TPB TECHNICAL COMMITTEE MEETING September 6, 2013 District Department of Transportation Federal Railroad Administration.

Slides:



Advertisements
Similar presentations
1 ODOT 2035 Long Range Transportation Plan Public Meetings November 2-12, 2009.
Advertisements

Mid-Atlantic Rail Operations Study -- Benefit Assessment Presented by: Jack Lettiere, Commissioner New Jersey Department of Transportation Presented to:
OCBC Infrastructure Committee April 8, 2014 LOSSAN Rail Corridor Update Jennifer Bergener – Managing Director, LOSSAN JPA.
City of Ashland Transportation System Plan Update September 6 th, 2012.
I-95 Corridor Coalition December 14, 2001 I-95 Corridor Coalition Mid-Atlantic Rail Operations Study — An Integrated Strategy to Eliminate Choke Points.
Harrisburg Area Transportation Study Cross-river Connections Study Capital Area Cross-River Connections Study prepared for Harrisburg Area Transportation.
1 Integrating Freight into the 2010 Constrained Long-Range Transportation Plan (CLRP) Karin Foster Technical Committee Presentation November 7, 2008.
CSSC Regional Rail Partners, September 18, 2012 Chesapeake Connector : Freight and Passenger Rail Benefits Study.
Passenger Rail Development Activities AASHTO Annual Meeting October 18, 2013 Serge Phillips, MnDOT Federal Relations Manager.
1 Item 9: (DRAFT) Briefing on the Draft Update of the Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell DTP Presentation to the.
2040 Metropolitan Transportation Plan Final Approval GVMC Board May 7, 2015.
1 Salt Lake City Gateway Area Railroad Consolidation Project Grant G. Schultz, Ph.D., P.E., PTOE Assistant Professor Brigham Young University CE En 361.
California Passenger Rail Summit April 29, 2015 LOSSAN Pacific Surfliner Rail Service Update.
A National County-Level Long Distance Travel Model Mike Chaney, AICP Tian Huang, PE, AICP, PTOE Binbin Chen, AICP 15 th TRB National Transportation Planning.
VIRGINIA RAILWAY EXPRESS SYSTEM PLAN 2040
Title Slide California High Speed Rail Authority Board Meeting September 28, 2005.
California State Rail Plan Overview Presentation Tribal Informational Meeting – March 1,
Transportation System Performance Measurement. MDOT’s First Transportation System Performance Report  Next Generation Road & Bridge Goals  Other Aspects.
Anaheim Regional Transportation Intermodal Center Project Update.
River to Sea TPO CAC A Presentation to: May 19, 2015.
Program Update Baltimore MPO November 25, Internal Draft AGENDA  Program Overview  Alternatives Development  Stakeholder and Public Outreach.
2030 Long-Range Transportation Plan Ithaca-Tompkins County Transportation Council Public MeetingFernando de Aragón TCPL October 15, 2008Staff Director.
Improving Your World. RS&H tradition began in 1941 Employee-owned company Six programs of client-focused services Multi-disciplined team of planners,
April 29,  Investment in new and improved services, with a strong focus on customer experience  Investment focused on improving efficiency  Shorter.
Freight Bottleneck Study Update to the Intermodal, Freight, and Safety Subcommittee of the Regional Transportation Council September 12, 2002 North Central.
Northern Lights Express High Speed Rail: MN APA Conference September 2011.
“High Speed Rail Implementation - An Update on Passenger Rail Planning Activities in Minnesota.” presented by: Minnesota Department of Transportation March.
1 Item 11: Review of Draft Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell TPB Staff Presentation to the Transportation Planning.
Passenger Rail Planning Activities in Minnesota presented by: Minnesota Department of Transportation March 15, 2011.
Multimodal Corridor System Management – Incorporating Analysis of Transit, Demand Management Programs and Operational Strategies Presented by Bill Loudon,
1 Presented by Tom Harrington WMATA Office of Long-Range Planning TPB Technical Committee June 6, 2008 Future Metrorail Capacity Needs.
May 30, 2008 Community Integration Commission 1 DRPT Initiatives on Transportation Services For Older Adults, People With Disabilities.
1 IntelliDrive SM Research, Development and Emerging Technologies National ITS Perspective Panel Joseph I. Peters, Ph.D. Federal Highway Administration.
Regional Priority Bus Transit Conference June 24, 2009.
Tom Norton, Executive Director Colorado Department of Transportation American Association of State Highway and Transportation Officials September 9, 2003.
Regional Transit Study Project Update. Four open houses held between November , 2009 Informed and engaged the public in the study process Provided.
Draft 2008 Congestion Management Process (CMP) Technical Report Andrew J. Meese COG/TPB Staff TPB Technical Committee June 6, 2008 Item # 8.
Lakes Region Transportation Workshop November 15, 2013.
What is a TSP? Provides City with guidance for operating and improving a multimodal transportation system Focuses on priority projects, policies, and programs.
What is a TSP? Provides City with guidance for operating and improving a multimodal transportation system Focuses on priority projects, policies, and programs.
Overview Presentation Fall 2015 Gainesville-Haymarket Extension Study.
1 Briefing on the Congestion Management Process (CMP) Andrew J. Meese, AICP Melanie Wellman COG/TPB Staff Travel Management Subcommittee November 27, 2007.
The Regional Mobility and Accessibility Study Initial Results of CLRP/CLRP+ Analysis with Round 6.4 Growth Forecasts and Five Alternative Land Use Scenarios.
I-66 Corridor Improvements Morteza Farajian Interstate 66 Corridor Improvements From US Route 15 in Prince William County To Interstate 495 in Fairfax.
1 Briefing on Draft Congestion Management Process Elements for the 2007 CLRP Andrew J. Meese, AICP Melanie Wellman COG/TPB Staff TPB Technical Committee.
Minnesota State Planning Conference September 28, 2011.
PRESENTED TO: CTP 2040 TECHNICAL ADVISORY COMMITTEE PRESENTED BY: RON WEST, CAMBRIDGE SYSTEMATICS CTP 2040 Scenario Strategies and Analysis Framework October.
1 Briefing on the TPB Transportation Planning Process Certification Summary Report Sandra Jackson Federal Highway Administration Transportation Planning.
Virginia Department of Rail and Public Transportation Amy Inman Planning and Mobility Programs Administrator Department of Rail and Public Transportation.
2040 LONG RANGE PLAN UPDATE Congestion Management Process Plan (CMPP) Major Update February 24, 2016.
Virginia Rail Program Update Virginia-North Carolina High Speed Rail Compact Commission Meeting March 21, 2016 Jennifer Mitchell Agency Director.
AASHTO Overview. WHAT IS AASHTO?  American Association of State Highway and Transportation Officials  A nonprofit association founded in 1914  Members.
Los Angeles – San Diego – San Luis Obispo Rail Corridor Update
Local Government Roundtable Session Arlington, Virginia
Major Projects in Development
ITS VA Conference Amy Inman Planning & Mobility Programs Administrator
Project Overview Multimodal improvements to 22.5 miles of I-66
The TPB’s Draft Participation Plan
September 2011 Public Open Houses
Passenger Train Classification
San Mateo Countywide Transportation Plan update
DRPT Overview Jennifer Mitchell Agency Director
AASHTO Rail Resource Center Webinar Series
Ohio Rail Development Commission November 15, 2017 Meeting
September 2011 Public Open Houses
Idaho Freight Rail – Covered by Freight Program Manager
Coordinating And Prioritizing Multimodal Transportation Projects
White Flint North Entrance Feasibility Study
I Street Bridge Replacement Project
Presentation transcript:

TPB TECHNICAL COMMITTEE MEETING September 6, 2013 District Department of Transportation Federal Railroad Administration

AGENDA Overview Status Update Alternatives Schedule & Next Steps

STUDY AREA 2

LONG BRIDGE OVERVIEW DDOT received an ARRA grant from the Federal Railroad Administration to analyze: the structural integrity of the Long Bridge multi-modal connectivity and opportunities for operational improvements the long-term multi-modal capacity improvements (to include the future opportunity for high-speed and intercity passenger rail, commuter rail, transit, bike and pedestrian, auto, and freight) 2 track railroad bridge crossing the Potomac River Owned by CSX CSX, Amtrak, and Virginia Railway Express (VRE) operate on the bridge 3

ANALYSIS MODES Rail Freight Rail Passenger Amtrak/HSR VRE Marc Vehicular Streetcar Metrorail Pedestrian / Bicycle Source: Mike Schaller, VRE

NTP Site Visit with Interagency Partners Public Meeting #1 (November 13, 2012) Bridge Workshop Alternatives Development Public Meeting #2 (June 6, 2013) Alternatives Selection for Analysis PROJECT STATUS 5

-No Build (1) -Railroad track expansion + ped/bike (2) -Railroad track expansion + streetcar + ped/bike (3) -Railroad track expansion + shared lanes for streetcar and vehicular + ped/bike (4) -Railroad track expansion + shared lanes for streetcar and vehicular + vehicular + ped/bike (5) -Four track tunnel (6) ALTERNATIVES 6

ALTERNATIVE 1 7

ALTERNATIVE 2 8

ALTERNATIVE 3 9

ALTERNATIVE 4 10

ALTERNATIVE 5 11

ALTERNATIVE 6 12

Demand and Operations Analysis – Summer/Fall 2013 Concept Engineering – Fall 2013 Finalize Report – Fall/Winter 2013 _____________________________________________________________ Next meetings: Fall 2013: Freight Subcommittee Meeting Interagency Meeting Public Meeting #3 SCHEDULE & NEXT STEPS 13

QUESTIONS