Rob Connatser NSS Instrument Work Packages and XLPM.

Slides:



Advertisements
Similar presentations
Project Appraisal Module 5 Session 6.
Advertisements

TITAN Group …….Managing Site Build up for the telecom sector TICS Telecom Projects Consultancy Pvt. Ltd.
Project Selection Overview By Tim Washington September 14 th, 2011.
Roadmap for Sourcing Decision Review Board (DRB)
Develop an Information Strategy Plan
Indicative Business Case
The decision box represents key management decisions and serve as the GATES which delineate phases. The decision can be to proceed, exit, or recycle. More.
Project Management Process. Project Complexity means that: a team of people are needed to supply expertise the work needs to be broken into manageable.
ClosingExecuting/ Controlling ControllingPlanningInitiatingOpportunityAssessment Client AcceptancePlanning ApprovalInitiating ApprovalOpportunity Assessment.
إدارة المشروعات Projects Management
DOE OFFICE OF INDIAN ENERGY Renewable Energy Project Development and Finance Framework: The 5 Step Process 1.
Chistyakova Nataly O.. Project stakeholders The client is the principal party interested in the carrying out of a project and in its successful outcome.
Pre-Project Planning Lessons from the Construction Industry Institute Construction Industry Institute Michael Davis, P. Eng, PMP Ontario Power Generation.
Release & Deployment ITIL Version 3
Software Evolution Planning CIS 376 Bruce R. Maxim UM-Dearborn.
 A project is “a unique endeavor to produce a set of deliverables within clearly specified time, cost and quality constraints”
Initiating and Planning Systems Development projects
Project Management Process Overview
S/W Project Management
OSF/ISD Project Portfolio Management Framework January 17, 2011.
Free Powerpoint Templates Page 1 Free Powerpoint Templates How do we do it? Class 7.
MGT 461 Lecture # 19 Project Initiation Phase (I OF II)
GBA IT Project Management Final Project - Establishment of a Project Management Management Office 10 July, 2003.
Project Management.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
SacProNet An Overview of Project Management Techniques.
Applying Business Process Re-engineering
Management & Development of Complex Projects Course Code MS Project Management Project Life Cycle & PM Process Groups Lecture # 4.
Welcome to Session 3 – Project Management Process Overview
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
THE PROJECT CYCLE By Dr. Peter Quartey (ISSER, Univ. of Ghana)
Chapter 6-1 The Islamic University of Gaza Accounting Information System Managing the Systems Development Life Cycle Dr. Hisham Madi.
Chapter 3 Strategic Information Systems Planning.
Showcase 2002 AIPM Conference1 Aligning Project Outcomes with your Strategic Direction A paper presented by Chris Cartwright Perth August 2002.
Chapter 6: THE EIGHT STEP PROCESS FOCUS: This chapter provides a description of the application of customer-driven project management.
Role of PM in Airport Projects.  What constitutes a Successful Airport Implementation Programme?  Should the Process of Design and Construction of Airports.
1 EMS Fundamentals An Introduction to the EMS Process Roadmap AASHTO EMS Workshop.
Business Analysis. Business Analysis Concepts Enterprise Analysis ► Identify business opportunities ► Understand the business strategy ► Identify Business.
Initiation Project Management Minder Chen, Ph.D. CSU Channel Islands
SOLUTION What kind of plan do we need? How will we know if the work is on track to be done? How quickly can we get this done? How long will this work take.
Investment decision making
Development through partnership Infrastructure Delivery Management Toolkit: 2010 Edition Delivery Process 2: Project Management 1.
The Implementation of BPR Pertemuan 9 Matakuliah: M0734-Business Process Reenginering Tahun: 2010.
What is project management?
Project Management.
Phase One – Project Initiation and Set Up Project Name Your Area Health Service.
An Agile Requirements Approach 1. Step 1: Get Organized  Meet with your team and agree on the basic software processes you will employ.  Decide how.
Advanced Project Management Project Planning Phase Ghazala Amin.
1 Project Management C13PM Session 2 Project Initiation & Definition Russell Taylor Business Department Staff Workroom
Copyright © 2015 John Wiley & Sons, Inc. All rights reserved. Information Technology for Management Chapter 13: Project Management and SDLC Prepared by.
Info-Tech Research Group1 Manage the IT Portfolio World Class Operations - Impact Workshop.
IAEA International Atomic Energy Agency Development of the Basis Document for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
AGRO PARKS “The Policy Cycle” Alex Page Baku November 2014.
Project Management PTM721S
Continuous Improvement Project (A Guideline For Sponsors)
C. What is a Feasibility report
Project life span.
Applying Business Process Re-engineering
TechStambha PMP Certification Training
Phase 2 Tollgate Review Discussion Template
Phase 1 Tollgate Review Discussion Template
Phase 2 Tollgate Review Discussion Template
Phase 1 Tollgate Review Discussion Template
Guidance notes for Project Manager
Phase 1 Tollgate Review Discussion Template
EC Strategy, Globalization, and SMEs
Phase 2 Tollgate Review Discussion Template
Definition of Project and Project Cycle
KEC Dhapakhel Lalitpur
Project Model Otto Husby Cimple AS.
Presentation transcript:

Rob Connatser NSS Instrument Work Packages and XLPM

Decision to move forward Decision to move forward Approved Baseline Design, Cost and Schedule Approved Baseline Design, Cost and Schedule Readiness for “Hot” Commissioning Readiness for “Hot” Commissioning “Hot” Commissioning and Operations “Hot” Commissioning and Operations Accepted instrument Accepted instrument Phase 1 – Preliminary Engineering Design and Baseline Phase 1 – Preliminary Engineering Design and Baseline Phase 2 – Final Engineering Design and Installation Plan Phase 2 – Final Engineering Design and Installation Plan Engineering Review Engineering Review Phase 3 – Construction and Installation Phase 3 – Construction and Installation Phase 4 – Beam Testing and cold Commissioning Phase 4 – Beam Testing and cold Commissioning Safety Systems Review Safety Systems Review

XLPM Project Timeline

Tollgate Zero Tollgate 0 is an optional decision point in a project at which the decision to start the project analysis phase is made. Proposal to analyze an instrument concept.

XLPM Project Timeline

Project Analysis Phase In the project analysis phase, a business idea is assessed from a feasibility and commercial perspective. Stakeholders should be identified. Their expressed and unexpressed requirements and expectations on the potential project and its expected outcome should be collected and analyzed. The resources and the competence needed for the project should be identified. In order to decide whether or not to make these resources available for the potential project, the project's alignment with the organization's business direction should be made clear. The project analysis also includes the preparation of a budget and a time schedule for the project planning phase. This is a basis for the decision to start the project planning phase. The project analysis work should be documented and handed over to the project sponsor as one input for the Tollgate 1 decision. i.e., a concept unit.

XLPM Project Timeline

Tollgate One Business situation Will the potential project and its expected outcome result in a profitable solution in agreement with the organization's business direction, strategies, customer expectations and demands, external regulations and market trends? Project portfolio status Will the expected benefit from the potential project and its expected outcome justify the effects from the project planning phase on resources for the total project portfolio? Project status Does the progress of the project analysis phase prove the potential project's ability to meet requirements on the project outcome and to do so on time and within cost limits? Confidence and commitment Do the parties involved in the project analysis phase, or involved in or affected by the potential project and its outcome, have confidence in the project and are they fully committed to it? Decision to accept/deny an instrument proposal.

XLPM Project Timeline

Planning Phase A team consisting of people from all the competence areas involved carries out the project planning work. During the project planning the project scope is defined, the project goal is formulated, the project organization defined and risks and opportunities assessed. A quality plan for the project is defined to ensure that the project outcome and performance will be aligned with the quality demands expressed by the customer and the organization. Project plans are prepared at a level detailed enough to establish realistic time and cost estimates for the project and ensure proper control over it. Internal and external resources needed in the project are identified and agreements for procurement made. Phase 1: Preliminary Engineering and Design resulting in a set of baseline documents.

XLPM Project Timeline

Tollgate Two The Tollgate 2 decision should be made when the project planning work and business situation give sufficient information for a decision to establish the project. If the decision is delayed, the information gained may not be relevant anymore. The risks involved in terms of money, resources and customer satisfaction will have to determine how detailed the project planning phase must be. Will the expected benefit from the project and its outcome justify its effects on resources? Decision to move forward

Project Execution Phase Phase 2 Final Engineering Design Phase 3 Construction and Installation Phase 4 Beam Testing and Cold Commissioning Engineering Review & Re-baseline

Project Execution Phase “Hot” Commissioning Readiness for “Hot” Commissioning

Decision to move forward Decision to move forward Approved Baseline Design, Cost and Schedule Approved Baseline Design, Cost and Schedule Readiness for “Hot” Commissioning Readiness for “Hot” Commissioning “Hot” Commissioning and Operations “Hot” Commissioning and Operations Accepted instrument Accepted instrument Phase 1 – Preliminary Engineering Design and Baseline Phase 1 – Preliminary Engineering Design and Baseline Phase 2 – Final Engineering Design and Installation Plan Phase 2 – Final Engineering Design and Installation Plan Engineering Review Engineering Review Phase 3 – Construction and Installation Phase 3 – Construction and Installation Phase 4 – Beam Testing and cold Commissioning Phase 4 – Beam Testing and cold Commissioning Safety Systems Review Safety Systems Review Tollgate 1 Tollgate 4 Tollgate 3 Tollgate 2Planning Phase Project Execution: Establishment Project Execution: Realization part 1 Project Execution: Realization part 2 Project Execution: Hand-Over

Decision to move forward Decision to move forward Approved Baseline Design, Cost and Schedule Approved Baseline Design, Cost and Schedule Readiness for “Hot” Commissioning Readiness for “Hot” Commissioning “Hot” Commissioning and Operations “Hot” Commissioning and Operations Accepted instrument Accepted instrument Phase 1 – Preliminary Engineering Design and Baseline Phase 1 – Preliminary Engineering Design and Baseline Phase 2 – Final Engineering Design and Installation Plan Phase 2 – Final Engineering Design and Installation Plan Engineering Review Engineering Review Phase 3 – Construction and Installation Phase 3 – Construction and Installation Phase 4 – Beam Testing and cold Commissioning Phase 4 – Beam Testing and cold Commissioning Safety Systems Review Safety Systems Review Tollgate 1 Tollgate 4 Tollgate 3 Tollgate 2Planning Phase Project Execution: Establishment Project Execution: Realization Project Execution: Hand-Over Tollgate 5

SCALE