Faculty of Physics, University of Belgrade Collaboration meeting, Zagreb, 10 th of October, 2011. Remote control and monitoring of ToF-L/R detector Jovan.

Slides:



Advertisements
Similar presentations
HV-LV DCS Workshop – 16/03/2004 G. De Cataldo, A. Franco, A.Tauro - INFN Bari Progress report on the HMPID LV System Cabling and LV sectorsCabling and.
Advertisements

Ignore errors in this “Server” window Is there a popup window about a memory error? If so, restart monitoring Can you see in this window the program running.
HV Report F.Cavallari (INFN Roma). High Voltage set-up in M0’ 2 channels each driving 50 crystals (100 APDs) 1 Crate hosting 1 board (final system). 1.
MICE CM15 June 2006Jean-Sébastien GraulichSlide 1 DAQ Status o Detector DAQ Test bench in Geneva o Preparing for Test Beam o FE electronics tests o Detector.
MICE CM Berkeley 9-12 Feb February 2005 Edda Gschwendtner 1 Control/Monitoring and DAQ for PIDs Edda Gschwendtner.
Y. Karadzhov MICE Video Conference Thu April 9 Slide 1 Absolute Time Calibration Method General description of the TOF DAQ setup For the TOF Data Acquisition.
8/11/2006 FPIX TB meeting L. Perera 1 Pixel Power Supply Response Measurement Lalith Perera - Univ. of Iowa Carlos Florez, Simon Kwan, Charles Newsom,
Faculty of Physics, University of Belgrade General meeting 3 rd of June, ToF-L/R Performance Marjan Ćirković, Faculty of Physics, Belgrade.
Monitoring systems COMET types MS55 & MS6 MS55/MS6 Configuration.
X.Dong, USTC/LBNL Feb. 20th, 04, STAR Collaboration Meeting 1 TOF Software Progress Xin Dong, for TOF Group  TOF detectors in Run IV  Online software.
MICE CM25 Nov 2009Jean-Sebastien GraulichSlide 1 Online Summary o Detector DAQ o Controls And Monitoring o Online Data Base o Bottom Lines Jean-Sebastien.
MICE CM26 March '10Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM25 o DAQ System Upgrade o Luminosity Monitors o Sequels of.
FG Wilson Access 4000 Control Panel
1 TOF Aging Discussion Background information Summary of results so far Examples of gain loss mechanisms Diagnostics Possible scenarios for 2006 Discussion.
SMACS Slow Monitor And Control System Developed system for CDF-TOF proposed for Atlas-MDT/RPC.
CAEN November 15, 2002 Vandelli W. 1 Test Conditions Prototype fed by CAEN Module 2527 through 100 m long cables From channels status page on generator.
Gauge Operation and Software by Scott A. Ager. Computer Recommendations 750 MHz Pentium III 64 Meg SRAM 40 Gig Hard Drive 1024 x 768 graphics CD Writer.
LV and HV status of the RPC system RPC detector and trigger group.
20/10/2008A. Alici - ALICE TOF Festival1 Electronics and data acquisition of the ALICE TOF detector A.Alici University and INFN, Bologna.
Low Voltage LB status RPC detector and trigger group.
LKr Calorimeter Control and monitoring R. Fantechi 19/02/2010 R. Fantechi.
K.C.RAVINDRAN,GRAPES-3 EXPERIMENT,OOTY 1 Development of fast electronics for the GRAPES-3 experiment at Ooty K.C. RAVINDRAN On Behalf of GRAPES-3 Collaboration.
DAQ MICO Report Online Monitoring: –Status All histograms are now implemented Still not fully online –Only monitoring from data file (slightly offline,
MICE CM25 Nov 2009Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM24 o Trigger o Event Building o Online Software o Front End.
MICE CM16 Oct 2006Jean-Sébastien GraulichSlide 1 Detector DAQ Status o Since CM15 o Detector DAQ software o Interface DDAQ / Mice Control & Monitoring.
André Augustinus 10 September 2001 DCS Architecture Issues Food for thoughts and discussion.
Faculty of Physics, University of Belgrade General meeting 19 th of August, ToF-LR HV Upgrade Jovan Puzović, Faculty of Physics, Belgrade.
Remapping of 48V generators in US15 – Load Balancing Much better balanced load between chan A and chan B outputs More even load between generators, avoiding.
Maintaining and Updating Windows Server Monitoring Windows Server It is important to monitor your Server system to make sure it is running smoothly.
Giovanni Polese1 RPC Detector Control System for MTCC Pierluigi Paolucci, Anna Cimmino I.N.F.N. of Naples Giovanni Polese Lappeenranta University.
News on GEM Readout with the SRS, DATE & AMORE
June 7, 2004Karen Dow CODA at Bates BLAST Data Acquisition.
GIF++ Control System (GCS) Gilles MAIRE PH-DT-DI1.
Fifth CMS Electronics Week EASY: a new SY1527-based Embedded Assembly SYstem May 7th, 2003 CAEN SpA.
Design of High Voltage System Kyungju Ma & Reno Collaboratiors
1 User guide for Muon shifter part 2 : control of LV, HV, TELL1 Preliminary version 9-July-08 (to be checked by Michela) I have simply put together the.
DCS Workshop, CERN MARCH ACORDE (Alice Cosmic ray detector) 60 scintillator modules (120 HV channels) Each module will have two scintillator counters.
P. Paolucci - I.N.F.N. of Napoli 1 RPC workshop, 2 march 07 RPC Power system P. Paolucci, G. Polese and D. Lomidze I.N.F.N. di Napoli.
GAN: remote operation of accelerator diagnosis systems Matthias Werner, DESY MDI.
24/03/2010ALICE TOF General Meeting March TOF hardware and data taking 2010 Andrea Alici Museo Storico della Fisica e Centro Studi e Ricerche “Enrico.
October Test Beam DAQ. Framework sketch Only DAQs subprograms works during spills Each subprogram produces an output each spill Each dependant subprogram.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
Online Consumers produce histograms (from a limited sample of events) which provide information about the status of the different sub-detectors. The DQM.
FPD SOFTWARE TEST MOTIONS / CONNECTIONS / CONFIGURATION / SOFTWARE / TESTS / CONCLUSION Lionel Peyrichoux 14 March 2001.
19/10/11FV 1 Behavior of generic HV channel. Mail’s survey: appeal for general policy VF2 19/10/11 Patrizia: “Based on the running experience of NA48,
Helen Heath, Magnus Loutit.  Useful meetings at CERN before Easter ◦ ML and HH met with John Fullerton from BE for practical advice on the CEDAR motor.
E Ethernet C CAN bus P Profibus HV HV cables LV LV cables (+busbar) S Serial (RS232) Signal cable Other/Unknown Liquid or Gas Cable and/or Bus PCI-XYZ.
Piquet report Pascal, Yuri, Valentin, Tengiz, Miriam Calorimeter meeting 16 March 2011.
Faculty of Physics, University of Belgrade General meeting, 19 th of May, Pixel/Connectors Checking Jovan Puzović, Faculty of Physics, Belgrade.
Faculty of Physics, University of Belgrade General meeting, Wroclaw 28 th of January, ToF-L/R HV Upgrade, Status and Plans Jovan Puzović, Faculty.
E.Guschin (INR,Moscow) 26 February 2008PS/SPD commissioning meeting CERN PS/SPD LED monitoring system status Tuning of SPD ‘C’ side: We concentrated our.
Faculty of Physics, University of Belgrade Collaboration meeting, Budapest 15 th of May, ToF-L/R detector HV upgrade Jovan Puzović, Faculty of Physics,
Faculty of Physics, University of Belgrade Collaboration board meeting 31 th of January, ToF-L/R detector HV upgrade Jovan Puzović, Faculty of Physics,
Faculty of Physics, University of Belgrade Collaboration meeting CERN, 24 th of September 2015 ToF-LR status and future Jovan Puzović, Faculty of Physics,
High Voltage Power Supply for RPC Suvendu Nath Bose, Satyajit Saha, Sudeb Bhattacharya, Saha Institute of Nuclear Physics, Kolkata,, Description Presently.
Faculty of Physics, University of Belgrade Collaboration meeting, Dubna 8 th of April, ToF-LR Upgrade Jovan Puzović, Faculty of Physics, Belgrade.
Monitoring systems COMET types MS55 & MS6
Scintillator testing in Prague (update from Aussois)
Jean-Sebastien Graulich, Geneva
ATLAS MDT HV – LV Detector Control System (DCS)
F.Guber, A.Ivashkin INR, Moscow
Report on radiation test done in Casaccia on January 11, 2006
23 Barrel chambers and 12 Endcap chambers
HV Imon in 1th MTCC period
RPC Detector Control System
RPC Detector Control System
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
23 Barrel chambers and 12 Endcap chambers
Pierluigi Paolucci & Giovanni Polese
Presentation transcript:

Faculty of Physics, University of Belgrade Collaboration meeting, Zagreb, 10 th of October, Remote control and monitoring of ToF-L/R detector Jovan Puzović, Faculty of Physics, Belgrade

Faculty of Physics, University of Belgrade Collaboration meeting, Zagreb, Page 2 out of 24 Jovan Puzović, Belgrade SHINE team Time of Flight L/R detector

Faculty of Physics, University of Belgrade Collaboration meeting, Zagreb, Page 3 out of 24 Jovan Puzović, Belgrade SHINE team 2*891 scintillators & PMT (3.4 x 2.3 x 6,7,8)cm 3 HV System Trigger System Start Counter Signal Read Out Discriminators, TDCs, QDCs Control while data taking Calibration and TOF client

Faculty of Physics, University of Belgrade Collaboration meeting, Zagreb, Page 4 out of 24 Jovan Puzović, Belgrade SHINE team Principles of operation Start signal from S1 Stop signal from scintillator

Faculty of Physics, University of Belgrade Collaboration meeting, Zagreb, Page 5 out of 24 Jovan Puzović, Belgrade SHINE team Current system topology Caen 5Caen 1Caen 5Caen 1

Faculty of Physics, University of Belgrade Collaboration meeting, Zagreb, Page 6 out of 24 Jovan Puzović, Belgrade SHINE team SY527 Main menu C.A.E.N. SY527 V3.17 Crate 01 M A I N M E N U Display Display/Modify channels Protections Set/Reset password Crate Connect a new crate Map Crate map Kill Kill all channels Alarms Reset alarms Status Select type of alarm Format Reformat EEPROM Quit Abandon program Select item

Faculty of Physics, University of Belgrade Collaboration meeting, Zagreb, Page 7 out of 24 Jovan Puzović, Belgrade SHINE team SY527 Data display C.A.E.N. SY527 V3.04 A753 GROUP00 Ch_En is: On V0-SEL I0-SEL Crate 05 Page 1 * Channel HVmax Vmon Imon V0set I0set Pw Status Ch# CHANNEL mA mA On 3.07 CHANNEL mA mA On 3.08 CHANNEL mA mA On 5.00 CHANNEL mA mA On 5.01 CHANNEL mA mA On 5.02 CHANNEL mA mA On 5.03 CHANNEL mA mA On 5.04 CHANNEL mA mA On 5.05 CHANNEL mA mA On 5.06 CHANNEL mA mA On 5.07 CHANNEL mA mA On 5.08 CHANNEL mA mA On 7.00 CHANNEL mA mA On 7.01 CHANNEL mA mA On 7.02 CHANNEL mA mA On 7.03 CHANNEL mA mA On 7.04 Quit Change Update Next Prev More Switch V/Isel

Faculty of Physics, University of Belgrade Collaboration meeting, Zagreb, Page 8 out of 24 Jovan Puzović, Belgrade SHINE team TOF-L/R in 2010 run

Faculty of Physics, University of Belgrade Collaboration meeting, Zagreb, Page 9 out of 24 Jovan Puzović, Belgrade SHINE team 2010 Run summary

Faculty of Physics, University of Belgrade Collaboration meeting, Zagreb, Page 10 out of 24 Jovan Puzović, Belgrade SHINE team Current system topology Caen 5Caen 1Caen 5Caen 1

Faculty of Physics, University of Belgrade Collaboration meeting, Zagreb, Page 11 out of 24 Jovan Puzović, Belgrade SHINE team Planned system topology

Faculty of Physics, University of Belgrade Collaboration meeting, Zagreb, Page 12 out of 24 Jovan Puzović, Belgrade SHINE team Objectives 1)Improve connection reliability with crates in the pit 2) Enable remote monitoring of HV parameters 3) Enable remote control of HV parameters 4) Enable possibility for HV status logging 5) Allow possibility to send warnings to expert in case of malfunction

Faculty of Physics, University of Belgrade Collaboration meeting, Zagreb, Page 13 out of 24 Jovan Puzović, Belgrade SHINE team RS232 mux candidates Price ~400USD Have to be order from US Remote Access Terminal Server Price: 840EUR !!! Distrelec Price: 420 CHF at Distrelec Deliver time: ? Techmania – stack empty Tech Mania 35CHF Topd 65CHF

Faculty of Physics, University of Belgrade Collaboration meeting, Zagreb, Page 14 out of 24 Jovan Puzović, Belgrade SHINE team DELOCK OHC computers, Topd ~ 90CHF Not as elegant as Terminal Servers, but cheap!

Faculty of Physics, University of Belgrade Collaboration meeting, Zagreb, Page 15 out of 24 Jovan Puzović, Belgrade SHINE team Hardware

Faculty of Physics, University of Belgrade Collaboration meeting, Zagreb, Page 16 out of 24 Jovan Puzović, Belgrade SHINE team Aging problem Communication problem persist with TOF-R crate 4! Problems are typical aging problem (bad contact between connectors, chips and sockets etc…) Decide to open Crate 4 in very bad working conditions Communication restored, but we lose 2 HV distributors!

Faculty of Physics, University of Belgrade Collaboration meeting, Zagreb, Page 17 out of 24 Jovan Puzović, Belgrade SHINE team QDC distribution - before

Faculty of Physics, University of Belgrade Collaboration meeting, Zagreb, Page 18 out of 24 Jovan Puzović, Belgrade SHINE team QDC distribution - after

Faculty of Physics, University of Belgrade Collaboration meeting, Zagreb, Page 19 out of 24 Jovan Puzović, Belgrade SHINE team TDC – single bad pixel

Faculty of Physics, University of Belgrade Collaboration meeting, Zagreb, Page 20 out of 24 Jovan Puzović, Belgrade SHINE team TDC – multi bad pixel

Faculty of Physics, University of Belgrade Collaboration meeting, Zagreb, Page 21 out of 24 Jovan Puzović, Belgrade SHINE team ToF-R bad pixels Pixel Before After Gen Crate Dist Chan ÷ ÷ ÷ ÷ ÷70÷ ÷ ÷10÷ ÷ Before: 34 bad pixel (random) After: 30 (random) Before: 34 bad pixel (random) After: 30 (random) Before: 34 bad pixel (random) After: 30 (random) Before: 34 single bad pixel (random) After: 30 single bad pixel (random)

Faculty of Physics, University of Belgrade Collaboration meeting, Zagreb, Page 22 out of 24 Jovan Puzović, Belgrade SHINE team ToF-R bad pixels Pixel Before After Gen Crate Dist Chan ÷ ÷ ÷ ÷ ÷70÷ ÷10 Additional 59 bad pixel (4 already in random!) Crate 4, distributors 3 and 6 – 37 new bad pixel Crate 1, distributor 5 – 22 new bad pixel (HV Off!)

Faculty of Physics, University of Belgrade Collaboration meeting, Zagreb, Page 23 out of 24 Jovan Puzović, Belgrade SHINE team Summary At the end of 2011 proton run ToF-L : 87 (bad pixel) (9.7%) + 17 (suspicious)(1.9%) (11.6%) Before intervention: ToF-R: 34 (random bad pixel) After intervention: ToF-R: 30 (random bad pixel) + 37 (due to the intervention, Crate 4) + 22 (unknown reason, Crate 1) (10.0%)

Faculty of Physics, University of Belgrade Collaboration meeting, Zagreb, Page 24 out of 24 Jovan Puzović, Belgrade SHINE team Conclusion Control and monitoring hardware upgrade successful! For ION run, remote control, monitoring and data logging of HV status will be possible Problems: urgently needs for spare parts for CAEN HV system, TDC and QDC Without spare parts, the future will not be bright for ToF-LR!

Faculty of Physics, University of Belgrade Collaboration meeting, Zagreb, Page 25 out of 24 Jovan Puzović, Belgrade SHINE team THE END

Faculty of Physics, University of Belgrade Collaboration meeting, Zagreb, Page 26 out of 24 Jovan Puzović, Belgrade SHINE team TOF-L TDC sample

Faculty of Physics, University of Belgrade Collaboration meeting, Zagreb, Page 27 out of 24 Jovan Puzović, Belgrade SHINE team TOF-L bad pixels -87 bad pixels (count 0 in TDC) 1, 3, 14, 42, 54, 61, 63, 64, 102, 129, 133, 137, 138, 142, 154, 156, 157, 160, 163, 179, 194, 199, 216, 221, 226, 243, 250, 253, 287, 318, 320, 329, 353, 358, 379, 380, 390, 410, 411, 413, 453, 460, 469, 480, 501, 506, 529, 530, 545, 564, 570, 588, 595, 599, 627, 635, 639, 653, 660, 662, 663, 670, 681, 683, 711, 743, 748, 757, 766, 767, 771, 773, 774, 783, 787, 790, 793, 800, 805, 819, 824, 840, 861, 868, 878, 879, suspicious pixels (count 1 in TDC) 85, 140, 169, 376, 395, 424, 451, 549, 633, 634, 660, 720, 736, 779, 784, 819, 889