Asphalt Paving Technical Committee (APT) Proposed revisions to the Asphalt Concrete Sections of the MAG Specifications.

Slides:



Advertisements
Similar presentations
Quality Assurance/Quality Control Plan Evaluation February 16, 2005.
Advertisements

Agenda Introduction Advisory Circular Changes Consultant Selection Procedures Contract Format and Provisions Methods of Contracting and Allowable Costs.
Internal Control–Integrated Framework
+ Multiple Viewpoints, One Voice: Writing and Editing a Comprehensive Self- Study Leanne Owen, Ph.D. Holy Family University.
Ensuring Better Services and Fair Value “Introduction and roadmap to implementation of ISO in Zambia’s water utilities” Kasenga Hara March 2015.
Writing Proposals for Oak Ridge National Laboratory Women-Owned Small Business Day Sonny Rogers Contract Services Group Manager Oak Ridge, TN August 24,
Lunchtime Topics Craig Weise Construction Reform Program Director Lisa Conomy Construction Counsel OSU Office of Legal Affairs.
1 Last update: February 12, 2009 Is Your Selection Process Attracting the Right Consultants? Best Practices, Benefits and Insights to Using a Qualifications.
Procurement and Tendering Presentation to [NAME OF CLIENT] [YOUR NAME] [DATE]
Marcy Mealy Procurement Specialist CDBG Program
Audit Documentation PCAOB Auditing Standard no.3.
Public Private Partnerships P3s What the Public Sector Considers When Selecting the Right Private Partner Jose A. Galan - Division Director Miami-Dade.
Concrete Quality Assurance: How Concrete is Specified and Supplied To Meet Construction Specifications Prepared By: Prof. Marcia C. Belcher Construction.
SAFA- IFAC Regional SMP Forum
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Interstate 81 Bridges over Route 80 Design-Build Project (PIN , D900023) Town of Tully, Onondaga County.
A Look Ahead on Green Building Innovation. Introduction  Industrialization has been coupled with increasing harmful effects to the environment in the.
Using QBS A Qualifications-Based Selection Process Presenters: Ron Brenke, PE - QBS Manager.
Alan Nuzum CEO Skillnets 18 th February 2009 Introduction to Skillnets Formed in 1999 as an independent body under DETE mandate Enterprise-led Board.
Internal Auditing and Outsourcing
ACE, ECCE & EFCA SEMINAR 21 October 2004 New EU Public Procurement Directive: EUROPEAN HARMONISATION OF PROCUREMENT PRACTICES IN THE SECTOR OF THE ENGINEERING.
The Importance of the Qualifications Based Selection (QBS) Process
Emergency Action Plans Miriam Gradie Anderson Planning Specialist 608/ Wisconsin Department of Natural Resources.
Public Works Contracting Marsha Reilly Office of Program Research House of Representatives recommended.
By: Carol Martineau, Acting Assistant Manager, Aircraft Maintenance Division, AFS-301 Date: June 7, 2015 Federal Aviation Administration ASA Conference.
1 FCAP Review Comments and Responses – 05/13/08 Fermilab Contractor Assurance Program Ed Vokoun EG&G Sr. Logistics Manager at Fermilab.
Colorado Springs Utilities Environmental Services Functional Assessment Presentation for the American Public Power Association’s 2001 Engineering & Operations.
Lloyd W. Fernald, D.B.A. Professor Emeritus University of Central Florida Review of Orange County M/WBE Certification Process.
Slide 1 D2.TCS.CL5.04. Subject Elements This unit comprises five Elements: 1.Define the need for tourism product research 2.Develop the research to be.
ISO 9000 & TOTAL QUALITY ISO 9000 refers to a group of quality assurance standards established by the International Organization for Standardization.This.
Visit us at E mail: Tele:
Standards for Internal Control in the Government Going Green Standards for Internal Control in the Federal Government 1.
OPCPR- 03/26/20081 Procurement Under OP/BP 8.0 This presentation will cover…  Organizational and Institutional Support  Simplified Procurement Arrangements.
Chapter 5 Sound Management 1. Sound Management Defined Sound management is a program of production designed to obtain the greatest net return from the.
The BioPreferred SM Federal Procurement Preference Program.
Texas Turnpike Authority Division AASHTO Right of Way & Utilities Committee Conference Wednesday – April 22, 2009.
Pre-Proposal Conference NASA Langley Research Center October 26, 2009.
Report on the Challenges in the Planning and Procurement of Services for the Ceres and van Rhynsdorp Correctional Facilities Portfolio Committee on Correctional.
Safety Stand Down – Together We Will Make the Difference.
Governance Subcommittee James Dobbins, Chair. Dobbins – Governance 13 December 2010 The Summary Mission Statement Foster engagement between the U.S. society.
Alternate Technical Concepts AASHTO Subcommittee on Design July 28, 2010 Columbia, S.C. KATHY HARVEY State Design Engineer Missouri Department of Transportation.
WSDOT Design Build Contracting – an innovative partnership Society of American Military Engineers September 16, 2014 Phil Fordyce, P.E. WSDOT.
HBP Warranties – The Cost Benefit Evaluation Begins By: Jay Goldbaum, P.E. Colorado Department of Transportation Pavement Management and Design Program.
REVISED May 2009STATE MATERIALS OFFICE Goals in this Session To understand:  The Sampling & Testing process  The Project Certification process  The.
Louisville District BUILDING STRONG Selection Success “How to Put Your Best Foot Forward” Chris Karem, P.E. January 2009.
Presented By: Jeffrey T. Folden, P.E. Assistant Chief, Innovative Contracting Division.
Contractor Alternate Design Serving the Public’s Best Interest.
Presented By WVDE Title I Staff June 10, Fiscal Issues Maintain an updated inventory list, including the following information: description of.
ISO Registration Common Areas of Nonconformances.
Evaluate Phase Pertemuan Matakuliah: A0774/Information Technology Capital Budgeting Tahun: 2009.
Housing Element Update Workshop #2 January 28, 2009.
At Lewis Field Glenn Research Center Industry Briefing Solicitation No. NNC04Z70010R Construction Services Contract June 15, 2004.
1 A Seminar On Pharmaceutical Outsourcing A Seminar On Pharmaceutical Outsourcing.
18-1 Copyright © 2016 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill Education.
OMB Circular A-122 and the Federal Cost Principles Copyright © Texas Education Agency
WORKSHOP ON ACCREDITATION OF BODIES CERTIFYING MEDICAL DEVICES INT MARKET TOPIC 9 CH 8 ISO MEASUREMENT, ANALYSIS AND IMPROVEMENT INTERNAL AUDITS.
ICAJ/PAB - Improving Compliance with International Standards on Auditing Planning an audit of financial statements 19 July 2014.
BIMILACI 2007 Partners for Quality Infrastructure: The FIDIC Vision Washington, May 10, 2007 Dr. Jorge Díaz Padilla FIDIC President.
Technology Services – National Institute of Standards and Technology Conformity Assessment ANSI-HSSP Workshop Emergency Communications December 2, 2004.
CMRA WEBINAR ON NEW SPECIFICATIONS AND IMPLEMENTATION JUNE 15 TH, 2010 Recycled Asphalt Shingles in HMA Implementation: A Perspective from Wisconsin.
The Public Tendering and Bidding (招投标) Law of the People's Republic of China Effective since January 1, 2000.
Royal Scientific Society Eng. Nael Almulki. Royal Scientific Society FunctionsAbout RSS RSS was established in 1970 as an independent, not-for- profit.
Small Business and Subcontracting. Subcontracting for Small Business 6 steps to successful subcontracting 6. Report Contractor performance 1. Consider.
NIEP Evaluation PO&A “How-to” Guide and Issue Classification
Quality Management Systems – Requirements
Emulsion Task Force Meeting
Quality Assurance for Emulsified Asphalt Surface Treatments
Update on the Developments in Government Auditing Standards
Interpretations and Code Cases
Prime Factors for Successful Preservation Treatments
General Discussion Conclusions:
Presentation transcript:

Asphalt Paving Technical Committee (APT) Proposed revisions to the Asphalt Concrete Sections of the MAG Specifications

After several years of review and use of the current MAG Specifications for Asphalt Concrete Production and Placement, the local construction and engineering community believes that there are areas in which revisions or replacement are necessary and/or beneficial. After several years of review and use of the current MAG Specifications for Asphalt Concrete Production and Placement, the local construction and engineering community believes that there are areas in which revisions or replacement are necessary and/or beneficial. INTRODUCTION

We recognize that much time and effort has been put into the development of the current specification. We recognize that much time and effort has been put into the development of the current specification. With this in mind, APT has also invested a significant amount of time and research in the proposed changes we are submitting. With this in mind, APT has also invested a significant amount of time and research in the proposed changes we are submitting.

THE PROCESS An independent expert was retained to review the acceptance portions of the current specifications to evaluate the technical aspects and the financial risk of conducting business for the contractor, supplier and owner. An independent expert was retained to review the acceptance portions of the current specifications to evaluate the technical aspects and the financial risk of conducting business for the contractor, supplier and owner.

A subcommittee of members from contracting firms, materials suppliers, engineering firms, and municipal agencies was formed to evaluate the information generated by the consultant. A subcommittee of members from contracting firms, materials suppliers, engineering firms, and municipal agencies was formed to evaluate the information generated by the consultant. THE PROCESS

Each member reviewed the applicable sections of the MAG Specifications and identified sections which needed to be addressed. Each member reviewed the applicable sections of the MAG Specifications and identified sections which needed to be addressed. THE PROCESS

AREAS TO BE ADDRESSED  These specifications are being utilized by various municipalities and agencies which differ significantly in their details and implementation.

AREAS TO BE ADDRESSED  The revisions in the MAG Specifications related to asphalt mix designs for low traffic roadways deviate from local practice and experience.

AREAS TO BE ADDRESSED  The provisions for Quality Control testing include some unreasonable requirements for location of testing, test data evaluation, and remedial or corrective measures.

AREAS TO BE ADDRESSED  The acceptance criteria for production and placement of asphalt concrete mixtures are spread between Sections 321 and 710 and are difficult to follow/interpret.

AREAS TO BE ADDRESSED  Many off-site or similar projects consist of small quantities of materials which would be better evaluated under a different specification.

AREAS TO BE ADDRESSED  There are numerous problems with projects constructed under permit.  Projects dedicated to the City, County, or other final governing agency, discovered that the testing performed at the direction of the Developer is lacking in quantity, type, or quality.  There is no clear-cut requirements for inspection and testing of asphalt concrete produced under this situation, resulting in assured acceptability to the eventual governing agency.

AREAS TO BE ADDRESSED  Industry (owners, architects and engineers) reference or utilize the MAG Specifications for acceptance of materials placed on private or commercial projects.  Many of the provisions of Sections 321 and 710 are unsuitable or inappropriate for this type of construction. However, there are no suitable or widespread alternatives available in the local market.

NEXT STEPS Based on the review performed by the subcommittee over the past two years the committee has worked to rewrite and revise Sections 321 and 710 as well as develop a new section 320. Based on the review performed by the subcommittee over the past two years the committee has worked to rewrite and revise Sections 321 and 710 as well as develop a new section 320. The following are the proposed revisions to the current specifications The following are the proposed revisions to the current specifications

PROPOSED REVISIONS  Separation of the materials requirements section of the specification from the construction and administration portions. This allows the same materials specification to be utilized for multiple construction specifications. It also gathers like information together and simplifies evaluation of asphalt mix designs and materials properties.

PROPOSED REVISIONS  The utilization of ADOT test methods where applicable.  ADOT, and industry, routinely evaluates and updates test methods as technology and industry practice change resulting in a living” specification which is more relevant.  A living specification requires fewer changes in the written specification documents.

PROPOSED REVISIONS  A separate section has been proposed to address the particular issues and requirements of permit, private, and small projects.  Clear-cut requirements for inspection and testing of asphalt concrete produced under this situation. (which should result in its acceptability to the eventual governing agency.)  Intended for use by architects, engineers, and owners for acceptance of materials placed on private or commercial projects.

PROPOSED REVISIONS  The provisions for Quality Control testing have been revised to better reflect industry standards and practice, as well as to ensure adequate testing frequency and accuracy.

PROPOSED REVISIONS  The requirements for certification and qualifications of laboratories and personnel engaged in testing or evaluating asphalt concrete are expanded and clarified.

PROPOSED REVISIONS  A statistical basis for evaluation and acceptance of asphalt concrete production has been provided for use on suitable projects.  In addition, provisions have been added and/or clarified for referee testing and engineering analysis of deficient or questionable material.

ADVANTAGES TO REVISIONS Provides a qualified procedure for administration of deficiencies. Provides a qualified procedure for administration of deficiencies. Specifications promote consistency of administration. Specifications promote consistency of administration. Local engineers can utilize the specific portions that directly apply to their project. Local engineers can utilize the specific portions that directly apply to their project.

ADVANTAGES TO REVISIONS Allows the contractor to work more efficiently with cost effective benefits. Allows the contractor to work more efficiently with cost effective benefits. The proposed materials specification becomes a living document due to the references to local and national test methods and standards The proposed materials specification becomes a living document due to the references to local and national test methods and standards

CONCLUSIONS The committee would like to present all of our proposed revisions. The committee would like to present all of our proposed revisions. For ease of review and understanding, we will present them as individual cases. For ease of review and understanding, we will present them as individual cases. Over the course of the next several meetings we would appreciate the opportunity to submit each specification section (case) along with revision comments for your review. Over the course of the next several meetings we would appreciate the opportunity to submit each specification section (case) along with revision comments for your review.

The following is a list of the technical committee that was assembled to review and edit the current specifications. The following is a list of the technical committee that was assembled to review and edit the current specifications. Donald E Green, P.E. Operations Manager Rinker Materials Syd Anderson, P.E. Engineering Supervisor City of Phoenix Joe Phillips, P.E. Materials Engineering AMEC Earth & Environmental Tom Kennedy, P.E. Quality Control Manager FNF Construction James Carusone Vice President MACTEC Engineering Brian Gallimore President Western States Profiling Donald Cornelison, P.E. Vice President Speedie and Associates Jeff Benedict Sales & Technical Manager Sunland Asphalt Phil Feliz Principal Western Technologies