Risk Elements Marc Kaducak Project X Machine Advisory Committee March 18-19, 2013.

Slides:



Advertisements
Similar presentations
Final Design of a CW Radio-Frequency Quadrupole (RFQ) for the Project X Injector Experiment (PXIE)* Abstract: The Project X Injector Experiment (PXIE)
Advertisements

FNAL Superconducting RF Program Sergei Nagaitsev.
Project X Injector Experiment (PXIE) Steve Holmes Fermilab Proton Accelerators for Science and Innovation: Second Annual Meeting Rutherford Appleton Laboratory.
Project X: News & Strategy Steve Holmes Project X Working Group Meeting November 19, 2009.
ANL HWR Cryomodule Status Update 27 January 2015 Zachary Conway On behalf of the ANL Linac Development Group Argonne National Laboratory Physics Division.
RF Unit Test Facility at NML & CM1 Test Plan Bob Kephart Fermilab IWLC-10 October 20, 2010.
Question 27: Outline the key steps for industrialization of machine components and the likely remaining vulnerabilities in achieving them. Achieving industrialization.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
Project X Update Steve Holmes SPAFOA Meeting November 13, 2012
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
Project X: Project Status Steve Holmes Project X Working Group Meeting December 15, 2011.
Proton Driver at Fermilab Keith Gollwitzer Accelerator Division Fermilab IDS-NF 7 th Plenary Meeting Oct 17-19,2011.
FNAL Superconducting RF Program Bob Kephart. Goals of the Fermilab SRF Program Support the strategic goals of the U.S. HEP program  Energy frontier:
M. Ross, N. Walker, A. Yamamoto ILC Cost Review, (updated for TB) and Cost Drivers  Future R & D ILC Cost Review (M. Ross,
F Project X Overview Dave McGinnis October 12, 2007.
January 5, 2004S. A. Pande - CAT-KEK School on SNS MeV Injector Linac for Indian Spallation Neutron Source S. A. PANDE.
Cryomodule Development at Fermilab Don Mitchell Representing the SRF engineering community at Fermilab April 20, 2009 Tsukuba, Japan TILC09.
HINS Front-End R&D --- Status and Plans Bob Webber Fermilab Accelerator Advisory Committee August 7, 2007 Update of May 10 th – 12 th, 2006 AAC Presentation.
Americas Region: T4CM Status and Plans H. Carter TD SRF Dev. Dept. July 14, 2006.
SRF Requirements and Challenges for ERL-Based Light Sources Ali Nassiri Advanced Photon Source Argonne National Laboratory 2 nd Argonne – Fermilab Collaboration.
PROTON LINAC FOR INDIAN SNS Vinod Bharadwaj, SLAC (reporting for the Indian SNS Design Team)
Project X Injector Experiment (PXIE) Sergei Nagaitsev Dec 19, 2011.
Americas Main Linac Cavity and Cryomodule WBS X.9 Resource Proposal.
Overview of Booster PIP II upgrades and plans C.Y. Tan for Proton Source group PIP II Collaboration Meeting 03 June 2014.
Horizontal Test Stands and CC2 Results Andy Hocker Testing an alternative ILC cavity design at USPAS (Q 0 =2.23E+02)
Fermilab Proton Driver and Muons David Johnson Fermilab Neutrino Factory Muon Collider Collaboration Meeting March 14, 2006.
Overview and Status of the Fermilab High Intensity Neutrino Source R&D Program Giorgio Apollinari for Bob Webber.
Design Optimization of MEIC Ion Linac & Pre-Booster B. Mustapha, Z. Conway, B. Erdelyi and P. Ostroumov ANL & NIU MEIC Collaboration Meeting JLab, October.
Project X RD&D Plan Beam Transfer Line and Recycler Injection David Johnson AAC Meeting February 3, 2009.
Proton Driver Resources & Schedule (R&D Plan) Rich Stanek May 10, 2005.
Global Design Effort: Controls & LLRF Americas Region Team WBS x.2 Global Systems Program Overview for FY08/09.
Comparison of Fermilab Proton Driver to Suggested Energy Amplifier Linac Bob Webber April 13, 2007.
F DOE Annual Program Review High Intensity Neutrino Source R&D in the Meson Detector Building Bob Webber & Giorgio Apollinari September 26, 2007.
Status of Project X Keith Gollwitzer Accelerator Division Fermilab MAP Winter Meeting - March 1, 2011.
High power RF tests places at CERN O. Brunner, CERN 4th SPL Collaboration Meeting jointly with ESS.
Proton Driver Design Keith Gollwitzer Fermilab February 19, 2014.
Project X RD&D Plan 325 MHz Linac including High Intensity Neutrino Source (HINS) Program Bob Webber AAC Meeting February 3, 2009.
NML - RF Unit Test Facility Jerry Leibfritz Fermilab.
PIP-II: Goals, Strategy, and Status Paul Derwent 26 February, 2015.
Project X: Accelerators Sergei Nagaitsev September 2, 2011.
SRF Cost Reduction for Project X Bob Kephart. SRF Challenges for Project X Adoption of a 3 GeV CW linac followed by a 3-8 GeV pulsed linac for Project.
Project X goals and organization Sergei Nagaitsev October 4, 2011.
26 April, 2016 LCLS II Cryomodules and Cryoplant, Joe Preble LCLS-II Overview JLAB Organization for LCLS-II JLAB responsibilities & Schedule and Status.
CMTF Cryogenics Arkadiy Klebaner May 6, Outline CMTF cryogenic system scope Goals Key functional requirements Conceptual layout Cryoplant Current.
HISTORY OF SNS DESIGN AND TECHNOLOGY CHOICES PROJECT X WORKSHOP NOVEMBER 12-13, 2007 R. KUSTOM.
1 Project X Workshop November 21-22, 2008 Richard York Chris Compton Walter Hartung Xiaoyu Wu Michigan State University.
Machine Protection Systems (MPS) Arden Warner, and Jim Steimel Project X Machine Advisory Committee March 18-19, 2013.
Introduction to the effort on C-ADS accelerator physics and review charges Jingyu Tang For the Joint IHEP-IMP group on the C-ADS Accelerator Physics International.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
International Collaborations: DAE-DOE Discovery Science Collaboration Shekhar Mishra, PIP-II MAC Review March 9-11, 2012.
Warm Front End Concept A. Shemyakin PIP-II Machine Advisory Committee 9-11 March 2015.
M. Munoz April 2, 2014 Beam Commissioning at ESS.
SRF Infrastructure Changes Required for a CW linac Robert Kephart FNAL AAC Meeting November 16, 2009.
Thomas Jefferson National Accelerator Facility Page 1 FNAL September 11, 2009 Design Considerations for CW SRF Linacs Claus H. Rode 12 GeV Project Manager.
FNAL Superconducting RF Program Bob Kephart. Goals of the Fermilab SRF Program Support the strategic goals of the U.S. HEP program  Energy frontier:
Integration of HWR, SSR1, and Cryo in the PXIE enclosure Curt Baffes PIP-II Collaboration Meeting 09 November 2015.
Fermilab-India Agreements and Collaboration Shekhar Mishra Project-X, International Collaboration Coodinator Fermi National Accelerator Laboratory Batavia,
Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Jefferson.
Cavities, Cryomodules, and Cryogenics Working Group 2 Summary Report Mark Champion, Sang-ho Kim Project X Collaboration Meeting April 12-14, 2011.
Infrastructure status and plans at CERN 1) W. Weingarten/CERN TTC Milano 28 February - 3 March W. Weingarten/CERN 1)Most of the slides are based.
WP5 Elliptical cavities
Requirements for Efficient CW SRF Cryomodules
Energy (ILC) and Intensity (Project X) SRF Cavity Needs
Progress and Issues with VTS Upgrade
Joint Accelerator Research JGU & HZB
Nick Walker (DESY) EU GDE Meeting Oxford
Daresbury ESS In-Kind Contributions
ERL Director’s Review Main Linac
SNS-PPU upgrades the existing accelerator structure
Multi-Ion Injector Linac Design – Progress Summary
Presentation transcript:

Risk Elements Marc Kaducak Project X Machine Advisory Committee March 18-19, 2013

Project Analogy 2013 XMAC Meeting, Marc Kaducak2 Thrill Rides: 1.Get in line. Have patience. 2.Start with a long, slow climb. Peak fear and anticipation. 3.Ups, downs, twists, turns, sometimes fully upside down. Full of surprises unless you’ve ridden before. 4.Completion. Exhilaration and relief followed by either crippling dizziness or desire to ride again. This project is literally a roller coaster

Status and Approach Project X has recently been asked to document an R&D plan based on a FY18 CD-3 (full construction authorization). We understand the primary goals and continue to refine the details of schedule and priority based on funding and resources. Substantial R&D has been done to date: –Major advances and infrastructure under the SRF R&D program. –Construction of PXIE (integrated front end system test) has begun. Further R&D is targeted to: –Raise level of technical readiness –Lower cost and schedule uncertainty 2013 XMAC Meeting, Marc Kaducak3

Types of Risk 2013 XMAC Meeting, Marc Kaducak4 Estimate Uncertainty Technology Readiness Most other risks not easily addressed by R&D

Technology Readiness 2013 XMAC Meeting, Marc Kaducak5 NASA Scale DoD Scale

Technology Readiness (DOE G A*) 2013 XMAC Meeting, Marc Kaducak6 * NOTE: This DOE guide is largely based on Environmental Management Projects GOAL

Technology Readiness and Cost Sensitivity – Status Today 2013 XMAC Meeting, Marc Kaducak 7 Linac Component LEBTRFQMEBT β=0.11 HWR β=0.22 SSR1 β=0.51 SSR2 β=0.61 LB650 β=0.9 HB650 β= Technology Readiness Cost (% of total) 1%5% (Cryomodules only) 16% (CMs only) 10% (CMs only) RT CW Pulsed MHz MeV 325 MHz MeV 650 MHz GeV 1.3 GHz 3-8 GeV Subsystem CW RF Pulsed RF CW Cryo Pulsed Cryo Beam Transport CW Civil Pulsed Civil MI/RR Upgrade Technical Readiness Cost (% of total) 8%4%11%3% 14%9%6% PXIE SRF R&D Focus of R&D, All apply to Stage 1 Not shown: Mgmt, Acc. Phys., Inst. Ctrls, Safety

Warm Front End - Challenges and Goals ItemStatusTechnical Challenges RFQDesign Complete, fab underway. Leverage SNS experience of LBNL CW operation: thermal management Fabrication (tests): Tools and fixtures, brazing and fabrication techniques MEBTPrototype kicker, ¼ size absorber to be bench tested this year. Kicker performance, 21 kW absorber, vacuum in proximity to SRF, effective extinction, emittance growth 2013 XMAC Meeting, Marc Kaducak8 Warm FE Overall Goals: –Demonstrate readiness of the following: RFQ CW Operation Chopper bunch-by-bunch performance, extinction levels Vacuum, particle migration levels between MEBT and HWR :

Front End Test - PXIE 2013 XMAC Meeting, Marc Kaducak9 CW H- source delivering 5 mA at 30 keV LEBT with beam pre-chopping CW RFQ operating at MHz and delivering 5 mA at 2.1 MeV MEBT with integrated wide-band chopper and beam absorbers capable of generating arbitrary bunch patterns at MHz, and disposing of 4 mA average beam current Low beta superconducting cryomodules: 1 mA to ~25 MeV Beam dump capable of accommodating 2 mA at 25 MeV (50 kW) for extended periods. Associated beam diagnostics, utilities and shielding RFQMEBT HWRSSR1 LEBT ~ 40 m long HEBT

PXIE Contribution to PX Technical Readiness CW RFQ Performance and Reliability Bunch-by-bunch Chopper Performance (kicker and absorber) MEBT/HWR interface (vacuum, differential pumping, particle migration to HWR) High-current beam acceleration thru HWR and SSR1 –Loss of RFQ tails in SC linac –Halo generation by beam space charge Extinction for the removed bunches better than –10 -4 – specified by the PXIE FRS and determined by multi-experiment operation –<10 -9 – as desired by  -to-e experiment (no formal specification) Obtain experience in design and operation of SC proton linac –SSR1 cryomodule will be designed and built by Fermilab, HWR by Argonne System Integration –Interfaces –Machine Protection –LLRF –Controls –Instrumentation –Cryogenics –Team development 2013 XMAC Meeting, Marc Kaducak10

SRF Challenges and Goals SRF challenges: –Need six different cavities optimized for changing velocity (  ) of Protons –Four different frequencies (162.5, 325, 650, 1300 MHz) –Five of these cavities are completely new for Project X (vs 2 for SNS, 1 for CEBAF) –Requires development of seven different styles of cryomodules SRF Overall Goals: –Develop SRF cavities and cryomodules for Project X Develop the cold part of PXIE (to mitigate Project technical risks) Fabricate and test first articles of cavities and cryomodules that are needed in large numbers to mitigate large Project cost/schedule risk Validate performance of key parameters such as Q 0 and gradient –Develop related SRF infrastructure and technology To execute the PX R&D program and later the project –U.S. Industrialization 2013 XMAC Meeting, Marc Kaducak11

SRF Deliverables TypeDeliverablePurpose HWRCryomodulePXIE SSR1CryomodulePXIE SSR2Dressed cavity with coupler, tuner Testing LB650Three(3) dressed cavities Vertical, horizontal testing demonstrating Q 0 of 2 x or larger HB650CryomoduleTesting with cryogenics and RF demonstrating required RF control, FE, Q 0 of 2 x or larger in the CM with reasonable heat loads, and microphonic control on the cryomodule test stand 2013 XMAC Meeting, Marc Kaducak12

Status of Critical Items - SRF 2013 XMAC Meeting, Marc Kaducak

SRF R&D Contribution to PX Technical Readiness SCRF Design Verification, Fabrication, Installation, and Operation at NML, CMTF 1.Superfluid refrigeration systems and leak checks 2.Particle free assembly in field 3.Sub atmospheric pressure control 4.High power RF systems 5.LLRF control of multiple cavities 6.Tuner specification and design verification (moving parts) 7.Instrumentation development 8.Lorentz force and microphonics compensation 9.Beam Loading 10.Dark current, field emission 11.Halo measurement and formation Staff Development Assembly and Testing Infrastructure 2013 XMAC Meeting, Marc Kaducak14

SRF R&D Contribution to PX Cost Risk Reduction End-to-end cryomodule fabrication and testing 1.Verify assumptions about cavity yields 2.Develop cavity fabrication vendors enabling competitive bidding 3.Define and exercise production and testing processes and equipment, thereby verifying capacity and rate 4.Verify the Q 0 and heat loads of CW cavities, which dominate the Project X cryogenic heat load and therefore the cryoplant cost 5.Exercise the collaboration with India to enable substantial in-kind contributions Potential opportunities to exploit: 1.Annealing half cells prior to welding – no 800°C bake after EP 2.Cavity N 2 treatment – potential factor of 2 increase in Q 3.Barrel polishing – potential elimination of chemical processing 2013 XMAC Meeting, Marc Kaducak15

Other R&D and Studies Development of target system capable of accommodating beam power in the range of MW. Study remote handling systems and target lifetimes. International effort with LBNE and others (RaDIATE – Radiation Damage In Accelerator Target Environments). Development of an H- injection system capable of accepting extended beam pulses from the Project X linacs, for injection into the Booster or Recycler (see I. Kourbanis and D. Johnson talks) 1) H- Injection system in Recycler. R&D going on especially with rotating foils and new foil materials. Follow the progress with laser stripping in SNS 2) New 53 MHz RF system in both MI and RR. Have finalized a cavity design have built a mock up cavity working towards a prototype. 3) Second harmonic RF for both MI and RR. Have a preliminary cavity design based on the new 53 MHz cavity. 4) Gamma-t jump system for transition crossing in MI. Have a design and have identify places for the quad installation in MI. 5) e-cloud mitigation. Continuing the e-cloud studies/measurements in MI. Based on our coating experience we are going to estimate the amount of effort needed to in situ coat the MI pipe with TiN XMAC Meeting, Marc Kaducak16

Schedule for Critical Technology Items (TRL<6) 2013 XMAC Meeting, Marc Kaducak17 Also addresses risk for SSR2 Also addresses risk for LB650

Summary Technical risks for accelerator components will be retired primarily through demonstration in PXIE and SRF testing (more details in tomorrow’s talks). R&D will also help refine and validate cost and schedule estimates. List of R&D deliverables and corresponding resource requirements has been submitted to DOE XMAC Meeting, Marc Kaducak18

Backup 2013 XMAC Meeting, Marc Kaducak19

R&D Deliverables and Milestones 2013 XMAC Meeting, Marc Kaducak20

Risk Management Timeline 2013 XMAC Meeting, Marc Kaducak21 We are here as a project But we are overachievers

MEBT SRF Map for Project X HWR SSR1SSR2  =0.6  = MeV 1.3GHz ILC 3-8 GeV GeV RFQ H - LEBT RT (~15m) Pulsed CW * 5 warm and 5 SC doublets. ** All doublets and correctors are warm MeV Technical Risk (PXIE) Project Cost Risk Non-PXIE = 451 cavities/ 62 cryomodules 22

Risk Criteria 2013 XMAC Meeting, Marc Kaducak23 Probability Impact