GSICS web meeting on Planning for Annual GSICS WG meeting Agenda.

Slides:



Advertisements
Similar presentations
GRWG Report Tim Hewison 1 November Outline Status Updates – For Information only –GEO-LEO IR –GEO Solar –Lunar –Archive Re-Calibration Products.
Advertisements

Combining Multiple References GSICS Web Meeting
Brief Update on Product Developments (GRWG) Jo Schmetz 1 on behalf of Tim Hewison 1 and all GSICS Research Working Group (1)EUMETSAT.
Documenting GSICS as an element of the WMO Integrated Global Observing System 16th GSICS Executive Panel, Boulder, May 2015 Item 6 Jérôme Lafeuille.
China Meteorological Administration National Satellite Meteorological Center Training Course on Satellite Meteorology 2012 ) Oct.22-Nov.2 Beijing China.
Report from 16th GSICS Executive Panel, Boulder, May 2015 Presenter (..)
GSICS Coordination Center Update GSICS Executive Panel Meeting 10 6 June 2011 Fuzhong Weng and Bob Iacovazzi, Jr. GSICS Coordination Center.
Global Space-based Inter- Calibration System (GSICS) Progress Report Mitch Goldberg, NOAA/NESDIS GSICS Executive Panel chair.
The Global Space-based Inter- Calibration System Mitch Goldberg, NOAA/NESDIS GSICS Executive Panel chair NOAA/NESDIS.
CGMS-42, May 2014, Guangzhou, China Coordination Group for Meteorological Satellites - CGMS GLOBAL SPACE-BASED INTER-CALIBRATION SYSTEM (GSICS) CGMS-42-WMO-WP22.
Report from JMA 17th GSICS Executive Panel, Biot, 2-3 June 2016 Masaya Takahashi on behalf of Kazumi Kamide Meteorological Satellite Center, Japan Meteorological.
GRWG Agenda Item Towards Operational GSICS Corrections for Meteosat/SEVIRI IR Channels Tim Hewison EUMETSAT 1.
GSICS Data and Products Servers Volker Gärtner (EUMETSAT) For GSICS Data Working Group.
Agency xxx, version xx, Date xx 2016 [update in the slide master] Coordination Group for Meteorological Satellites - CGMS Introduction to GSICS Presented.
GSICS GDWG Report, Toulouse, 9 February GSICS Data Working Group Status Report V. Gaertner CMA, EUMETSAT, JMA, KMA, NOAA/NESDIS, WMO.
June, GSICS Coordination Centre (GCC) Annual Report to the Executive Panel Document #3 Larry Flynn and Manik Bali 2016 GSICS Executive.
2015 GSCIS annual meeting, March, 2015, New Delhi, India 1 GDWG Agenda Item New GSICS Products Masaya Takahashi, JMA CMA, CNES, EUMETSAT, ISRO, IMD,
16-20 March, GSICS Coordination Centre (GCC) Report Larry Flynn and Manik Bali 2015 GSICS Annual Meeting New Delhi, India March 16-20,
2015 GSCIS annual meeting, March, 2015, New Delhi, India 1 GRWG Requirements Summary on Data, Products, and Tools - for GDWG Understanding Masaya.
World Meteorological Organization Working together in weather, climate and water WMO OMM WMO Documenting GSICS as an element of the WMO Integrated.
JMA GDWG Report 1 Masaya Takahashi Meteorological Satellite Center / Japan Meteorological Agency (visiting scientist at EUMETSAT from Mar to Feb.
World Meteorological Organization Working together in weather, climate and water WMO OMM Joint GDWG-GRWG meeting, Daejeon, Rep. South-Korea, March.
Report from 17th GSICS Executive Panel, Biot, 2-3 June 2016 Presenter (..) GSICS-EP-17, Biot, 2-3 June
GSICS Coordination Center Report Fangfang Yu, Fuzhong Weng, Fred Wu and George Ohring NOAA/Center for Satellite Applications and Research 8 April, 2013.
GSICS 2016 – Plenary Session, GDWG Report 1 GDWG Report 2015 / 2016 Peter Miu / Masaya Takahashi CMA, CNES, EUMETSAT, ISRO, IMD, JAXA, JMA, KMA, NASA,
1.Bob Iacovazzi (NOAA) - Road to Pre-operational Phase Presentation 2.All – Discussion & Feedback 3.Tim Hewison (EUMETSAT) – Reminders: Korea, Conference,
2013 GSICS Joint Meeting, Williamsburg VA, USA, March GSICS Collaboration Servers Status: 2013 Peter Miu (EUMETSAT) CMA, CNES, EUMETSAT, ISRO,
Marianne König, Tim Hewison, Peter Miu
GSICS Baseline Review: Tools – e.g. GSICS Bias Plotting Tool
DCC Product Requirements for GSICS Plotting Tool
GSICS Data Management Working Group Report
GDWG Agenda Item: Tools for GRWG activities
GSICS Collaboration Servers a Vehicle for International Collaboration Status 2011 Peter Miu EUMETSAT.
Introducing Me, GSICS, and the UV Sub-Group
Review of EUMETSAT’s GEO-LEO Correction
CMA NSMC, Beijing, China 5-8 March 2012
KMA GDWG Activity Progress Report
Doelling, Wagner 2015 GSICS annual meeting, New Delhi March 20, 2015
Updates on GSICS Operation Plan
Topics & Chairing next Web Meetings
GSICS Data Management and Availability to Users
Lunar Calibration activities
Report of GRWG: Review of Actions & Web meetings
Actions and Recommendations of the Joint Session
Manik Bali, Larry Flynn NOAA/STAR
Masaya Takahashi (JMA), Peter Miu (EUMETSAT) and Ashi Mitra (IMD)
GSICS Data Management and Availability to Users
Combining Multiple References
2b. GSICS Coordination Centre (GCC)
Tim Hewison1 (1) EUMETSAT
GSICS-EP-19, Bangalore, India, 1-2 June 2018
Update on GSICS Product Development
GDWG Joint Meeting Summary and Actions 2017
Requirements on GSICS Plotting Tool to support VISNIR products
Special Issue of the IEEE TGRS on “Inter-Calibration of Satellite Instruments”: 01 January 2019 Report of GRWG: Aims of meeting Review of Actions Proposal.
Technical aspects of the GIRO work: inputs from GRWG
Topics and Chairing next Web Meetings Tim Hewison
Progress toward DCC Demo product
Summary of 2019 GDWG breakout session
Hot summary of the Fourth GSICS Users Workshop
GSICS Server Upgrade - Requirements for New Deliverables
Formation of IR Sub-Group and Reference Selection
Masaya Takahashi Japan Meteorological Agency
GSICS Data Management Working Group Summary and Action Items
10.j. Next GSICS Users Workshop & other Outreach
IASI / AIRS / CRIS cross-calibrations 5a 0:20
JMA Agency Report 2019 Masaya Takahashi, Yusuke Yogo and Kazuki Kodera
Masaya Takahashi Japan Meteorological Agency
2s. Defining GSICS Products and Deliverables
GSICS Documentation Discussion - classification and storage
Presentation transcript:

GSICS web meeting on Planning for Annual GSICS WG meeting Agenda

26 June 2016 Slide: 2 Agenda for Web Meeting Structure of annual GDWG+GRWG meeting Items for agenda Remote access Practical issues Update of GSICS Operations Plan

26 June 2016 Slide: 3 Top Level Meeting Aims – for All #1 Web Meetings, Joint Working Group Meeting & Users' Workshops GSICS Products in General: – Central Product Catalogue – Documentation – Operational Support – Handling Versions – Handling Multiple References – Roadmap for Release of Operational Products – Procedure for Product Acceptance – way forward

26 June 2016 Slide: 4 Top Level Meeting Aims – for All #2 Web Meetings, Joint Working Group Meeting & Users' Workshops GSICS Data and Products Servers: – Requirements for Intermediate Datasets – Requirements for Archiving GSICS Bias Monitoring: – Requirements for web plotting tool – Including radiance-Tb/reflectance conversion in netCDF Instrument Event Logs: – Consolidated Approach from all GPRCs

26 June 2016 Slide: 5 Top Level Meeting Aims – for All #3 Web Meetings, Joint Working Group Meeting & Users' Workshops Interaction with other Activities: – GRUAN workshop – GPM XCAL – GPPA? – IVOS – CLARREO/TRUTHS – ROLO

26 June 2016 Slide: 6 Top Level Aims – for GRWG #1 Web Meetings, Joint Working Group Meeting & Users' Workshops Reflected-Solar Band: – Review of ATBDs – Roadmap to prototype GSICS Products – when/who…? – Reference – MODIS traceability & migration to VIIRS? – Strategy for LEO-LEO GSICS products – Statement on USGS setting up ROLO facility for GSICS Re-Analysis Products: – Review of issues – General strategy – e.g. Reprocessing, versions

26 June 2016 Slide: 7 Top Level Aims – for GRWG #2 Web Meetings, Joint Working Group Meeting & Users' Workshops Infrared: – Strategy for LEO-LEO GSICS Products – Delta Corrections for Multiple references: Metop-A/IASI to Metop-B/IASI migration Handling midnight calibration issue with AIRS+IASI Using NWP as inter-calibration tool – Review of issues

26 June 2016 Slide: 8 Day 1: Monday 5 March 2012 GDWG+GRWG 08:30Registration 10:00OpenWelcomes & Practicalities Status of Fengyun Satellites Reports of Exec, GRWG, GDWG, GCC, Users 13:00Lunch GPRC Reports 16:30Tea Common Issues of GSICS Products Brief for Working Groups 18:30Close

26 June 2016 Slide: 9 Day 2: Tuesday 6 March 2012 GDWGGRWG 08:30Start IR: consolidation, progress towards pre-op, LEO-LEO 10:00Coffee 13:00Lunch 16:00TeaSolar: Results of DCC/Rayleigh baseline algorithms, … 18:00Close

26 June 2016 Slide: 10 Day 3: Wednesday 7 March 2012 GDWGGRWG 08:30StartSolar: Results of Lunar, Development plans, Migration of Reference instruments 10:00Coffee 13:00Lunch Strategy for re-calibrating archive data 16:00Tea 18:00Close

26 June 2016 Slide: 11 Day 4: Thursday 8 March 2012 GDWGGRWG 08:30Start NWP Bias Monitoring 10:00Coffee Microwave Activities Interaction with other Groups 13:00Lunch Review of Outcomes – Actions, etc. 16:00Tea Next Meetings – Web, Users, Annual, Topics, hosts 17:00Close

26 June 2016 Slide: 12 Draft Agenda for GSICS Meeting in Beijing Version: Day 1: Monday 5 March Joint Session 9:00Registration and coffee0:30 10:00JeromeIntroduction & Welcome to new members0:10 10:10CMAWelcome from the leader of NSMC0:05 10:15CMAThe status and future plan of Yengyun(FY) meteorological Satellites0:15 10:30CMAPracticalities0:10 10:40JeromeAgree Agenda & minute-taking0:10 10:50JeromeReport of Exec Panel0:30 11:20TimReport of GRWG: Review of Actions & Web meetings0:30 11:50AleksandarGDWG Report: Review of Actions and Achievements0:15 12:05Peter MiuStatus of the GSICS Data Servers0:15 12:20FangfangReport of GCC: Review of Actions & GCC website structure/content0:15 12:35RobInstrument Events logs0:15 12:50FangfangUser interaction: Feedback from ISCPP & Users' Workshop0:15 13:05Lunch1:00 14:05CMACMA GPRC Report: GSICS activities and strategy plan in CMA 0:15 14:20NOAANOAA GPRC Report0:15 14:35JMAJMA GPRC Report0:15 14:50EUMETSATEUMETSAT GPRC Report0:15 15:05KMAKMA GPRC Report0:15 15:20CNESCNES GPRC Report0:15 15:35TBDIMD/ISRO/Roshydromet/ESA/JAXA/USGS/NIST Reports1:00 16:35Coffee break0:20 16:55TimGSICS Products: Catalogs, Inter-operatibility, Reprocessing, Versions0:20 17:15ScottProduct Acceptance Procedure: The Way Forward0:20 17:35Peter MiuUnified website for GSICS Bias Monitoring + Extra metadata req0:40 18:15ChairsBrief for Working Groups0:20 18:35End

26 June 2016 Slide: 13 Draft Agenda for GSICS Meeting in Beijing Version: Day 2: Tuesday 6 March 2012 GRWG Session 8:30Tim introData and Products Servers - Requirements for archiving0:10IR: consolidation, 8:40Tim introUnified Bias Monitoring - Additional metadata requirements0:30 9:30Tim/Bertrand & FangfangUsing Multiple References: Documenting the difference between IASI on Metop-A and IASI on Metop-B and Diurnal Cycle using AIRS+IASI0:45 10:15Coffee break0:20 10:35Jack XiongMODIS level 1B calibration updates and data product collections0:20 10:55Jack XiongLessons from MODIS calibration and characterization + Traceability Statement for MODIS0:20 11:150:30 11:450:30 12:45Lunch1:15 14:00Tiejun Chang Bias analysis and correction of MetOp/AVHRR IR channel using AVHRR-IASI inter- comparison0:20 14:20Yong zhangvicarious calibration of IR bands in CMA 0:20 14:40All0:30 15:10Ling sun, Jingjing Liu Yuan LiCRCS sites and Global sites calibration 0:20 15:30Coffee break0:20Solar: Results of DCC/Rayleigh baseline algorithms, Results of Lunar, Development plans 15:50Fangfang/FredNOAA's implementation of DCC0:20 16:10Sebastien WagnerEUMETSAT's implementation of DCC0:20 16:30Lin ChenDCC method implementation in FY-3/MERSI 0:20 17:40End