. DAQ status 3. Trigger system status and upgrades.
AEM Meeting E906/SeaQuest Kazutaka Nakahara University of Maryland 1/13/2014.
Andreas Horneffer for the LOFAR-CR Team
Status of NA62 straw readout
High-Resolution Micromegas Telescope for Pion- and Muon-Tracking
PADME L0 Trigger Processor
CoBo - Different Boundaries & Different Options of
L0 processor for NA62 Marian Krivda 1) , Cristina Lazzeroni 1) , Roman Lietava 1)2) 1) University of Birmingham, UK 2) Comenius University, Bratislava,
Summer 2000 HF Beam Test. DAQ proposal.
Run experience Cover FW SRB FW DAQ and monitoring
Possible Upgrades ToF readout Trigger Forward tracking
Conceptual design of TOF and beam test results
CLAS12 Timing Calibration
Trigger issues for the CALICE beam test
Presentation transcript:

Beam Diagnostic Tools David Christian Fermilab May 17, 2013

Run 1 Review Intensity from AD ACNET – Ion chamber measurements of #protons/spill Some inconsistencies Should calibrate again using foil activation after beam is reestablished & stable – SWIC profiles – (Loss monitors) Three scintillator telescope looking at interactions in SWIC & Ion chamber just upstream of helium pipe (~15’ upstream of targets) – Non linear response with increased beam intensity – Probably affected by neutrons from FMAG (beam dump) 2

Run 1 Review (cont) Hodoscope rates – Scalers read out at 10 kHz – FFT posted on web page for AD use – Obvious 360 Hz structure – Lots of other structure too 3

Run 1 Review (cont) Quarknet splatblock – “multiplicity” input from 1 st level V1495 (number in H2T 0-15) – Running sum of 8 RF buckets – Veto triggers if Sum>Cut (veto if sum crosses threshold after trigger bucket as well as before) Deficiencies – Not synched to Main Injector RF (20 ns cycle, only ~8RF buckets) – 8RF buckets is too short; doesn’t cover entire memory time of chambers (St 2 TDC distribution is ~250ns wide = 13 RF buckets) – Didn’t have a measurement of beam delivered during splatblock – Splatblock using spectrometer depends on target – bad for cross section measurements 4

Run 2 Plan Beam Intensity Monitor – Cerenkov counter located well upstream (~150’) Not sensitive to neutrons Signal should be proportional to beam intensity – Instrumented with one phototube Read out with new NIM module with QIE10 – Clocked with Main Injector 53 MHz – Signals arrive early enough to allow splatblock based on at least 16 RF buckets after trigger. – Will accept DAQ live/dead input & keep track of beam delivered during DAQ live/dead time. 5

Beam Intensity Monitor Status Cerenkov counter will be installed “soon” Cables have been pulled. Will use Ar/CO 2 as radiator 8-stage Phototube & fully transistorized base are in hand 6

Beam Intensity Monitor Status (cont) Readout Electronics Status: – PCB schematic finished (as of 5/16) – Key parts ordered or in hand QIE10_P4: 1/board – in hand Memory: 2 (16x64 Mbit) – ordered Processor: 1 STM32F405 (ARM Cortex) – in hand FPGA: 1 Cyclone 3 EP3C16 – in hand Ethernet: 3 Wiznet (100 Mbps) – in hand FRAM(*): 1 – ordered (*) FRAM (or FeRAM) = Ferroelectric RAM; nonvolatile, supports many read/write cycles (unlike Flash memory) 7

NIM Module Schedule Layout complete: 5/30 PCBs rec’d: 6/17 Available for 1 st tests of readout: 6/2188 (should have been 6/21/13!!) 8