A. Calcaterra, R. de Sangro, G. Felici, G. Finocchiaro, P. Patteri, M. Piccolo INFN LNF XIII SuperB General Meeting DCH-I parallel session Elba, 30 May.

Slides:



Advertisements
Similar presentations
24-Apr-15S.Movchan Straw prototype beam test into the NA48 infrastructure 1 Goals: test of straw prototype wires positioning straw bending check grounding.
Advertisements

A scalable DAQ system using the DRS4 sampling chip H.Friederich 1, G.Davatz 1, U.Hartmann 2, A.Howard 1, H.Meyer 1, D.Murer 1, S.Ritt 2, N.Schlumpf 2 1.
D. Peterson, “Tracking Detector R&D at Cornell University and Purdue University” LC-TPC-LBL 18-Oct Tracking Detector R&D at Cornell University and.
1 Scintillating Fibre Cosmic Ray Test Results Malcolm Ellis Imperial College London Monday 29 th March 2004.
PHENIX Vertex Tracker Atsushi Taketani for PHENIX collaboration RIKEN Nishina Center RIKEN Brookhaven Research Center 1.Over view of Vertex detector 2.Physics.
Large Area, High Speed Photo-detectors Readout Jean-Francois Genat + On behalf and with the help of Herve Grabas +, Samuel Meehan +, Eric Oberla +, Fukun.
Design and test of a high-speed beam monitor for hardon therapy H. Pernegger on behalf of Erich Griesmayer Fachhochschule Wr. Neustadt/Fotec Austria (H.
1 F. GrancagnoloILC Workshop Valencia, ILC Workshop - ECFA and GDE Joint Meeting Valencia, 5-13 November 2006 F. Grancagnolo, INFN - Lecce.
Large Cell Scope Pictures HV Gnd 1nF Large Cell Tube Anode signal Cathode signal scope S1 S2 S1 S2 The following scope pictures were all taken with the.
Fast Waveform Digitizing in Radiation Detection using Switched Capacitor Arrays Stefan Ritt Paul Scherrer Institute, Switzerland.
The Transverse detector is made of an array of 256 scintillating fibers coupled to Avalanche PhotoDiodes (APD). The small size of the fibers (5X5mm) results.
G. Martellotti CERN 22/04/20021 Tooling / Test Stations for MWPC (Meeting LNF, Roma1/Pz ) Production rate : 408 chambers (Fe + LNF) :192 R4 M1.
A.meneguzzo, 03 april 2002 LNL- MB3 chamber test with cosmic triggers Some results on the tests performed on the MB3 chambers produced in Legnaro are presented.
Overview of SPring-8 Beam Test Manabu MORITSU ( Osaka University ) 11 Sep., 2015 COMET Collaboration Meeting 17 Paris, France 1 COMET-CDC.
PERFORMANCE OF THE MACRO LIMITED STREAMER TUBES IN DRIFT MODE FOR MEASUREMENTS OF MUON ENERGY - Use of the MACRO limited streamer tubes in drift mode -Use.
PMF: front end board for the ATLAS Luminometer ALFA TWEPP 2008 – 19 th September 2008 Parallel Session B6 – Programmable logic, boards, crates and systems.
14/02/2007 Paolo Walter Cattaneo 1 1.Trigger analysis 2.Muon rate 3.Q distribution 4.Baseline 5.Pulse shape 6.Z measurement 7.Att measurement OUTLINE.
Updates on GEMs characterization with APV electronics K. Gnanvo, N. Liyanage, K. Saenboonruang.
VC Feb 2010Slide 1 EMR Construction Status o General Design o Electronics o Cosmics test Jean-Sebastien Graulich, Geneva.
PHENIX Drift Chamber operation principles Modified by Victor Riabov Focus meeting 01/06/04 Original by Sergey Butsyk Focus meeting 01/14/03.
TIDE TESTS AT GDD LAB M. Casiraghi and F. Vasi. New detector configuration Low pressure chamber anode.
Malte Hildebrandt, PSIMEG - Review Meeting / 1   e  Drift Chambers Charge Division Test Chamber Testsetup for Cosmics Chamber Construction.
1 A.Andronic 1, H.Appelshäuser 1, V.Babkin 2, P.Braun-Munzinger 1, S.Chernenko 2, D.Emschernmann 3, C.Garabatos 1, V.Golovatyuk 2, J.Hehner 1, M.Hoppe.
Beam Tests of 3D Vertically Interconnected Prototypes Matthew Jones (Purdue University) Grzegorz Deptuch, Scott Holm, Ryan Rivera, Lorenzo Uplegger (FNAL)
M. Chefdeville LAPP, Annecy, France. Introduction  Motivations for a Digital hadronic calorimeter Count hits instead of measuring energy deposits Reduce.
The DRS2 Chip: A 4.5 GHz Waveform Digitizing Chip for the MEG Experiment Stefan Ritt Paul Scherrer Institute, Switzerland.
The LNF test setup Status as of Geometry of LNF setup Top and bottom trigger counters 4 KLOE-type tracking chambers One BESIII-(COMPASS-)type.
1 DAQ Update MEG Review Meeting, Feb. 17 th 2010.
N. Morgan, Virginia Tech Qweak meeting,Oct ‘05 Region 2 Drift Chambers Status Report Qweak Collaboration Meeting October 2005.
A. Meneguzzo Padova University & INFN Validation and Performance of the CMS Barrel Muon Drift Chambers with Cosmic Rays A. Meneguzzo Padova University.
Progress on the beam tracking instrumentation Position measurement device Tests performed and their resolution Decision on electronics Summary.
Jefferson Laboratory Hall A SuperBigBite Spectrometer Data Acquisition System Alexandre Camsonne APS DNP 2013 October 24 th 2013 Hall A Jefferson Laboratory.
Tests of RPCs (Resistive Plate Chambers) for the ARGO experiment at YBJ G. Aielli¹, P.Camarri¹, R. Cardarelli¹, M. Civardi², L. Di Stante¹, B. Liberti¹,
1 A CLUster COUnting Drift Chamber for ILC …and… can we adapt this chamber to SuperB ? F.Grancagnolo, INFN – Lecce, Italy.
1 Electronics Status Trigger and DAQ run successfully in RUN2006 for the first time Trigger communication to DRS boards via trigger bus Trigger firmware.
Test results of Multi-gap RPC Test Chambers for a Digital HCAL  Geometrical design  Test setup  Signal: avalanche mode and streamer mode  Comparison.
Semi Digital HCAL Data analysis results Robert Kieffer Institut de Physique Nucléaire de Lyon 10/02/
CGEM-IT project and beam test program G. Felici for the FE-LNF-TO team Partially supported by the Italian Ministry of Foreign Affairs under the Program.
RD51 GEM Telescope: results from June 2010 test beam and work in progress Matteo Alfonsi on behalf of CERN GDD group and Siena/PISA INFN group.
Station-4 MuID System: Status Ming X. Liu Los Alamos National Lab 1/7/091E906 Collaboration Meeting.
Siena, May A.Tonazzo –Performance of ATLAS MDT chambers /1 Performance of BIL tracking chambers for the ATLAS muon spectrometer A.Baroncelli,
Upgrade with Silicon Vertex Tracker Rachid Nouicer Brookhaven National Laboratory (BNL) For the PHENIX Collaboration Stripixel VTX Review October 1, 2008.
THE WaveDAQ SYSTEM FOR THE MEG II UPGRADE … read out by MIDAS Stefan Ritt, Paul Scherrer Institute, Switzerland 15 July 2015MIDAS Workshop, TRIUMF Paul.
Outline Description of the experimental setup Aim of this work TDC spectra analysis Tracking method steps Autocalibration Single tube resolution Summary.
G.F. Tassielli - SuperB Workshop XI LNF1/11 02/12/2009 Status report on CLUster COUnting activities G. F. Tassielli on behalf of CLUCOU group SuperB Workshop.
G. Finocchiaro – INFN LNF XI SuperB General Meeting DCH-I parallel session LNF, 1 December 2009.
A. Calcaterra, R. de Sangro, G. Felici, G. Finocchiaro, P. Patteri, M. Piccolo INFN LNF XIV SuperB General Meeting DCH-I parallel session LNF, 27 September.
Pixel Sensors for the Mu3e Detector Dirk Wiedner on behalf of Mu3e February Dirk Wiedner PSI 2/15.
Precision Drift Tube Detectors for High Counting Rates O. Kortner, H. Kroha, F. Legger, R. Richter Max-Planck-Institut für Physik, Munich, Germany A. Engl,
 13 Readout Electronics A First Look 28-Jan-2004.
A. Parenti 1 RT 2007, Batavia IL The CMS Muon System and its Performance in the Cosmic Challenge RT2007 conference, Batavia IL, USA May 03, 2007 Andrea.
A high rate fast precision tracking trigger with RPCs
Transient Waveform Recording Utilizing TARGET7 ASIC
DAQ ACQUISITION FOR THE dE/dX DETECTOR
L. Benussi On Behalf of LNF crew
DCH FEE STATUS Level 1 Triggered Data Flow FEE Implementation &
MDT second coordinate readout: status and perspectives
S.Movchan Straw prototype beam test into the NA48 infrastructure
First results from prototype measurements
Start Detector for pion experiments
DCH FEE 28 chs DCH prototype FEE &
PADI for straw tube readout and diamonds for MIPs and for high precision tracking beam test – Jülich, Feb Jerzy Pietraszko, Michael Träger, Mircea.
Tassielli G.F. INFN Lecce & Università del Salento
News on second coordinate readout
SuperB LNF meeting March 21st 2012 Marcello Piccolo
A First Look J. Pilcher 12-Mar-2004
Han Jifeng BESIII MUON GROUP IHEP, CAS
Perugia – IX SuperB General Meeting G. Finocchiaro INFN-LNF
Report from LNF Perugia, DCH II 17 June 2009
Trigger operation during 2007 run
Presentation transcript:

A. Calcaterra, R. de Sangro, G. Felici, G. Finocchiaro, P. Patteri, M. Piccolo INFN LNF XIII SuperB General Meeting DCH-I parallel session Elba, 30 May 2010

Experimental Setup 30/05/20102G. Finocchiaro Prototype 1  6x4 hexagonal cells à la B A B AR – Guard wires to ensure uniformity of electric field among cells – Aluminized mylar windows on entrance-exit faces – small gas volume low rate on cosmics fast gas mixture switching times LST Telescope:  Two identical assemblies of 26 tubes each  3 cm diameter, 100 μm wires  40%-60% Ar-iC 4 H 10 mixture

Tracks extrapolated in Proto1 30/05/20103G. Finocchiaro Mylar windows 10cm lead p cut ~150MeV/c

Tracks extrapolated in Proto1 30/05/20104G. Finocchiaro

Illumination from tracks in Proto1 30/05/20105G. Finocchiaro …in the four internal layers 80%He-20%iC 4 H HV=1960V

Illumination from tracks in Proto1 30/05/20106G. Finocchiaro …in the four internal layers 80%He-20%iC 4 H HV=2160V

Track Impact Parameter Resolution 30/05/20107G. Finocchiaro Telescope single tube spatial resolution ~100  m

Space-Time Relations 30/05/20108G. Finocchiaro 95%He-5%iC 4 H HV=1600V

Space-Time Relations 30/05/20109G. Finocchiaro 95%He-5%iC 4 H HV=1600V

Track Fit Residuals 30/05/201010G. Finocchiaro 95%He-5%iC 4 H HV=1600V

Spatial resolution – 95%He-5%iC 4 H 10 30/05/201011G. Finocchiaro HV=1550V HV=1650V

Spatial resolution – 80%He-20%iC 4 H 10 30/05/201012G. Finocchiaro HV=1960VHV=2160V

35%He-65%CH 4 - HV=2760V 30/05/201013G. Finocchiaro t vs. xQ vs. x

35%He-65%CH 4 - spatial resolution 30/05/201014G. Finocchiaro HV=2760V cell (3,2) cell (2,2)

51%He-49%CH 4 - t vs x 30/05/201015G. Finocchiaro 2460V 2410V 2360V

51%He-49%CH 4 - Q vs x 30/05/201016G. Finocchiaro 2460V 2410V 2360V

51%He-49%CH 4 - spatial resolution 30/05/201017G. Finocchiaro HV=2460VHV=2410V

67%He-33%CH 4 - t vs x 30/05/201018G. Finocchiaro 67%He-33%CH HV=2510V 67%He-33%CH HV=2410V

67%He-33%CH 4 - Q vs x 30/05/201019G. Finocchiaro 67%He-33%CH HV=2510V 67%He-33%CH HV=2410V

67%He-33%CH 4 - spatial resolution 30/05/201020G. Finocchiaro HV=2510V HV=2410V HV=2310V

79%He-21%CH 4 - t vs x 30/05/201021G. Finocchiaro HV=2210V HV=2110V

79%He-21%CH 4 - Q vs x 30/05/201022G. Finocchiaro HV=2210V HV=2110V

79%He-21%CH 4 - spatial resolution 30/05/201023G. Finocchiaro HV=2210V cell (3,2) cell (2,2)

Gas Mixture Comparison 19/03/2010G. Finocchiaro24  (g/cm 3 ) x1 0 4 X0(m)N P (cm  )N T (cm  )t max (ns)  (  m) 80%He-20%iC 4 H %He-10%iC 4 H %He- 5%iC 4 H %He-65%CH %He-49%CH %He-33%CH %He-21%CH N.B.: t max and space resolution depend on other parameters. Figures shown are preliminary and indicative.

Read 4 channels of proto1 through DRS4 (*) “evaluation board” Channel arrangement chosen to see cosmic ray tracks Same channels (after active splitters) as in the standard DAQ chain Waveform Digitization 30/05/2010G. Finocchiaro25 (*) A switched capacitor array (SCA) with 1024 cells, capable of digitizing eight analog signals with high speed (6 GSPS) and high accuracy (11.5 bit SNR) on a single chip ( [only 4 channels read-out with current version of firmware] Same acquisition trigger (scintillator counters coincidence) as telescope+proto1 setup shown so far − Due to technical reasons, still recording events using different programs (running on different computers!)  work in progress to correlate waveforms with reconstructed tracks −Proto1 preamp bandwidth only ~100MHz  just a sandbox for now

We see coincidences! Waveform Digitization 30/05/2010G. Finocchiaro26 80%He-20%iC 4 H 10 HV=2060V

…and could even count clusters! (with low efficiency, and a lot of fantasy…) Waveform digitization 30/05/2010G. Finocchiaro27 80%He-20%iC 4 H 10 HV=2060V

Waveform digitization 30/05/2010G. Finocchiaro28 97%He-3%iC 4 H 10 HV=1500V Events are written to disk, and read back

Waveform digitization 30/05/2010G. Finocchiaro29 80%He-20%iC 4 H 10 - HV=1960V First 200 waveforms for the four channels (not on the same scale) RMS ~2mV

Time Spectra with varying thresholds 30/05/2010G. Finocchiaro30 80%He-20%iC 4 H 10 - HV=1960V - 5 mV - 10 mV - 12 mV - 15 mV

Summary First preliminary v drift and spatial resolution results on He-based gas mixtures with different quencher contents – important dependence on other operating conditions, e.g. HV and discrimination threshold see also Matteo’s talk in DCH session #2 on the B A B AR DCH performances Starting waveform digitization studies – faster preamps, and full integration with DAQ program next steps 30/05/2010G. Finocchiaro31