Fuel Pump Manufacturers Council February 21, 2007.

Slides:



Advertisements
Similar presentations
Introducing MyWave Portal. MyWave Portal Access time-saving tools and resources Build convenience into managing your everyday work tasks Collaborate with.
Advertisements

Enhancements to Penns Travel Program Launch of the New Travel Web Site Susan Storb Travel Administrator.
Ninth Lecture Hour 8:30 – 9:20 pm, Thursday, September 13
Hal Janke. ‘The Best Way to Predict the Future is to Create It’ Hal Janke, Pres., Certified Business Intermediary, specialist in selling automotive businesses.
Sixth Annual Meeting March 12, :00am to 4:00pm Crowne Plaza National Airport Arlington, VA INTERMACS Annual Meeting March 2012.
A sample Service Oriented Architecture for Integrating Government Lines of Business.
Design II Due today: Homework #3 Next Class: Pressman 14; User Manual Questions? / Quiz Review Team Status Reports Designing for the Web (WebE) cont. Bio.
Michael Hogan Jon McHale.  Problem Statement ◦ Develop a handheld device, that with minimal specialized training, can be used to quickly record EEG signals.
Video Marketing Overview Presented to Software Council of Southern California.
Ford Motor Company Deidre Hoefner Tanweer Akhtar Manish K Lal Aug
Enabling Success Through Better Supply Chain Design.
Fuel Pump Manufacturers Council – March 19, 2009 March 19, 2009 InterContinental O’Hare Rosemont, Illinois.
AMT Member Experiences in China Dukane Kinefac Bodine Market Update Breakfast – China September 8, 2006.
MRC VIEWABLE IMPRESSION RECONCILIATION PROCESS: PHASE 3 RESULTS AND MOVING FORWARD Presented to IAB 3MS Educational Forum July 8, 2015.
Non-Functional Testing Standards Workshop EuroSTAR 2001 Stockholm – Sweden Graham Thomas Wall Street Systems.
© Experian Information Solutions, Inc All rights reserved. Experian and the marks used herein are service marks or registered trademarks of Experian.
‘Monitoring Solutions for 2001’ Rome, Italy Wednesday 31 st January, 2001.
Marketing Executives Council February 20, Marketing Executives Council February 20, 2007 MEC Mission Statement To advance the automotive aftermarket.
Warranty Working Group Update. Warranty Working Group's Mission Review both new and existing technologies and business processes to develop a warranty.
Published Date: May 2013 Global and China Machine Tool Industry 2013 Deep Research Report Price: Single User: US $ 3200 Corporate User: US $ 6600 No. of.
1 Title Slide. 2 A New 21 st Century Tool – Your Local Perkins Plan Lorrie Toni, Perkins Director Laurie Urich, Business.
Fuel Pump Manufacturers Council December 12 & 13, 2007.
OSEHRA Interoperability Work Group (OSEHRA IWG) February 18, 2014 Mario G. Hyland Chair and Senior Vice President AEGIS.net,
CONFIDENTIAL ©2014 PAREXEL INTERNATIONAL CORP. ALL RIGHTS RESERVED. THE PRACTICE OF REGULATORY INTELLIGENCE: CASE STUDIES OMICS 5 th International Pharmaceutical.
Fuel Pump Manufacturers Council – July 7, 2009 July 7, 2009 Conference Call.
Fuel Pump Manufacturers Council – December 2, 2008 AASA Fuel Pump Manufacturers Council December 2, 2008 GM SPO Grand Blanc, Mich.
Marketing Executives Council October 4, © 2005 Motor & Equipment Manufacturers Association Agenda 10:00amWelcome and Introductions 10:15amAASA Strategic.
Welcome to the STEM Careers Orientation (SCO) Facilitated by Amy R. Mosher, Strategy and Innovation Leader Workforce Central Career Center Worcester.
Construction Commitments: Halving Waste to Landfill Breakfast Briefings October - November 2008.
Fuel Pump Returns: Do We Have a Problem? October 19, 2005 Romulus Marriott Romulus, Michigan.
RTF Staff, Subcommittee and Work Updates October 4, 2011.
Emerging Technologies Presented by Mark Rehley, Emerging Technology Operations Manager Northwest Energy Efficiency Alliance.
2004 EMS Users Conference St. Louis, Missouri EMS Users Conference History Our Mission Philosophy Structure Introduce the people who worked on this year’s.
Marketing Executives Council November 5, Marketing Executives Council 2 August 13, 2009 Changing of the Guard THANK YOU to Brian Altenberger for.
1 New Product Introduction: Life Cycle Phases Team Members: Our names date Solar Plus.
API Recommended Practice 17X Recommended Practice for Design, Installation, and Maintenance of Subsea Booster Pump Systems Status Report October 3,
1 Managing New Product Introduction: Life Cycle Phases Team Members: Jhon Benavides Sabrina Patino Russ Watt June 5, 2009 Solar Plus.
Supplier Image A component of AASA’s mission is to promote and enhance supplier image Marketing Executives Council formed in 2006 with this as the primary.
How: Overview of Action Plan and Data Utilization Shane McNeill, Director Office of Healthy Schools.
Introducing Visual Studio 2010: What It Is and Why You Should Care
1 Smart Metering Foundation Stage February Agenda File Format Changes for Effective Switching Back Population Approach for Effective Switching.
Transportation, Technology, Infrastructure Committee February 2016 HOUSTON IT SERVICES (HITS) TINA CARKHUFF, INTERIM DIRECTOR/CIO.
Copyright © Rajit Gadh 1 Manufacturing Processes by Rajit Gadh.
Improve Your Workforce Quality & ProductivityNARMScertifyU Proprietary Content Today’s NARMS Webinar is Made Possible by:
Standard Design Process Overview
Achieving Excellence Together. Agenda 1. EADT project 2. Update information: Identifying and sharing effective practice Headteacher CD of key materials.
LADA Information Systems 1 st Generation.html based, structure and content static Structural changes Content update Workflow: Originator – Programmer –
Touch Based Human Machine Interface (HMI) Market by Touch Screen Type (Resistive, Capacitive) by Components (MCU, PMIC, Sensors) by Product Type (PLC,
Introduction to BEAst February BEAst mission ”To develop standards and services for electronic information exchange enabling efficient and sustainable.
Long-Term Planning Presented by: APP Site Visit Don Untch
Productive Marketing with Content Management
GALLERIA DIAMOND JSWT AGENDA
NDMC NASA –JPL Project Activities Update: Objectives and Deliverables
OHT Project 10/2009 Supply Chain Tooling Content Pressures Added
1888 Press Release - InterTrade Industries to Showcase Advanced Medical Packaging and Enclosures at MD&M West
© 2016 Global Market Insights, Inc. USA. All Rights Reserved Digital Signage Media Player Market to surpass $1.4bn by 2024: Global Market.
Education & Workforce Development
Kick-off Meeting Agenda
Unified Invoice Processing System (UIPS) At-A-Glance
ESB Networks Market Release Meeting of the IGG, 1st October 2009
Undulator Assembly Procedure
Program Review Presentation April 29th, 2015
Technology Showcase Pitch
Developing Web Specifications
Iowa Statewide Assessment of Student Progress
Represented By:. “Provides Professional Services in Power Supply & Air Conditioning Business” PRESENT AGENDA.
2017 Executive Council Report for Executive Secretary
Region Leaders Training May 8, 2019
Presentation transcript:

Fuel Pump Manufacturers Council February 21, 2007

Marketing Executives Council February 20, 2007 Today’s Agenda (Morning) 10 :00 amWelcome and Introductions Review of Anti-trust guidelines 10:15 amInterview and Council Discussion with Babcox - Guests: Jon Owens and Larry Carley 11:45 amBreak 12:00 pmLunch at Benchmark Restaurant

Marketing Executives Council February 20, 2007 Today’s Agenda (Afternoon) 12:30 pmFederal-Mogul Fuel Pump Tester Demonstration - Guest: Mark Baker 2:00 pmLincoln Industrial Tester Update 2:15 pmReview and Discussion of Open Action Items - Discussion of Web Site design and content - Discussion of ASE Specialty Test - Mission Statement 3:00 pmNext Steps 4:00 pmAdjourn

Marketing Executives Council February 20, 2007 Fuel Industry Discussion Facilitated by: Jon Owens and Larry Carley, Babcox

Marketing Executives Council February 20, 2007 Federal-Mogul Fuel Pump Tester Demonstration Facilitated by: Mark Baker, Federal-Mogul

Marketing Executives Council February 20, 2007 Lincoln Industrial Tester Update Utilizing reliable vendor in Taiwan  Main connection and assembly  Flow tube and float will come from initial US supplier  First samples with this tooling due mid-March Prototype is being tested at Federal-Mogul Tech Center Ten field test units in shops around St. Louis Demonstrated Tester at Airtex

Marketing Executives Council February 20, 2007 Lincoln Industrial Tester Update E85 fuel compatibility  Moving forward with non-E85 compatible model  Plan to introduce a compatible model at a later date In discussions with David Gilbert of University of Southern Illinois-Carbondale  Write user manual Fuel pump output performance data  Federal-Mogul and Airtex will be supplying data on a confidential basis No progress on a bench-style tester August launch to general WD market

Marketing Executives Council February 20, 2007 Review of Open Action Items Discussion on Web site design and content Discussion on ASE specialty test Mission Statement

Marketing Executives Council February 20, 2007 Mission Statement Provide professional technicians and DIY installers with the resources, tools and information to more effectively diagnose and service automotive fuel systems.