37 th IG meeting 31 st May 2016 Enagás, GRTgaz, Reganosa, REN and TIGF.

Slides:



Advertisements
Similar presentations
Madrid, 29 th January th RCC Meeting South Gas Regional Initiative.
Advertisements

1 Madrid, 2 nd Nov th IG Meeting South Gas Regional Initiative VI. MIBGAS.
GRIP South South Region Second Edition Gas Regional Investment Plan SGRI – 13 December 2013.
CMP PROPOSAL FOR HARMONISATION 17 th IG meeting Madrid 2 nd November 2011.
GRIP South South Region Gas Regional Investment Plans SGRI – 23 September2013.
15 November th SG meeting Enagás and TIGF Coordinated implementation of the Network Code on Capacity Allocation Mechanisms.
1 29 th April 2014 Teleconference 28 th IG Meeting South Gas Regional Initiative.
1 12 th December 2014 Teleconference 29 th IG Meeting South Gas Regional Initiative.
1 South Gas Regional Initiative Work Plan Raúl Yunta Huete, South GRI Chairman 20 th Madrid Forum Madrid, 26 September 2011.
Global Competitiveness in a Liberalised EU Energy Market Wim Groenendijk, Member of the Board Brussels, 22 November 2011 Gas infrastructure and Markets.
Paris, 18th May nd RCC Meeting South Gas Regional Initiative.
Paris, 16 th March th SG Meeting South Gas Regional Initiative.
Madrid, April 1 st th SG Meeting South Gas Regional Initiative Working Group 4B : Open Seasons.
PROPOSAL CAM PROPOSAL FOR HARMONISATION 14 th SG meeting Madrid 11 th July 2011.
Madrid, 7 th May th SG Meeting South Gas Regional Initiative.
CMP PROPOSAL FOR HARMONISATION 16 th IG meeting Madrid 6 th May 2011.
10 th SG meeting Madrid 13 th November Index Capacities – Results Capacities – Further steps Capacities – Further steps.
GRIP South South Region Gas Regional Investment Plans SGRI – 30 th April 2013.
25 th IG meeting 13 th December 2013 Enagás, REN and TIGF Issues to be discussed.
Madrid, 1 st April 2008 Proposal for the commercialisation of existing and committed capacity at the cross border point of Larrau between France and Spain.
Madrid, May 21 st th SG Meeting South Gas Regional Initiative Working Group 4B: Open Seasons.
27 th IG meeting 28 th March 2014 Enagás, GRTgaz, REN and TIGF.
Madrid 15 th June 2009 OS Agreement to Reserve Capacity 10 th IG meeting.
Capacity Allocation Mechanism Iberian overview 13 th SG meeting Madrid 7 th Feb 2011 DRAFT – Portugal / Spain.
1 15 th July 2015 Teleconference 32 nd IG Meeting South Gas Regional Initiative.
Madrid, 15th June rd SG Meeting South Gas Regional Initiative TSOs’ report 2013/2015 – Main Findings.
Madrid 24 th March 2009 OS Working Progress 9 th IG meeting.
1 CRE proposal on how to allocate capacity according to the Joint Enagas, TIGF and GRTgaz investment plans: points that have been agreed / still need to.
1 South Gas Regional Initiative 14 th Stakeholders Group meeting Madrid, 11 th July 2011.
Madrid 16 th February 2009 TSOs presentation 8 th IG meeting.
1 16 th February 2016 Videoconference 35 th IG Meeting South Gas Regional Initiative.
21 st SG meeting 19 th February 2014 Enagás, GRTgaz, REN and TIGF.
Madrid, 23rd Sep th SG Meeting South Gas Regional Initiative OSP and Interoperability.
29th November 2016 Teleconference
Enagás and REN Coordinated implementation of the Network Code on Capacity Allocation Mechanisms 15 November th SG meeting.
Enagás and TIGF Coordinated implementation of the Network Code on Capacity Allocation Mechanisms 15 November th SG meeting.
40th IG meeting 29th November 2016
Enagás, GRTgaz, Reganosa, REN and TIGF
20th April 2016 Teleconference
26th IG meeting 23th January 2014
4th October 2016 Teleconference
43th IG Meeting South Gas Regional Initiative
18th July 2016 Teleconference
37th IG Meeting South Gas Regional Initiative
20th April 2016 Teleconference
26th February 2015 Teleconference
41st IG meeting 24th January 2017
37th IG Meeting South Gas Regional Initiative
Enagás, GRTgaz, Reganosa, REN and TIGF
20th April 2016 Teleconference
29th April 2014 Teleconference
Enagás, GRTgaz, Reganosa, REN and TIGF
4th October 2016 Teleconference
18th July 2016 Teleconference
43th IG Meeting South Gas Regional Initiative
24rd SG meeting 8th february 2018
Enagás, GRTgaz, Reganosa, REN and TIGF
24th January 2017 Teleconference
40th IG meeting 29th November 2016
37th IG Meeting South Gas Regional Initiative
41st IG meeting 24th January 2017
39th IG meeting 4th October 2016
Enagás, GRTgaz, REN and TIGF
29th November 2016 Teleconference
26th February 2015 Teleconference
12th December 2014 Teleconference
39th IG meeting 4th October 2016
South Gas Retional Initiative
39th IG meeting 4th October 2016
Presentation transcript:

37 th IG meeting 31 st May 2016 Enagás, GRTgaz, Reganosa, REN and TIGF

III.Interoperability NC. Latest developments and next steps in the Region

3 Latest developments (i) The Interoperability Network Code came into force on 1 May 2016 Article 13 and Article 14. Harmonization of reference conditions. Enagás has submitted to CNMC the analysis of the implementation of this point by 24/04/2016. Article 16. Short term monitoring on gas quality ENAGAS: gas/Publicacion_de_Calidad_de_Gas_Horaria gas/Publicacion_de_Calidad_de_Gas_Horaria GRTgaz: &endDate= &range=daily &endDate= &range=daily REN: TIGF: Status of the implementation

4 Latest developments (ii) Article 17. Information provision on short-term gas quality variation Enagás submitted to CNMC the selection of the parties that receive information on gas quality variation by 25/04/2016. GRTgaz proposes a service called QUALiPgaz az_ pdf az_ pdf REN is evaluating the list of target parties and the corresponding level of IT developments needed to comply with this provision. TIGF is just finalizing the list of clients and adjacent operators to be informed. Chapter V: Data exchange The current data exchange between TSOs and between TSOs and Network users is compliant with what is established in Article 21: “Common data exchange solutions” Status of the implementation

5 Interconnection agreements. Status minimum mandatory content At this moment, Enagás & REN and Enagás & TIGF are working on two new documents for the Interconnection Agreements, which are subject to the provisions of EU Regulation 2015/703. Despite this, the minimum levels set in Interoperability, mostly, are being met in practice at the interconnection points between France & Spain and Spain & Portugal: Article 3 of the Regulation EU 2015/703 (NC INT): “Adjacent transmission system operators shall ensure that at least the following terms and conditions (…) are covered by an interconnection agreement in respect of each interconnection point: a) rules for flow control; b) measurement principles for gas quantities and quality; c) rules for the matching process; d) rules for the allocation of gas quantities; e) communication procedures in case of exceptional events; f) settlement of disputes arising from interconnection agreements; g) amendment process for the interconnection agreement.” Status of the implementation

6 Interconnection agreements. Status minimum mandatory content Interconnection Agreements for IPs between Francia and Spain Status of the implementation Currently Agreements: OPERATING MANUAL: INTERCONNECTION POINTS BETWEEN TIGF NETWORK AND SPANISH GAS SYSTEM. Final Version: 30/10/2010. Includes several Exhibits: Exhibit A: Electronic mail ( ) addresses and telephones numbers Exhibit B: Technical Assistance Joint Agreement in case of exceptional operating situations Exhibit C: Specifications of gas quality fixed by Spanish regulations Exhibit D: Specifications of gas quality fixed by TIGF OPERATING ADDENDUM 1. Final Version: 02/06/2014. Where there was introduced de VIP PIRINEOS interconnection point. MEASUREMENT PROTOCOL INTERCONNECTION POINT: I.P. FRANCE G02. Final Versión : 17/07/2015 These documents include the scopes in Article 3 of the EU Regulation 703/2015

7 Interconnection agreements. Status minimum mandatory content Interconnection Agreements for IPs between Portugal and Spain Status of the implementation Currently Agreements: OPERATING MANUAL: “GESTIÓN TÉCNICA CONJUNTA DE LAS CONEXIONES INTERNACIONALES IP 39 e IP 40” Final Version: 17/06/2009. OPERATING FIRST ADMENDMENT TO THE “GESTIÓN TÉCNICA CONJUNTA DE LAS CONEXIONES INTERNACIONALES IP 39 e IP 40” Final Version: 01/09/2011. Where there was introduced the VIP IBERICO interconnection point. TECHNICAL ASSISTANT AGREEMENT between REN and ENAGÁS in case of exceptional operating situations. Final Version: 30/06/2011. These documents include the scopes in Article 3 of the EU Regulation 703/2015

IV.Balancing NC. Status of the implementation

9 Latest developments The edited version of ENTSOG Monitoring Report on Implementation of BAL NC has been sent to General Assembly for approval and publication. This is the first monitoring report after the entrance into force of the BAL NC on 1 October At national level, On the Spanish side, implementation is still on going. It will be implemented by 1 October 2016 Currently, there are some documents under consultation: guarantees and the standard contract On the Portuguese side: REN is working on the development of the necessary rules and procedures to appear in the accompanying regulatory documents before 1 October 2016

VI.Proposals for the new SGRI Working Plan

11 SGRI Work Plan To be added Infrastructures: Follow up of South GRIP

VII. Infrastructures

13 TYNDP 2017: REN, 3 rd IP PT-ES

14 TYNDP 2017: Enagas, 3 rd IP

15 TYNDP 2017: Enagas, MidCat

16 TYNDP 2017: Enagas, Canary Islands – LNG Terminals

17 TYNDP 2017: GRTgaz TYNDP codeStatusProjectCommissioning TRA-F-391FIDGascogne-Midi : adaptation of stations in Cruzy and St Martin2018 TRA-F-43FIDVal de Saône project2018 TRA-F-45FIDReverse capacity from CH to FR at Oltingue2018 TRA-N-047Non-FIDReverse capacity from France to Germany at Obergailbach2022 TRA-N-256Non-FIDIberian-French corridor: Eastern Axis-Midcat Project*2024 TRA-N-258Non-FIDDevelopments for Montoir LNG terminal 2.5 bcm expansion2022 TRA-N-269Non-FIDDevelopments for Fosmax (Cavaou) LNG 8.25 bcm expansion2022 TRA-N-429Non-FIDAdaptation L- gas - H-gas (*): 230 GWh/d from Spain to France and 160 GWh/d from France to Spain (joint TIGF & GRTgaz project)

18 TYNDP 2017: TIGF TYNDP codeStatusProjectCommissioning TRA-F-331FIDGascogne Midi2018 TRA-F-251FIDArtère de l’Adour2015 TRA-N-252Non-FIDNew interconnection between France and Spain (First Step Midcat) 2022

19 TYNDP 2017: Reganosa Bilbao Barcelona Sagunto Cartagena Huelva Almería Tarifa Tui Irún Larrau Serralbo Marismas Gaviota Poseidón Mugardos Guitiriz-Zamora Yela Badajoz Third Tank (2023) Second Jetty (2021) Gas Pipeline Guitiriz-Zamora (2020) Additional Vaporizer (2024)

20 South GRIP Latest Developments Chapters of the South GRIP Introduction General Context Supply Infrastructure projects Assessment of the gas system Projects answering needs in the South Region Conclusion Legal Disclaimer Glossary Each TSO has taken the responsibility of the development of at least one chapter. Periodical TELCOs have been arranged every 2 weeks. Publication is expected by the end of 2016.

Thank you for your attention!