SPL Intercavity support Conceptual design review 04/11/ A. Vande Craen TE/MSC-CMI.
ATD Assembly. ATD Assembly #1 Dewar Assembly #1 Status: Dewar has been completely assembled and vacuum tested. No vacuum leaks were detected on the outer.
3 rd Harmonic He Vessel Welding Helium Vessel-to-Cavity No June 2008.
1.  Preparation of larger parts in a Clean room Class (ISO7)  Preparation of smaller parts in a “baldaquin” annex  Assembly in a clean-room Class.
Elvin Harms, Tom Peterson, Yuriy Orlov, Frank McConoloque.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Lab MICE CM26 at Riverside California March 26, 2010.
FNAL-SCRF 会議報告 1. Cryomodule, Plug-compatible Interface ( 大 内) 2. High Pressure Code, 5K Shield (Tom Peterson)
Alignment and assembling of the cryomodule Yun He, James Sears, Matthias Liepe MLC external review October 03, 2012.
Ofelia Capatina on behalf of the CERN specification team
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
ESS cavities interfaces
V.Parma, CERN, TE-MSC On bahalf of the Cryomodule development team
MQXF Cold-mass Assembly and Cryostating H. Prin, D. Duarte Ramos, P. Ferracin, P. Fessia 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014.
KEKB Crab Development K. Hosoyama (KEK) Crab Cavity for HER Crab Cavity for LER Crab Cavity for KEKB History of Crab Cavity R&D Characteristics of Crab.
Blade Tuner assembly Instruction for tuner assembly on a cryomodule May
SCU Segmented Cryostat Concept M. Leitner, S. Prestemon, D. Arbelaez, S. Myers September 2 nd, 2014.
FNAL Cavities for S1 Global Jim Kerby ALCPG 09. FNAL Deliverables Discussed in meetings 15/16 July and 10/11 Sept, and Webex and s 9/30/20092FNAL.
Assembly Procedures of the cavities Ancillaries (RF power coupler, Tuning system, RF cables) 19/03/2014Mathieu Therasse BE/RF/SRF1 Special Linac WG meeting:
56 MHz SRF Cavity Thermal Analysis and Vacuum Chamber Strength C. Pai
Summary ( Cryomodule, Plug-compatible Interface) Norihito Ohuchi.
Date 2007/Oct./23 FNAL-GDE-Meeting Global Design Effort 1 Cryomodule Interface Definition (FNAL-GDE-Meeting) N. Ohuchi.
RICH1 Gas Enclosure Installation. Experimental Area Meeting at CERN on 21st June 2006 Bill Cameron (Imperial College London) on behalf of the RICH1 team.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
 =1 cavity: parameters Dimensions for cavity fabrication before any chemical polishing and at room Temp. outer ½ cell pick-up side inner ½ cells outer.
Alignment and assembling of the cryomodule Yun He, James Sears, Matthias Liepe.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
LHC Cryostat evaluation Nikolay Solyak Thanks Rama Calaga, Tom Peterson, Slava Yakovlev, Ivan Gonin C11 workshop. FNAL, Oct 27-28, 2008.
HiLumi-LHC/LARP Crab Cavity System External Review – May Work partly supported by the EU FP7 HiLumi LHC grant agreement No and by the.
Modifications assembly zone CRAB Cavity SM18 View assembly zone with Cavitys LHC cryomodule/string CRAB + gantry/cryomodule SPL (plan: LHCACFGA_T0036)
MQXFB design, assembly plans & tooling at CERN J.C Perez On behalf of MQXF collaboration team MQXF Workshop on Structure, Alignment and Electrical QA.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Cryomodule Assembly Facility Fermilab Cleanroom: Assembly/Disassembly Tools Tug Arkan 1.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Cryomodule Interconnect Installation Issues A Comparison of XFEL to LCLSII Karen Fant 7/29/2015.
JLAB Cryomodule Assembly Facilities Visit Report Tug Arkan, Yuriy Orlov March 26, 2012.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
F LESEIGNEUR / G OLIVIER LUND January 9th, ESS HIGH BETA CRYOMODULE ESS CRYOMODULE STATUS MEETING HIGH BETA CRYOMODULE LUND JANUARY 9TH, 2013 Unité.
CERN – Zanon discussions
MQXC Nb-Ti 120mm 120T/m 2m models
Stress and cool-down analysis of the cryomodule
HFM Test Station Main Cryostat
Barrel EMC assembling (EDMS DOCUMENT NUMBER /1)
INSTALLATION SEQUENCE
LARP Vertical Test Facility
Definition of work flow for string DESY Example on critical operation
Sphere Option for Helical spring CF16 Bellows Adjustment bolts (horizontal plane) CF38.
CRAB cavities Cryomodule review Tuner
CERN Cryomodule Requirements for Crab Cavities
Superconducting RF Crab Cavities
UK RFD Pre-Series cryomodule
Design of Distribution Feedbox at LHC P7
Teleconference ACS – FREIA 20th February 2018
IMP Cryomodule Assembly and Alignment
IHEP Cryomodule Status
Alignment of Main Linac Cryomodule (MLC)
Cryomodule Assembly Plan
CEPC-650MHz Cavity Cryomodule
April 19th 2017 Work Unit AIK CDR of the CDS-SL Installation integration.
Teleconference ACS – FREIA 19th June 2017
Work Unit AIK 11.2 CDR of the CDS-SL Mechanics
Magnetic shielding and thermal shielding
SNS PPU Cryomodule Space Frame
SC1R Cold Box PDR Assembly Sequence
Presentation transcript:

The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme 7 Capacities Specific Programme, Grant Agreement Assembly tooling for CRAB Assembly tooling for CRAB Cryomodule: 1-Tooling overview SM18 zone 2-Assembly procedure of string 3- External assembly sequence gantry side Pierre MINGINETTE 09/11/2015 CERN/EN/MME

1-Toolings overview SM18 external clean room mounting area 2 Gantry CMU 2 tons / lifting stroke 3000 mm Trolley for top plate /Magnetic shield/ thermal screen Trolley for string assembly Roller for vacuum vessel Lifting zone final assembly Transfer zone - 4 systems for all assembly sequence

3 2-Assembly procedure of string Clean room zone SM18 Aperture stroke 1000 mm Manual crane for loading every components on trolley (9 components) - Every components of string trolley compatible with Clean room ISO5.

4 Step 1 : Load every components in open position on trolley with manual crane X Y Z Step 2 : Alignment of cavity with the vertical and horizontal plan of external gantry Step 3 : Alignment of every connection bellow in function of opposite flange of cavity *Every components are clean and closed by flanges Step 4 : Final closure / open the flanges and connect every components with X displacement Details of adjustments on the string trolley X/Y Cavity adjustment 6 screw stroke +/-10mm Z Cavity adjusyement 4 screw stroke +/-10mm X free adjustment Rotation adjustment ring X axis 2 independents columns Z axis adjustment 3 conical Holes around the flange on 2 side for alignment target 2 independents screw Y axis adjustment Removable stirrup Retaining Cu Gasket Mounting on spring washer small adjustment for final closure

5 *Additional displacement for valve insertion on the valve box Manual linear actuator Z stroke 200mm (-180mm/+20mm with beam axis referential) X Y Z *Clean room assembly finished Ready to go to the transfer zone

6 3-External assembly sequence Step 1 : Insertion of magnetic shield on vacuum vessel - Assembly and attached the magnetic shield on suspension frame of gantry / transfer to the vacuum vessel Assembly magnetic shield Magnetic shield insertion on vacuum vessel

7 Step 2 : Transfer and fixed to suspension frame: - Top plate / Upper plate of thermal shield / Welding the main Helium tank tube to cavity Top plate Upper plate thermal shield Connexion tube Helium Tank Suspension frame Welds

8 Step 3 : Transfer and Fixed string assembly on the top plate /Mounting alignments plates / Welding small tube on He tank Small tubes on Helium Tank Alignments plates

9 Step 4 : Mounting directly on the gantry: - Alignment BECAM system / Tuning frame + tuner actuator / HOM coaxial connection BECAM System Tuning frame + tuner actuator HOM coaxial connection

10 Step 5 : Mounting directly on the gantry: - Thermal shield assembly / Transfer vacuum vessel + magnetic shield to gantry zone / cryostating Thermal shield assembly 530mm Insertion on vacuum vessel Cryostating Thank you for your attention