EGLV – ELECTRIC GAS LIFT VALVE (Field Trial at S181) - THE OPERATOR’S PERSPECTIVE.

Slides:



Advertisements
Similar presentations
Completion Agenda At the end of this presentation, you will be able to: Define completion Describe the process of completion List and define the different.
Advertisements

Total Well Management Lynn Rowlan Beam Pumping Workshop Houston, Texas
New Gas Lift Products & Technology
VSH2 Nitrogen Over Hydraulic Unit
Petroleum technology Pressure Sensor © 2012, all rights reserved Gauges Deployment.
Intelligent Gas Lift Cameron Laing, LETS Limited
Real-Time Gas Lift Optimization
GAS LIFT OPERATION By : Ubet Khoirudin TOTAL E&P INDONESIE.
Feb. 6, ASME/API Gas-Lift Workshop1 Using Chokes in Unloading Gas-Lift Valves by Ken Decker, Decker Technology Cleon Dunham, Oilfield Automation.
Asset Management Optimization using model based decision support Speaker: Francesco Verre SPE Dinner Meeting – 25 th October 2011 – London.
Second Peer Review for New MGI Valves for NSTX-U (Update on Valve Testing) R. Raman, et al. October 29,
KE2 Evaporator Efficiency
GAS PURGE SYSTEMS ‘Manly Hydraulics Laboratory’ 28 th June 2011.
IPO Unloading Valve Technology Developments and The Associated Benefits Alan Brodie, Feb 2011.
ARTIFICIAL LIFT SYSTEMS ® © 2002 Weatherford. All rights reserved. Unloading Water from Oil Wells Using Air.
INTEGRATED PRODUCTION SERVICES Wellhead Management from Day 1 December 11, 2001.
Case History of Gas Lift Conversions in Horizontal Wells in the Williston Basin Authored by Keith Fangmeier, Terry Fredrickson, Steve Fretland, and Lee.
Baker Jardine Petroleum Engineering & Software Gas Lift Diagnostics A New Approach Daniel Lucas-Clements Baker Jardine.
Copyright 2001 SIEP B.V. Gas-Lift Surveillance Tools of the Trade Jim Hall 5 February, 2002 ASME/API Gas-Lift Workshop.
Camcon Oil Limited Ian Anderson, Chief Operating Officer.
Batch Pumping – A New Method to Solve Downhole Liquid Holdup Bill Elmer 2005 Beam Pumping Workshop.
Optimum Performance in Dual Gas-Lift Wells ASME/API/ISO Spring 2004 Gas-Lift Workshop February 10-11, 2004.
ASME – WORK SHOP - KUALA LUMPUR 2003 By:
West of Shetland Gas Lift Case History ASME/API/ISO Gas Lift Workshop – Houston 2004 Gas Lift Design, Installation, and Performance West of Shetland UK.
By: Gatut Widianoko Weatherford Artificial Lift Systems
Problem Wells Break out Session 2006 International Sucker Rod Pumping Workshop Houston, Texas.
An Inductively Coupled Plasma Etcher
Gas Lift Design Philosophy for Chevron’s Subsea Developments
Gas Lift Redesign in Dual Strings Completion
Remote Operation of Gas-lifted Wells John Stewart Shell Technology.
Gaslift Management in PDO Northern Directorate
ASME Gas Lift Workshop Spring 2004 Dual Gas Lift Breakout Session Dual Gas Lift Breakout Session February 10, 2004.
Gas Lift Training Feb 5, 2002 ASME Gas Lift Workshop Mike Johnson, EMPC/Central Engineering-SSE.
© ChevronTexaco 2001 Use of Transient Simulators to Assess Gas Lift Viability for Offshore Angola 2002 North American Gas Lift Workshop SHAUNA NOONAN /
How to Maintain High Producing Efficiency in Sucker Rod Lift Operations Lynn Rowlan.
Nov. 12, Fall ASME/API Gas-Lift Workshop ASME/API Gas-Lift Workshop Using Chokes in Unloading Gas-Lift Valves by Ken Decker, Decker Technology.
2002 Spring ASME/API Gas-Lift Workshop
SURVEILLANCE & OPTIMIZATION PROCESSES ASME/API GAS LIFT WORKSHOP ASME/API Gas Lift Workshop ExxonMobil Production Organization U. S. West Artificial Lift.
Automating Continuous Gas Lift
YIZUMI H Series Die Casting Machine Alshen
Equipment Development for Gas-Lift in Sub-Sea Operations Roger Stinson Product Manager - Gas Lift Schlumberger Completions Systems.
2003 ASME/API GAS-LIFT WORKSHOP Dual Gas Lift – EMEPMI Experience
Installing Plunger Lift in Gas Wells Lessons Learned from Natural Gas STAR from Natural Gas STAR Exploration & Production, Gulf Coast Environmental Affairs.
Petroleum Experts Ltd. Janvier Lissanon
PDVSA INTEVEP Accumulation Process and Phenomena in Chamber Lift Completions Sergio Caicedo ASME/API Gas-Lift Workshop Houston, Texas, Spring 2002.
LAFAYETTE, LA NEW ORLEANS, LA HOUSTON, TX.
PHASE 7 FACILITIES ENGINEERING
Gas Well De-Liquification Workshop Denver, Colorado February 27 - March 1, 2006 Problem Identification, Candidate Selection, & Selection of Artificial.
1 Introduction Background of study Four oil producer wells will be drilled in Berlian East field. Few procedures are designed to cover the well completion.
Copyright February Shell International E & P All Rights Reserved ASME/API Gas-Lift Workshop Sheraton - North Houston Houston, TX February 6 and.
Automating Flow Control on Gas Lift Wells
ARTIFICIAL LIFT METHODS
GLO Offshore South East Asia Steve ‘Gas Lift’ Gossell – MEA Senior Gas Lift Engineer.
By Jayant Sadare Gas-Lift Optimization and Diagnosis by using
Challenges of Offshore Gas Lift Break-out session API/ASME Gas Lift Workshop 4-5 Feb 2009 Wim der Kinderen Senior Production Technologist Shell EP Europe,
API Task Group on GAS LIFT Equipment Chair - Jim Bennett ExxonMobil.
Introduction to Well Completions
Lecture 10 Production Engineering
Gas Lift Design Philosophy for Subsea Developments 2001 European Gas Lift Workshop.
Analysis of Heading in Artificially Lifted Wells
Automated Gaslift Control Pecten Cameroon Company
Parts Wellhead All casing strings, except for liners, are suspended from a wellhead. On a land well or offshore platform the wellhead is just below.
Active Control of Gas Lift Wells Simulation and Experimental Series
Shell Exploration & Production
CHAIR - JIM BENNETT EXXONMOBIL
Gas-Lift Workshop Breakout Session
Installation of New Officers
CHAIR - JIM BENNETT EXXONMOBIL
41st Gas-Lift Workshop Houston, Texas, USA June 3 - 7, 2019
41st Gas-Lift Workshop Houston, Texas, USA June 3 - 7, 2019
Presentation transcript:

EGLV – ELECTRIC GAS LIFT VALVE (Field Trial at S181) - THE OPERATOR’S PERSPECTIVE

Keywords  Cable-less.  Electrically actuated.  Variable lift gas rate.  Remote monitoring and control.  Wireline/Slickline-less.

EGLV’s Field Trial at S181 - Background  Installed in Dec’ 2002 with 2 pods.  Bottom pod failed in Apr’ Top pod remain operational. operational.  Reason of failure – communication modem.  Workover completed in Jul’ pods were installed. installed.

Gas Lift Optimization Cycle - Conventional Takes 2 to 4 months (resource-dependent) to realize optimization opportunities if wireline entry is involved Gather Data - FTS - Well tests - others Gas Lift Redesign - Optimum Injection Depth - Optimum Lift Gas Rate Wireline entry Surface GL control - optimize set point Q vs. I CalibrateWinGLUEmodel

EGLV ‘s Graphical User Interface - Wonderware TRENDING – PARAMETERS vs.TIME EGLV - UNLOADING EGLV - ORIFICE EGLV CONTROL

S181 – Successfully unloaded using Wonderware Tubing press at unloading depth (POD 2) Tubing press at orifice depth (POD 1) Annulus press at orifice depth (POD 1) % valve open at orifice depth (POD 1)

S181 – Gas lift optimization Gas lift flow Tubing press at orifice depth (POD 1) Tubing press at unloading depth (POD 2) Gas Lift has no benefit

S181 – Gas Lift Optimization EGLV uses FBHP vs. gaslift rate instead of Oil Rate vs. gaslift rate % open/gaslift rate FBHP % open/gaslift rate OIL RATE 

Gas Lift Optimization Cycle - EGLV Gather Data - FTS - Well tests - others Gas Lift Redesign - Optimum Injection Depth - Optimum Lift Gas Rate Wireline entry EGLV control - optimize % valve open Q vs. I CalibrateWinGLUEmodel      Near instantaneous optimization of a gas lifted well !!

Other implications to the gas-lift operator  Multi-point injection may be a thing of the past.  Injection pressure is utilized to the maximum.  A wide range of lift gas rate is at the operator’s disposal.  High well deviation is not a factor in spacing of mandrels.

In the pipeline  Refine GUI to facilitate monitoring and optimization  Develop a control algorithm to optimize a EGLV well automatically (synergy with the Production Universe team). automatically (synergy with the Production Universe team).

BACK-UP SLIDES

How does an EGLV work ? Electro-magnetic principle Bi-directional Communication up/down casing Using gas filled annulus for electrical isolation P/T based on strain gauges VMonitor link to office VMonitor S-181 ~ 2 upper pods with "unloading valve" lower pod with "variable orifice" electrical choke

EGLV completion equipment

S181 Well Schematic