CMS – RPC GIF++ G. Pugliese on behalf of the RPC Collaboration 1.

Slides:



Advertisements
Similar presentations
Wang Yi, Tsinghua University SoLID collaboration meeting, Status of MRPC-TOF 1 Wang Yi Department of Engineering Physics Tsinghua University,
Advertisements

Pavia 25/11/2003Davide Piccolo INFN Napoli Status of assembling and Chamber results at HT Pavia 25/11/2003 Davide Piccolo.
COSMIC RAY MUON DETECTION USING SCINTILLATION COUNTER AND WAVELENGTH SHIFTING FIBERS ARUNODAYA BHATTACHARYA VSRP-2009,TIFR,MUMBAI 6/7/09.
Development of high rate RPCs Lei Xia Argonne National Laboratory.
Status of the ATLAS MM project
Status of MRPC-TOF Wang Yi Department of Engineering Physics Tsinghua University, Beijing, China 1.
Status of the LHCb RPC detector Changes with respect to Note cm strips instead of 3 cm (cost optimization) All gaps same size (standardization)
Davide Piccolo - INFN NapoliSIENA maggio 2004 Production and Quality control of RPCs for the CMS muon barrel system Davide Piccolo – INFN Napoli.
Mauro Raggi Status report on the new charged hodoscope for P326 Mauro Raggi for the HODO working group Perugia – Firenze 07/09/2005.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
Status of INO detector R&D B.Satyanarayana TIFR, Mumbai.
Update on Ongoing Tungsten Digital HCAL Beam Tests Erik van der Kraaij CERN LCD.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
RPC STATUS AT PANJAB UNIVERSITY Panjab University, Chandigarh India-CMS Meeting, 28 th July, 2011.
CMS Muon Chambers Long term studies at GIF++ Andrey Marinov On Behalf of Long Term Studies of the CMS Muon Detectors 1.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
RPC R&D status in Bucharest (JRA12-I3HP) Mihai Petrovici - CBM-Meeting, GSI, March 1,2006 Short history SMSMGRPC – Glaverbel Glass Prototype –Construction.
RPC detection rate capability ≈ 1/ρ Float-Glass ( Ω-cm) RPC rate capability < Bakelite( Ω-cm) one. New kind of doped glass was developed.
RPC Upscope : An overview with Indian perspective L. M. Pant Nuclear Physics Division Bhabha Atomic Research Centre L. M. Pant India-CMS Meeting, BARC.
CMS-GRPC status Imad Laktineh for the GRPC-CMS groups.
The RPC Closed loop Gas System Slides from Bianco and Guida.
RPCs of BESIII Muon Identifier  BESIII and muon identifier  R&D  Mass production  Installation Zhang Qingmin Advisor: Zhang Jiawen.
G. Pugliese RPC requests for GIF++ G.Pugliese, N. Zaganidis and I. Pedraza on behalf of the RPC group 1.
1 Semi-Digital Hadronic CALorimeter Prototype planning CIEMAT, Gent, IPNL, LAL, LAPP, LLN, LLR, LPC, Protvino, Tsinghua, Tunis I.Laktineh.
Gap Production for Upscope of the Endcap RPCs Sung Keun Park Korea Detector Laboratory Korea University February 5, 2010 Workshop on the Forward CMS RPC.
ATLAS micromegas activities (MAMMA)
长读出条 MRPC 性能研究 孙勇杰 Key Laboratory of Technology of Particle Detection and Electronics, USTC-IHEP, CAS Center of Particle Physics and Technology, USTC.
MRPC Beam GSI Yongjie Sun University of Science and Technology of China.
Towards a 1m 3 Glass RPC HCAL prototype with multi-threshold readout M. Vander Donckt for the CALICE - SDHCAL group.
R&D for single gap -Use the HARDROC ASICs, SiGe technology (well tested and available) HARDROC : 64-channel, 2-bin readout (3 comparators, 3 thresholds),
Progress on the beam tracking instrumentation Position measurement device Tests performed and their resolution Decision on electronics Summary.
Results from the CMS-RPC tests at CERN Gamma Irradiation Facility Roberto Guida CMS-RPC (Bari, Beijing, Napoli, Pavia, Sofia) Seoul, October 2005.
Radioactive source and cosmic-ray test for the MWPC Davide Pinci on behalf of the Frascati-Roma1 MWPC group.
24/03/99Report to LHCC Referees Muon Group Status Report Outline: Muon Filter - New Geometry - Support System Optimisation Studies - Pad, Strip and Pad/Strip.
Beam Test of a Large-Area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System Vallary Bhopatkar M. Hohlmann, M. Phipps, J. Twigger, A.
CMS GRPC detector& cassette I. laktineh. Concepts Two concepts of RE1/1 detectors were developed : 1- One based on gluing glass plates to have large RPC.
Marcello Abbrescia Muon general meeting, Mon 29-Apr p. 1 R&D on improved RPCs for phase 2 upgrade M. Abbrescia on behalf of the RPC upgrade group.
Marcello Abbrescia RPCs for CMS during Phase II RPC rate capability M. Abbrescia, The dynamic behaviour of Resistive Plate Chambers, NIM A 533 (2004) 7–10.
European DHCAL development European DHCAL development CIEMAT,IPNL,LAL, LAPP,LLR, PROTVINO, SACLAY CIEMAT,IPNL,LAL, LAPP,LLR, PROTVINO, SACLAY Status :
Test on installed RPCs with the gas mixture. Preliminary results. Alessandro Paoloni on behalf of the OPERA RPC Group (Bologna, LNF, LNGS, Napoli, Padova,
Quality Assurance procedures for the construction of ALICE TOF detector VIIIth Workshop on Resistive Plate Chambers and Related Detectors October.
For 2016 RPCWorkshop 1 Charge Distribution dependency on gap thickness of CMS endcap RPC Sung Park, KODEL, Korea Univ On behalf of the CMS RPC group 1.
S. Colafranceschi - Ischia CMS RPC Italia1 CMS RPC studies at ISR Stefano Colafranceschi Laboratori Nazionali Frascati Università di Roma – La Sapienza.
WP 13 Task Develop a complete system of large size RPC (single- gap/multi-gap) with timing capability better than few hundreds ps. This includes.
SDHCAL. outline  SDHCAL concept, validation and construction  Test Beam and technological prototype performance  Perspectives and Conclusion  SDHCAL.
Final results from an extensive aging test on bakelite Resistive Plate Chambers Stefano de Capua University of Rome II “Tor Vergata” and INFN.
The CMS Muon System BAN Yong, Peking University 2006/12/12 IHEP, Beijing, China Outline: CMS-Muon system: introduction China’s contribution to CMS Muon.
NSS2006Shengli Huang1 The Time of Flight Detector Upgrade at PHENIX Shengli Huang PHENIX Collaboration Outlines: 1.Physics motivations 2.Multi-gap Resistive.
RPCs with Ar-CO2 mix G. Aielli; R.Cardarelli; A. Zerbini For the ATLAS ROMA2 group.
S.DusiniOPERA meeting, LNGS May 2003 Cosmic Test Status Reports Remind of test setup Status report Gas and HVOK Strips and ElectronicsOK DAQalmost.
XI Workshop on Resistive Plate Chambers and Related Detectors, INFN, 5-10 February, Aging test of high rate MRPC Wang Yi Department of Engineering.
The Phase-1 Extension of the CMS Endcap RPC System Michael Tytgat on behalf of the CMS Collaboration Outline :  Introduction  RPC Upgrade  Simulation.
WP2 (Detector development) Summary Gabriella Pugliese INFN – Politecnico of Bari.
R & D Status report on INO Naba K Mondal Tata Institute of Fundamental Research Tata Institute of Fundamental Research Mumbai, India.
G. Pugliese Task Preparation for large series production: production protocols of optimised RPC components for easy technology dissemination G.
Imad Laktineh IPN-Lyon On behalf of the CMS muon group
University of Wisconsin
Test Beam Request for the Semi-Digital Hadronic Calorimeter
The European DHCAL status
Results achieved so far to improve the RPC rate capability
Production ad Quality control of RPCs for the CMS muon barrel system
A proposal to equip the high eta muon stations with High Rate GRPC
RPC built a new plastic (peek doped with CB)
10/month is the present production rate 2 FTE + sporadic contributions
To do list production organization and commitments
Conceptual design of TOF and beam test results
Han Jifeng BESIII MUON GROUP IHEP, CAS
Performance of a Multigap RPC prototype for the LHCb Muon System
Update on SoLID-TOF Wang Yi Outline: Conceptual design of SoLID-TOF
Summer 09 Testbeams SDHCAL prototypes
Presentation transcript:

CMS – RPC GIF++ G. Pugliese on behalf of the RPC Collaboration 1

CMS RPC GIF++ June 22, RPC trolleys will be installed in the upstream region: 1.Consolidation for longevity study 2.Upgrade 3.GRPC BEAM Periods MAIN USER: 1 week in July and 2 weeks in August Parasitic user: 1 week in June – 2 in July – 2 in Oct Trolley 2: GRPC Trolley consolidation Trolley 3: upgrade

GIF++ Readiness 3  One old RPC chamber installed since 1 week. Preliminary measurements on gamma rate with several filters and chamber position on-going.  RPC DAQ and monitoring tools under commissioning  On-line and offline software in preparation June 22, 2015G. Pugliese, GMM Humidity Temperature Some concerns:  High temperature inside the bunker. NO conditioning system planned by GIF++ infrastructure: RPC tent & local cooling under studying.  Beam trigger not ready yet.

GAS system 4 RPC Gas system operational 4 lines in the bunker upstream zone : 1 line in the preparation area But NOT YET AVALABLE NOW We are using a temporary line  gas mixer open loop: Shared with ATLAS to use a common system, able to go up to 30 l/h:. -20 l/hours for RPC - 3 l/hour for the analyzer  Gas mixer Close loop: not yet ready (up to 100 l/h )  GAS KILL NOT yet installed

CMS Longevity Study Status 5  Four spare chambers (2 RE4 and 2 RE3) have been qualified in Ghent using the CMS telescope used during the last RE4 production.  Consolidation trolley in GIF++ preparation area: preliminary test done.  Plan to start the test by middle of July as soon as Beam trigger and all tools for monitoring and analysis will be validated. June 22, 2015G. Pugliese, GMM Milestones: 1.Detector performance study vs HV with muon beam with different ABS and without source in the first test beams (in July and August). 2.Integrate an equivalent charge and dose for 10 years of HL-LHC about 1 year of irradiations).

R&D on Bakelite RPC June 22, 2015G. Pugliese, GMM6 New Bakelite panels ready.  20 panels of Bakelite produced in Puricelli firm in April with thicknesses of 2mm, 1.8mm and 1.6 mm and with a resistivity range  cm higher than expected (  cm). We will make a second production in July.  Panels cutted in Riva firm this week.  Four prototypes will build in General Technica under INFN supervision. Small rectangular prototypes with 2.0, 1.8 and 1.6 mm gap thickness. Plan to send them at CERN by the end-July. Cosmic telescope needed to certify the chambers.  Two Trapezoidal chambers RE4-1 geometry will be build in Korea with 2mm and 1.6 mm thick. Plan to send them at CERN in October.

Upgrade R&D (Others) 7 Two prototypes built and tested in Korea (half size of the RE4/1): 1.CMS double gap: 1.6 mm gap thickness with Italian old HPL panels. 2.Multi-gap Gap: 0.8 mm gap thickness with Italian old HPL panels.  Plan: send them at CERN by July for the TestBeam in GIF++ in August. June 22, 2015G. Pugliese, GMM

8 Multi-gap Gap: the size of low resistivity glass is a limitation to build large MRPC (maximum size: 32×30 cm 2 ). A mosaic of MRPC (40 x 50 cm 2 ) have been build and tested by gluing two glasses together in Tsinghua University. Plan: send it at CERN by July for the TB at GIF++ in August. June 22, 2015G. Pugliese, GMM Upgrade R&D (Others)

SPARE 9

Conclusions 10 RUN2 operation started. CMS RPC system fully operational. R&D for Phase 2 upgrade activity is on going on longevity study, iRPC, GRPC, Eco-Gas. GIF++ activity is proceeding well. Plan to have the first Test Beam by middle of July with 4 RPC spare chambers, several GRPC gap and 2 prototypes of improved RPC. June 22, 2015G. Pugliese, GMM

Current monitoring 11 Cabling done, installation of the circuits on the return line of the gaps done,Thanks to colleagues from Georgia In order to monitor the ageing of RPCs installed in GIF++, it is crucial to have a good measurement of the gap dark current. R= 10 kOhmI(uA)= 100* V ( Volts) Range1000 uA ADC0.001μA CAEN main frame0.01μA The next step will be to measure the current with high background.

June 22, 2015G. Pugliese, GMM12 Trapezoid MRPC The trapezoid MRPC consists of four parts and it is readout with single big PCB Dead area is larger 41 cm 58 cm Gas gap: 5×0.25mm 12 strips Strip width: 25~29 mm Normal glassNearly 5 mm width

Trapezoid MRPC Results Trigger : yellow line MRPC signal of 3 neighboring strips: blue; purple; green line When voltage is 7.1 kV, efficiency reaches 90.1%

Trapezoid MRPC Time resolution Working gas : 90% Freon , 5% iso-butane , 5% Sf6

R&D on iRPC: Plan 15 Many groups (KODEL, INFN, Lyon, Beijing…) working on develop and test of improved RPCs chamber and electronics. We have decided to move in these directions: 1.New materials (low resistivity Bakelite, low resistivity glass) 2.New detector configurations (reduced electrode and gap thickness, multigap configuration) 3.New electronics (ATLAS-like, IPNL-OMEGA-Tsninghua )  Important effort will be done at GIF++ this and the next years. June 22, 2015G. Pugliese, GMM

Ghent tests June 22, 2015G. Pugliese, GMM16

Frascati tests June 22, 2015G. Pugliese, GMM17 Preliminary results from Frascati: good efficiency but reduced effective plateau LFN internal note: “a study of HFO-1234ze(1,3,3,3-Tetrafluoropropene as an eco-friendly replacement of RPC detector” INFN 14/14-LNF

R&D on glass RPC: status June 22, 2015G. Pugliese, GMM18 Two-gap GRPC, gas-tight cassette New readout electronics ( < 50 ps)  DAQ system to exploit the timing and position is being developed.  GIF++ test after final selection of the construction method and validated electronics test planned for the end of the year. A new solution to build large GRPC using small pieces of Chinese glass by mechanical fixation with gas-tight cassette. Then glued and assembled GRPC performance will be compared.

PH - DT gas service activity June 22, 2015G. Pugliese, GMM19

To achieve excellent timing -OPTIROC ASIC : 32-channel, high bandwidth preamp (GBWP> 10 GHz), <3 mW/ch, dual time and charge measurement (160 fC-400 pC) jitter < 20 ps rms OMEGA group - 24-ch, TDC of 25 ps time resolution developed by the Tsinghua university will be used -.New PCB with pick-up strips read from both sides is being designed information with the aim to achieve Y-position determination Y= L/2-v*(t 2 -t 1 )/2. Time resolution can be measured: (t 1 +t 2 )- L/v On-detector Strip Off-detector Strip Y Tsinghua IPNL