Overview of Onsite Progress Jian-ping Chen g 2 p /G ep Collabroation Meeting.

Slides:



Advertisements
Similar presentations
G2p/GEp Preparation Overview Jian-ping Chen g 2 p /G ep Readiness Review 5/6/2011.
Advertisements

Super BigBite concepts Bogdan Wojtsekhowski, JLab
Measuring the Neutron and 3 He Spin Structure at Low Q 2 Vincent Sulkosky College of William and Mary, Williamsburg VA Experimental Overview The.
General Considerations Jian-ping Chen SoLID-SIDIS Collaboration Meeting.
G2p Hall Infrastructure Alan Gavalya May Overall g2p Target on Pivot in Hall A.
Y. R. Roblin, G2P review, 1/17/ HALLA G2P readiness review Yves Roblin, CASA.
Jixie Zhang Javier Gomez Oleksandr Glamazdin Roman Pomatsalyuk Vadym Vereshchaka Hall A Collabortion Meeting, Dec 2012 Hall A Moller Polarimeter 12 GeV.
Polarized Target “Issues” Magnet Microwaves Target Ammonia.
G2P Target installation and Beyond. Schedule Pivot before.
G2p/GEp Beamline Tim Michalski Project Lead. Overview Facilitate the design, procurement, and build of the beamline – up to the target chamber g2p/GEp.
Upcoming Review of the Hall D Photon Beam and Tagger Richard Jones, University of Connecticut, for the GlueX collaboration GlueX Collaboration Meeting.
Polarized 3 He Target System Overview Design Vertical Polarization Spin-Flip Oven/Ladder/Enclosure/Access Laser/Optics/Cells Polarimetry Safety/Documents.
SHMS Detector Commissioning and Installation Howard Fenker Hall-C Users Meeting Jan-2015.
Min Huang Duke University, TUNL On Behalf of the E g2p collaboration Hall A Analysis Workshop, 12/12/12.
Karl Slifer University of New Hampshire Jefferson Lab User Group Meeting 6/5/2012.
PAIR SPECTROMETER DEVELOPMENT IN HALL D PAWEL AMBROZEWICZ NC A&T OUTLINE : PS Goals PS Goals PrimEx Experience PrimEx Experience Design Details Design.
K. Slifer, UNH g2p & the LT Spin Polarizability for the E Collaboration E June 9, 2011.
Improved beam line for Hall A layouts, present and proposed optics in altered region benefits of proposed layout costs of proposed layout conclusions.
05/30/08J. Dunne -- SANE Collaboration Meeting 1 Beamline Status Upstream beamline –Chicane –SEM –Rasters –Girder Downstream beamline –Helium bag –Extension.
Proposed SoLID Organization Structure Chair EB GEM-US Magnet GEM-China Heavy Cherenkov Light Cherenkov Calorimeter Large Angle Calorimeter Forward Reconstruction/
Status of the Beamline Simulation A.Somov Jefferson Lab Collaboration Meeting, May 11, 2010.
HRSMC, A Geant4 Simulation for HRS Jixie Zhang CREX Collaboration Meeting April 2014 Jixie Zhang1April 2014.
SoLID: large acceptance, capable of handling high luminosity (up to~10 39 with baffle, up to ~10 37 without baffle)  Ideal for precision Inclusive-DIS.
WBS1 SBS Basic: Magnet and Infrastructure Robin Wines 11/4/ SBS DOE Review.
S PIN A SYMMETRIES ON THE N UCLEON E XPERIMENT ( E07-003) Anusha Liyanage Experiment Nuclear Physics Group Meeting Hampton University May 11, 2009.
UVA Polarized Target In Hall A Pictures and Cost Paul Brindza Dec 17, 2009.
E : Proton g 2 Structure Function Fundamental spin observable has never been measured at low or moderate Q 2 BC Sum Rule : violation suggested for.
Polarized 3 He Target for 12 GeV Experiments J. P. Chen, August 15, 2012, JLab  Experiments and requirements  Target performance from previous experiments.
Jin Huang M.I.T. Hall A Analysis Workshop Dec 14, JLab.
G2p/GEp Beamline Tim Michalski Project Lead. Beamline Overview Slow Raster Tungsten Calorimeter Upside Down Girder (correctors, BCM, superharp) FZ1 Magnet.
G2p/gep Beamline Project Overview Tim Michalski Project Lead.
Preparation for E Pi0 Collaboration Meeting Tuesday Feb R.Lindgren.
A1n Meeting R. Michaels, May 24-25, 2012 Welcome !! Recent Activity in Hall A Schedule for Early Beam in Hall A My task list for July 1 New Hall A leader,
Thia Keppel 6/4/13 Hall A Update. Near term accelerator schedule – same as last meeting Accelerator Run II: Beam in hall 3/2014, or maybe as early as.
Overview of SoLID Jian-ping Chen, JLab SoLID Collaboration Meeting July 9-10, 2014.
Transversity Readiness and Timeline Xiaodong Jiang, March 17th, This document specifies the overall readiness for Hall A experiments E06-010/E
MOLLER Collaboration Meeting May 2014 Hall A Update Thia Keppel 1.
Calorimetry for Deeply Virtual Compton Scattering in Hall A Alexandre Camsonne Hall A Jefferson Laboratory Workshop on General Purpose High Resolution.
International Linear Collider at Stanford Linear Accelerator Center 9/13/2006 Americas Regional Team FY08-09 Planning Meeting 1 1/11 ILC-Americas FY08-09.
Overview of SoLID Jian-ping Chen, JLab SoLID Collaboration Meeting Nov. 7-8, 2014.
Spreaders & Recombiners Beam Transport Michael Bevins May 30, GeV Upgrade - Beam Transport Spreader/Recombiner Dipoles and Layout, & Installation.
SANE Collaboration ( E07-003) Anusha Liyanage Hampton University January 12, 2010 Measurement Of the Proton Form Factor Ratio at High Q 2 by Using The.
Bubble Chamber Planning Meeting 07 August
Septum Magnets in Hall A Hall A Collaboration Meeting 6/10-11/2010 John J. LeRose.
Run Coordnator Report 2012/04/ /04/10 Jixie Zhang
Beam Position Reconstruction Pengjia Zhu 02/15/2012.
Physics Goals & Overview K. Slifer, UNH April 18, 2011 E08-027/007 Collaboration meeting.
Update/Overview of SoLID Jian-ping Chen, Jefferson Lab SoLID Collaboration Meeting Dec , 2012.
E Research Update: Asymmetry Measurements in Quasi-Elastic Ge Jin University of Virginia for Jefferson Lab E Collaboration.
Envisioned PbWO4 detector Wide-Angle Compton Scattering at JLab-12 GeV with a neutral-particle detector With much input from B. Wojtsekhowski and P. Kroll.
Hall A Update Thia Keppel User Group Board of Directors January 2015.
Min Huang g2p/GEp Collaboration Meeting April 18, 2011.
Pb-Parity and Septum Update Presented by: Luis Mercado UMass - Amherst 12/05/2008 Thanks to Robert Michaels, Kent Pachke, Krishna Kumar, Dustin McNulty.
Status of Polarimeters and Polarized Targets: what are the plans for development of polarized targets to meet the needs of the Day 1 and future experimental.
Jefferson Lab PAC 30 1 August 23, 2006 PR (Hall A) ● PR (Hall C) Measuring the Neutron g 2 and d 2 at 12 GeV PR (Hall A) ● PR
New Proposal PR : SIDIS Using SoLID and Transversely Polarized Proton Target Kalyan Allada Jefferson Lab Spokespersons: K. Allada (JLab), J. P.
G2p/GEp Beamline Status Tim Michalski Project Lead.
Polarized WACS Experiment (E ) Using Compact Photon Source (CPS)
SHMS Downstream Beamline Large SHMS/HMS Angles (Config-1)
HRS at small angles for e+/ e- pair for APEX
Hall A Infrastructure and the Moller Parity Experiment “AMPEX”
University of New Hampshire Nuclear & Particle Physics Group
Special Considerations for SIDIS
GEANT Simulations and Track Reconstruction
Hall “12 GeV” May 27, 2003 NAPP 2003: J.J. LeRose.
PREX / CREX Collaboration Meeting and Status
Hall C Beamline Upgrade
Overview of Polarized 3He Target
BCM test in low current for g2p
Polarized He3 Target Upgrade (Stage I) for A1n/d2n
Presentation transcript:

Overview of Onsite Progress Jian-ping Chen g 2 p /G ep Collabroation Meeting

REGION 1 REGION 2REGION 3 REG 4 REGION 5 Slow Raster FZ1 FixedStand FZ2 Telescoping Stand DUMP TARGET Polarized Solid NH 3 Target (Hall C/UVa target) Target material irradiation Beamline (Similar to Hall C) Magnetic Chicane/Beamline modifications. Low beam current BCM/BPMs Slow Raster Hall A Engineering/Design Local Beam Dump Hall Infra-structure Scattering Chamber/ Target/magnet mount Septum Magnets Simulations/Optics/Spectrometer/Detectors/QAD… BPMs Use existing equipments Hall C beamline/target Keep change minimum modify the existing PREX septa use simple local beam dump Major equipments for g 2 p /G E p experiments Septa/HRS

Significant Progress in Beam Line System (T. Michalski, B. Dillon-Townes) Overview conceptual design completed Region 1 and Region 2 design drawings completed Region 3 main items identified and detail design on-going Existing hardware items (magnets, raster, power supplies) located New items (BPM electronics, Harps, BCM, BD magnets, …) Target Progress (C. Keith/ D. Crabb) Conceptual design Rotating seal Pumps ordered New fridge at UVa tested (along with existing target materials and other systems) need to manufacture one fridge at JLab Target material irriadiation: will do it at NIST Magnet is being shipped from Oxford back to JLab? Hall A infrastructure, Beam dump, Septum (A. Gavalya, R. Wines) Setup at the pivot area for the target Beam dump Septum Scattering chamber/ layout/ interferences 3 rd Arm for polarization monitoring Simulations Overview of Progress

3.3 GeV, 12.5 deg 2.2 GeV, 15 deg 3.3 GeV, 6 deg 2.2 GeV, 6 deg 1.6 GeV, 6 deg 1.1 GeV, 6 deg Polarized beam: nA up to 5 uA? for optics, 30 uA ? for Compton Polarized NH 3 target Slow Raster 25 mm diameter G e p configuration is now basically g 2 p at the elastic setting Two configurations: with septa (6 degree) (target at 87 cm upstream) and without septa (12.5 and 15 degrees) (target at original pivot) g 2 p needs target at 90 degrees for all and 0 degree for 3.3 GeV G E p needs target at 80 degree Kinematic Settings (Last Meeting)

3.3 GeV, 12.5 deg 2.2 GeV, 12.5 deg 3.3 GeV, 6 deg 2.2 GeV, 6 deg 1.6 GeV, 6 deg 1.1 GeV, 6 deg Polarized beam: nA up to 1 uA for optics, (also for Compton?) Polarized NH 3 target Slow Raster mm diameter G e p configuration is basically g 2 p at the elastic setting Two configurations: with septa (6 degree) (target at 87 cm upstream) and without septa (12.5 and 15 degrees) (target at original pivot) G 2 p : target at 90 degrees for all and 0 degree for 3.3 GeV G E p : target at 20 degree? Kinematic Settings (Now)

Cost, mostly consistent with initial estimation, some increase due to new items A) Beam line procurement: 14 BMP electronics harps (can not use the existing French harps) Beam line manpower: the two items above + software group B) Target group estimation, procurement increased from 80 K to 140K. FY11, continuing resolution addition funding from DOE (promised) not here yet. User pledged contribution to procurement : $ 80K to Engineering/Installation: ? Total: $140K Will need user to honor the pledges. Manpower cost will be supplied from within JLab. Need help from user manpower Budget and User Contributions

Questions and Issues Should we do Compton with 1 uA, straight-through, how many times? How should we do optcis study-? What optics target(s) should we have? How to do the polarization monitoring (3 rd arm)? Should we do a field map at EEL? Should we add some iron plates to study the effect? Should we and how to measure field direction? Should we do a field map in Hall A (combining target/septa)? …?

Onsite User/Hall A People Power PhD Students: Pengjia Zhu (USTC, advisor: Yunxiu Ye), 3 rd year, onsite, (beamline, target) Min Huang (Duke, Haiyan Gao), 3 rd year, onsite, (simulation, optics) Chai Gu (UVa, Nilanga Liyanaga), 2 nd year, onsite from 2/2011 Melissa Cummings (W&M, Todd Averett), 2 nd year, onsite from 5/2011 A student from Temple (Zein-Eddine Meziani), 2 nd year, onsite from 5/2011? Name? (New Hampshire, Karl Slifer), 1 st year, onsite from? ? Postdocs: Kalyan Allada (Hall A), beamline, 3 rd arm Jixie Zhang (Hall A): simulation, optics Xiaohui Zhan (Argonne) (onsite from 2/2011), target? Narbe Kalantarians(UVa): target Hovhannes Baghdasaryan (UVa) ? Sarah Philips (New Hampshire) ? ? Physicists: Jian-ping Chen (Hall A): Project manager, overall coordination Alexandre Camsonne (Hall A): Beam line, DAQ, … Karl Slifer (New Hampershire): Overall consideration, run plan, … Doug Higinbotham (Hall A) (will be more available after SRC experiments?) Guy Ron (LBNL)? ?