2010-2011 Biennial Transmission Plan Studies Update - DRAFT April 6, 2011.

Slides:



Advertisements
Similar presentations
1 Report of the Planning Coordination Committee Report to the WECC Annual Meeting April 20, 2006 Robert Jenkins, PCC Chair.
Advertisements

NTTG Report to TEPPC BiennialTransmission Plan.
1 Report of the Planning Coordination Committee WECC Board of Directors Meeting April 21, 2006 San Diego, CA.
Operating Transfer Capability Policy Committee Report Board of Directors Meeting April 21 & 23, 2004 Thomas A. Delawder OTCPC Chair Western Electricity.
Northern Tier Transmission Group SPG Report to TEPPC June 17, 2010 Denver To ensure efficient, effective, coordinated use & expansion of the members transmission.
Demand Resource Operable Capacity Analysis – Assumptions for FCA 5.
Reliability Subcommittee Report Vishal C. Patel Chair – Reliability Subcommittee March 2014.
TransWest Express and Gateway South WECC Planning Coordination Committee David Smith, National Grid October 25-26, 2007 Vancouver, B.C.
SSG-WI System Model Data Requirements [PART 1] September 5, 2002 Las Vegas, NV.
March 26, 2014 Transmission Coordination and Planning Committee 2014 Q1 Stakeholder Meeting.
CREPC Meeting November 5-6, 2007 Snapshot of Major Transmission Proposals and Status of Transmission Planning Presenters: Paul Arnold and Jeff Miller.
Goshen Area Bus Reconfiguration
NTTG Economic Study and Biennial Study Update NTTG Economic Study and Biennial Study Update NTTG Study Cycle.
Connection of Wind Farms to Weak AC networks – ERCOT Experience and Challenges Shun-Hsien (Fred) Huang ERCOT System Planning CIGRE WG B4.62 Meeting June.
SPP’s 2013 Energy Consumption and Capacity 2 12% annual capacity margin requirement CapacityConsumption Total Capacity 66 GW Total Peak Demand 49 GW.
Tucson Area Reliability Mike Flores Control Area Operations Tucson Electric Power May 2000.
WECC PCC Meeting Salt Lake City, UT March 26, 2014.
System Voltage Planning Brian Moss PD / Transmission Planning Transmission Planning Overview October 30, 2007.
KERN RIVER GAS TRANSMISSION COMPANY Wyoming Pipeline Authority Casper, Wyoming August 21, 2007 John Dushinske Vice President of Marketing & Regulatory.
WECC PCC Meeting Salt Lake City, UT July 16, 2014.
ColumbiaGrid Planning Update to PCC Marv Landauer October 7, 2014.
California Energy Commission Workshop Nuclear Power Plant Issues
SPP.org 1. 2 Aggregate Transmission Service Study (ATSS)
Stability analysis on WECC Systems with Wind Penetration and Composite Load Model Hyungdon Joo and Melissa Yuan Mentor Yidan Lu Professor Kevin Tomsovic.
Montana Ambassadors Helena, Montana February 25, 2011.
Anjali Sheffrin, Ph.D. Chief Economist & Director, Market Design & Product Development Integration of Wind Resources in CAISO Markets and Grid Operation.
Rocky Mountain Area Transmission Study RMATS Economics Reference Cases Economic Comparisons Distribution of Economic Gains and Losses RMATS Steering Committee.
Energy Gateway Gateway West Project Gateway South Project
Charles Hosken, General Manager Imperial Irrigation District
5/23/08ACC 5 th BTA Workshop – Phoenix - SWAT – RE Kondziolka 1 SWAT Subregional Planning Group Update Arizona Corporation Commission Fifth Biennial Transmission.
Past Studies and Resource Diversity Western Renewable Energy Zones, a joint initiative of the Western Governor’s Association and the U.S. Department.
Overview of the North American and Canadian Markets 2008 APEX Conference in Sydney, Australia October 13, 2008 Hung-po Chao Director, Market Strategy and.
Peak RCCo Performance Metrics Draft –November 2013.
WestConnect Activities Charles Reinhold WestConnect Project Manager 2008 ACC BTA Workshop Phoenix, AZ May 22, 2008.
Energy Gateway Update for Wyoming Infrastructure Authority January 27, 2009 Darrell Gerrard Vice President Transmission System Planning.
ISO Outlook Summer 2005 and Beyond Senate Energy, Utilities and Communications Committee February 22, 2005 Jim Detmers Vice President of Grid Operations.
CWAG ENERGY CONFERENCE BIG SKY, MT Collaborative Efforts to Find Solutions: A Case Study – The Mountain States Transmission Intertie (MSTI) Presented by.
Study Results High EE/DG/DR Study This slide deck contains results from the 2011 TEPPC Study Program. This study shows the results of an increase of EE/DG/DR.
Current Export Initiatives Jerry Mossing Exports Workshop February, 16,2006, Metropolitan Center, Calgary.
Resource Adequacy Steering Committee Meeting October 4, 2011.
“DRAFT” RMATS 2008 Base Case (To be presented at the RMATS Stakeholders Meeting) March 17, 2004.
Dale Osborn Midwest ISO October 13, 2008 EE 590 Transmission Planning with Significant Energy Resources.
Power Association of Northern California Maintaining Grid Reliability In An Uncertain Era May 16, 2011 PG&E Conference Center Jim Mcintosh Director, Executive.
Southwest Renewable Energy Transmission Conference May 21, 2010 This report contains transmission planning data that may be conceptual in nature and is.
Big Stone II – Delivery Study Phase 6 and Supplemental #2 For Northern MAPP SPG Meeting 4/3/07 Elk River Richard Dahl Missouri River Energy Services.
Southern California Edison The San Onofre Nuclear Generating Station April 14, 2011.
May14, 2010 RPG Meeting Houston Import Study Update Jeff Billo.
A new Nomogram Development POM- based tool - Application results in the Idaho Power System. Orlando Ciniglio, IPC Marianna Vaiman, V&R Energy WECC TSS.
California Energy Commission The Loading Order – How Are We Doing? Jackalyne Pfannenstiel Chairman California Energy Commission Independent Energy Producers.
Chelsea Loomis, Regional Electric Transmission Planning.
Planning the Networked Grid Transmission Planning J.E.(Jeff) Billinton Manager, Regional Transmission - North Building the Networked Electricity Grid –
Renewable Energy Transmission Initiative 2.0 Plenary Group Meeting April 18, 2016 Sacramento, CA Thomas Carr Western Interstate Energy Board TEPPC’s Resource.
LS Power LS Power is a power generation and transmission group
Sixth Northwest Conservation & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Generating Resource Advisory Committee Meeting.
Northern Tier Transmission Group Report to Columbia Grid Planning Committee February 9, 2012 “To ensure efficient, effective, coordinated use & expansion.
Study Plan Development & Approach May 5, 2010 Conference Call & Webinar “To ensure efficient, effective, coordinated use & expansion of the members’
PC05 Low Hydro Study Results
PC04 High Hydro Study Results
1 NTTG Transmission Planning Process Columbia Grid Open Season Meeting August
Columbia Grid Wind Integration Study Team Dynamic Transfer Capability Studies Update 9/10/09.
Proposal to Remove from Service the PV-COI RAS
Eleanor Ewry Base Case Coordination Subgroup Chair
Western Electricity Coordinating Council
Study Results California In-State Net-Short California Out-State Net-Short California Out-State Net-Short w SWIP N This slide deck contains results from.
PacifiCorp Overview Choose from three different title slide designs by selecting “New Slide.” These slides are suitable for business and community presentations.
Palo Verde-COI RAS Retirement
Proposal to Remove from Service the PV-COI RAS
Palo Verde-COI RAS Retirement
ColumbiaGrid Planning Update to PCC Marv Landauer October 7, 2014
Jim Mcintosh Director, Executive Operations Advisor California ISO
Presentation transcript:

Biennial Transmission Plan Studies Update - DRAFT April 6, 2011

NTTG Planning Committee 2 John Leland - Chair, Northwestern Energy Dave Angell - Vice Chair, Idaho Power Chris F. Collins - NextEra Energy Resources, Inc. Brian DeKiep - Montana Public Service Commission Erik Egge - Black Hills Power Marshall Empey - UAMPS Darrell Gerrard - PacifiCorp Bill Hosie - TransCanada Rhett Hurless - Grasslands Renewable Energy Don Johnson - Portland General Electric Kim Johnson - Riverbank Power Corp. Paul Kjellander – Idaho Office of Energy Resources Rodney L. Lenfest - Sea Breeze Pacific Matthew Stoltz - Basin Electric Jim Tucker - Deseret Power Electric Cooperative David Walker – Wyoming Public Service Commission Ted Williams - Gaelectric, LLC NTTG Planning Purpose Provide a forum where all interested parties are encouraged to participate in the planning, coordination, and implementation of a robust transmission system that is capable of supporting an efficient west-wide electricity market while meeting WECC and NERC reliability standards.

Study Steps  Null Case – Current network with 2020 NTTG Loads  System cannot serve loads reliably  Core Case – Current network with infrastructure upgrades and ‘Foundation List’ projects  Based on WECC 2020 Heavy Summer Base Case  Dispatched within PROMOD over 8784 hours of2020 as modeled by TEPPC in PC0 Base Case  Five hours of stress in NTTG’s footprint exported for power flow analysis  Cases were solved and passed N-1 contingency analysis within study criteria 3

Study Steps (cont.)  Scenario Cases – Four Levels of Resource Addition  3,000 megawatts in Montana  3,000 megawatts in Wyoming  3,000 MW in Montana, 3,000 MW in Wyoming  6,000 MW in Wyoming  Studied for the same five hours as for Core Case  Scenario resources added; offset by generation reductions  Removed generic California & Arizona ‘RPS’ resources added by TEPPC, remaining reductions at nuclear plants  Looked for limited transmission additions that would allow all five hours to pass an N-1 contingency study 4

Selecting the Hours Studied  Congestion most likely during  Peak load  High transfers  Studied to identify hours with maximum flows and paths at limits  Remote development of renewable resources may lead to high flows to load areas  2 Peak load hours  Winter: July 27, Hour Ending 16:00  Summer: December 22, Hour Ending 18:00  3 High transfer hours  March 2, Hour Ending 21:00 (highest spring exports)  October 4, Hour Ending 21:00 (highest fall exports)  August 10, Hour Ending 13:00 (highest annual import) 5

Peak Load Hour Selection 6 Hours of coincidental peak load for the NTTG footprint were selected.

High Transfer Hours Selection 7 Mar 02, H21 Aug 10, H13 Oct 04, H21 Red markers show hours exceeding 96% of maximum or minimum

The Resource Scenarios 8 CaseAdded Wind Generation Location NullExisting Gen CoreNone Scen 3 3,000Montana Scen 4 3,000Wyoming Scen 23,000 Montana Wyoming Scen 1 6,000Wyoming

Resources Displaced/Reduced 9 Reduce generic resources added by TEPPC to meet RPS, planning reserve targets in California and Arizona Different dispatches in each of the five hours means different generators were reduced Reduce output of San Onofre, Diablo Canyon, Palo Verde to get required megawatts Ratio of two California MW for each in Arizona Alberta and Oregon generators had been added by TEPPC to meet California RPS needs

Contingency Analysis  Performed using PowerWorld program  N-0: Test the network with all elements in service  N-1: Test the network with removal of single elements  Contingency lists contained elements in the Northern Tier footprint at or above 230 kV  Report significant changes at or above 230 kV  Elements in the Northern Tier footprint were monitored  Increase in flows by more than 2% in elements above 100% of rating  Voltage changes of more than 1%, outside 90%-110% range 10

Midpoint Aeolus Clover Crystal Robinson Results of Scenario 4 Analysis 11 Scenario 4 – 3,000 MW in Wyoming –Significant problems occurred on the high export hours (March noted here) –Problems with paths TOT2A, COI Generic Solution: Add Transfer Capability 1)1,500 MW capacity from Clover (Central UT) to Crystal (Southern NV) Still 900 MW over COI limit 2)1) + 1,500 MW capacity Midpoint-Robinson COI less than 100 MW over, 200 violations 3)1) + 1,500 MW capacity Aeolus-Crystal COI 104 MW over limit, 132 violations 3) appears adequate, violations can can be resolved by local controls Other hours studied have fewer issues

Results of Scenario 3 Analysis Scenario 3 – 3,000 MW in Montana –Significant problems again occurred on the high export hours –Problems with Montana to Northwest, COI paths Generic Solution: Add Transfer Capability 1)Added 1,500 MW from Townsend (Central MT) to Midpoint (Central ID) Montana-Northwest over by 400 MW Still 1,700 MW over on COI 2)Tested 3,000 MW transfer capability from Townsend via Midpoint and Robinson to Harry Allen Fixed problems on Montana-Northwest COI just 325 MW over limit 77 violations 2) appears adequate, violations can be resolved with local controls –Other hours studied again have fewer issues 12 Townsend Midpoint Harry Allen Robinson

Results of Scenario 2 Analysis Scenario 2 – 3,000 MW in Montana, 3,000 in Wyoming –Adding Townsend-Midpoint and Clover-Crystal was inadequate 1,700 MW over limit on COI, 1,600 MW over Montana-Northwest limit –Tested combined Scenario 3 and Scenario 4 transmission additions 3,000 MW capability from Townsend via Midpoint and Robinson to Harry Allen plus 1,500 MW from Aeolus to Crystal plus 1,500 MW from Clover to Crystal 29% over limit on Victorville-Lugo 350 MW over COI limit of 4,800 MW 98 criteria violations –Appears adequate, violations can be resolved with local controls –Other hours have not been tested, given previous dominance of March hour 13 Townsend Midpoint Aeolus Clover Crystal Robinson

Results of Scenario 1 Analysis Scenario 1 – 6,000 Megawatts in Wyoming –Adding 3,000 MW transfer capability Clover-Crystal line was inadequate 2,100 MW over limit on COI, 433 criteria violations –Also adding 3,000 MW transfer capability Aeolus-Crystal still left problems COI was 760 MW over its limit 147 criteria violations –Further addition of 1,500 MW transfer capability Midpoint-Robinson left fewer problems COI still 200 MW over limit 119 remaining criteria violations –Addition of phase shifting transformers or substituting two kV DC lines would likely further reduce problems 14 Midpoint Aeolus Clover Crystal Robinson

Initial Conclusions  Adding 3,000 MW of generation in either Montana or Wyoming appears to require 3,000 MW of additional transfer capability through a partial 500 kV double-circuit AC or single-circuit DC solution to deliver via Southern Nevada to Arizona and California  Delivery via Northwest would require upgrades MT-NW and to COI  Adding 3,000 MW in both Montana and Wyoming works relatively well with double-circuit 500 kV AC from Townsend to Harry Allen via Midpoint and Robinson, a 500 kV line from Aeolus to Crystal and another from Clover to Crystal. DC tie lines of comparable capacity should work as well  With 6,000 MW in Wyoming, double-circuit from Aeolus to Crystal plus double-circuit from Clover to Crystal still needs Midpoint- Robinson to get reasonable results. Again DC tie lines should be adequate as well 15

Next Steps NTTG Biennial Planning Cycle 16

QUESTIONS? 17