The PSI protium gas filling system (status report by Claude Petitjean to the Gatchina collaboration meeting June 14-17) Main components of the PSI gas.

Slides:



Advertisements
Similar presentations
Thomas Härtl, IPP, Measurement of Gas Retention in AUG, WP10-PWI /II/BS, 19. July Measurement of Gas Retention in ASDEX Upgrade - A Technical.
Advertisements

1 Ann Van Lysebetten CO 2 cooling experience in the LHCb Vertex Locator Vertex 2007 Lake Placid 24/09/2007.
31/03/11FV 1 CEDAR from flammable gas safety point of view.
High-Vacuum Technology Course
Center for Materials for Information Technology an NSF Materials Science and Engineering Center Vacuum Fundamentals Lecture 5 G.J. Mankey
Progress and Plan for Superconducting RF Cavity RF Group.
Applications of Vacuum Technology in the NIF Laser System
1 MICE Absorber working group Columbia, 13 June 2003 MICE Hydrogen System. Preliminary HAZOP. Elwyn Baynham, Tom Bradshaw and Iouri Ivaniouchenkov,
MICE Safety System DE Baynham TW Bradshaw MJD Courthold Y Ivanyushenkov.
MICE AFCSWG Safety Review Summary Mary Anne Cummings Dec. 17, 2003 MICE Video Conference.
Status of the SPECTRAP project HITRAP meeting 27 September 2007 by Danyal Winters.
MICE Hydrogen System Implementation Tom Bradshaw Elwyn Baynham Iouri Ivaniouchenkov Jim Rochford.
1 Infrastructure at RAL Iouri Ivaniouchenkov, RAL MICE Collaboration CERN, 29 March 2003.
Matthew Hills Hydrogen System – Piping and Instrumentation Diagram.
MICE Hydrogen System Design Tom Bradshaw Iouri Ivaniouchenkov Elwyn Baynham Columbia Meeting June 2003.
Vacuum, Surfaces & Coatings Group Technology Department Vacuum tests for CLIC module prototypes 6 November 2013 C. Garion2 Outline: Reminder: specification.
MICE hydrogen review System modifications. Relief circuit repair During leak testing of R&D tests, the insulating vacuum would not go lower than
The MICE vacuum system Presented by Mark Tucker at CM-39, 26 June 2014.
Buffer Fluid Reservoirs and equipment. ASME – ANSI – API 610 – API 682.
Some results of vacuum stand investigation.. 1. Restoration of turbopump inlet valve V1 tightness The inlet turbopump valve of the first pump station.
Pollutants in wastewater -- Revisited Ammonia Organic matter Nutrients Pathogens Color Metals and SUSPENDED SOLIDS.
Update on the Gas-panel for the Target Li Ye Mississippi State University M PRad Collaboration meeting (09/13/13)
NFPA 31 Standard for the installation of Oil- Burning Equipment
Steam Turbine power plant
CMS CO2 Test Stand Specifications and Installation Status Erik Voirin Fermilab PPD - Process Engineering Group CMS CO2 Cooling Test Stand1.
PHYSICS 225, 2 ND YEAR LAB VACUUM TECHNOLOGY G.F. West Thurs, Jan. 12.
The SEM and Ion Pumps. UHV Systems UHV – Ultra High Vacuum Pressures of less than 10^-11 mbar Pumps at an “atomic level”
E.Huttel, Vacuum Workshop, ALBA, Sept.05 Forschungszentrum Karlsruhe / ANKA The ANKA Vacuum System S.HermleA.Völker E.HuttelT.Fischböck.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
High-Vacuum Technology Course
Vacuum / cryo links Mechanical design issues Jo van den Brand, Martin Doets Nikhef Cascina March 4,
F. Mazzolini Vacuum Systems for Synchrotron Light Sources Barcelona, September 12– Front-end vacuum system F.Mazzolini.
Matthew Cox VSSLS Workshop Barcelona Sept SLIDE 1 1 Diamond Light Source Vacuum Systems Matthew Cox
PSI - February 3, 20031F. Sergiampietri MEG – PMT cryogenic test: PURPOSES -SYSTEMATIC TEST OF THE PMT’s FOR MEG IN OPERATING CONDITIONS -BUILD AN EVOLUTIVE.
Vacuum Workshop on Vacuum Systems for Synchrotron Light Sources, Barcelona, Vacuum Technology, 12 th and 13 th September 2005 L. Schulz Introduction Pumps.
Cooling of NA62 vacuum system November 11 th, 2014 E. Harrouch, EN-MEF, on behalf of the NA62 Vacuum Team.
G5 Beam Line Vacuum System. G5 Beamline Vacuum System Design  Bakeable and Particulate free to Class 100 Clean Room quality Require Clean room QA and.
1 HIGH ENERGY ACCELERATOR RESEARCH ORGANIZATION KEKB Review Committee/ NAKAI Hirotaka KEK Crab Cavity - Cryogenics - KEKB Crab Cavity Group - presented.
[1] 3D Micromanufacturing Lab. CO 2 INCUBATOR. [2] 3D Micromanufacturing Lab. What is an Incubator In biology, an incubator is a device used to grow and.
Valve Update  Study several stem/seat geometries (Feb)  Demonstrate He II leak tight for 3/8, 1 in. diameter with modest (~ few psi) pressure difference.
NA62 RICH Gas System V2.0 S. Haider PH/DT/DI LHC-Gas-Project.
Hydrogen Control System MJD Courthold TW Bradshaw Y Ivanyushenkov D Baynham.
Lab Activities: Chamber Baking & Mixing Station Flushing Claudio Curtis Dan PPS meeting 22 June, 2011.
Installation of the T600 at Fermilab CSN2, September 22,
Vacuum for DTL G.Vandoni on behalf of the TE/VSC Linac4 team 13 September, 2011G.Vandoni, TE-VSC1 Acknowledgements M.Malabaila, J.Hansen, A.Mongelluzzo,
ME444 ENGINEERING PIPING SYSTEM DESIGN CHAPTER 11: STEAM PIPING SYSTEM (1)
Avogadro’s Hypothesis. If two containers are filled with the same number of gas molecules at the same temperature and pressure, then the two containers.
Vacuum Technology and Components for Cryogenics
1 MICE Hydrogen system Working group mtg – 01/09/14.
Warm Girder UHV Components John Heckman Anthony DiPette Vacuum Group 2/29/2016.
Leak Detection method for Vacuum Systems Alexander Permogorov
DESIGN AND PERFORMANCE OF VACUUM SYSTEM FOR HIGH HEAT FLUX TEST FACILITY Rajamannar Swamy*, Prakash Mokaria, Samir Khirwadkar, Sunil Belsare, M S Khan,
Overview of elliptical cryomodules vacuum system Vacuum Equipment Standardization meeting February 2014 P. Bosland – C. Darve – N. Elias.
1 IPN Orsay / Division Accélérateurs The Spoke cryomodule Vacuum aspects P. DUTHIL on behalf of the IPNO team ESS Lund February 19 th 2013.
Replacing hydride bed with bottle Advantages No risk of diminished bed capacity Following jobs no longer necessary – Move pressure gauge – Replace cracked.
MVD COOLING STATUS COOLING PLANT: -UPDATE of THE HYDRAULIC SYSTEM -INTEGRATION OF THE MVD COOLING CIRCUIT PATHS INSIDE THE PANDA AREA -DEFINITION OF THE.
MVD COOLING STATUS MVD COOLING PROJECT: CHOICE of COOLING FLUID,
Working with Ultra High Vacuum (UHV) Equipment
Installation of the T600 at Fermilab
Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
SABRE PoP Fluid Handling
Proximity Cryogenics P&IDs meeting
Date of download: 10/23/2017 Copyright © ASME. All rights reserved.
Leak Detection Tutorial Work
1 Connect pumping equipment (group) with leak detector to insulation vacuum 1 or 2 pumping groups? connected to SB or CM or both? Which pumping group?
Martin Dommach TDR ART Review, Hamburg, September 14, 2012
Stainless Steel Water Well Casing.
MINI 1A iAquaMax™ Kidney / water removal system
1A iAquaMax™ Kidney / water removal system
Presentation transcript:

the PSI protium gas filling system (status report by Claude Petitjean to the Gatchina collaboration meeting June 14-17) Main components of the PSI gas system: - Alu vessel with TPC, heating jacket used up to 120 C - high vacuum pumping system (dry forevacuum + turbo pump) - main pumping tube with penning gauge and 10 bar valve to UHV recipient - UHV recipient contains: - ionisation gauge (10 -3 to mbar), pirani gauge (<10 -3 mbar) - mass spectrometer (very useful for gas analysis and leak searches) - valves connecting to gas handling system - gas handling system contains: - three 10-liter high pressure stainless steel bottles - two hydride beds for protium storage (capacity 550 & 750 stp liter) - Palladium filter for producing ultra clean protium gas (+1 spare) - Whatman protium generator (from Canadian <1ppm depleted water) - three digital pressure transducers - 2μ gas filter to avoid dust entering the vessel during filling - Zeolite pressurizer (capacity 100 stp liter, used by Gatchina crew only)

Overview of TPC and gas handling in the lab

TURBO 1 bar10 bar MASS SPEC μ beam T P C ALU PRESSURE VESSEL PENNING VACUUM FILTER 2 μ ION GAUGE PIRANI SAFETY FORE VACUUM IN OUT PD FILTER WHATMAN PROTIUM GENERATOR 10 l 550 stp liter 750 stp liter 100 stp liter 10 l SAMPLE VOLUME bar 0-25 bar FILLING LINE N2N2 VACUUM LINE BLEEDOUTIN The MuCap protium gas handling system at PSI HYDRIDE BEDS ZEOLITE BED 10 bar 40 l 12 bar H2OH2O IN OUT 0-50 bar UH VAC CP&CP

lab-photo of the PSI gas handling (status June-10-04)

closeup view of the PSI gas handling system (status June )