GSICS Coordination Center Update GSICS Executive Panel Meeting 10 6 June 2011 Fuzhong Weng and Bob Iacovazzi, Jr. GSICS Coordination Center.

Similar presentations


Presentation on theme: "GSICS Coordination Center Update GSICS Executive Panel Meeting 10 6 June 2011 Fuzhong Weng and Bob Iacovazzi, Jr. GSICS Coordination Center."— Presentation transcript:

1 GSICS Coordination Center Update GSICS Executive Panel Meeting 10 6 June 2011 Fuzhong Weng and Bob Iacovazzi, Jr. GSICS Coordination Center

2 07 December 2015 Slide: 2 Outline  GCC Progress Since November 2010 Update of GSICS Operation Plan GEO-LEO Baseline Algorithm Implementation Product Quality Assurance Activities  GSICS Procedure for Product Acceptance Implementation GSICS Instrument Event Log Activities GSICS Quarterly GCC Meeting Support: Joint GRWG-VI and GDWG-V Meeting, and GRWG and GDWG Web Meetings  GCC Near-term Goals for 2011

3 07 December 2015 Slide: 3 Post Joint Meeting Update of GSICS Operation Plan  All actions from the Joint GRWG-VI and GDWG-V Meeting posted  Actions now separated by GSICS organizational entity – Exec Panel&WMO, GCC, GRWG, GDWG, and GPRCs (One sheet per entity)  For a given organizational entity, actions are separated by action type  Considering using Google Docs to update the plan

4 07 December 2015 Slide: 4 GEO-LEO Baseline Algorithm Implementation Status Jan07 Jan08 Jan09 Jan10 Jan11 GOES-11 Jun/07 Aug/08 MTSAT-1R Nov/09 FY-2D GOES-12 GOES-13 Meteosat-7/9 FY-2C AIRSIASI MTSAT-2

5 07 December 2015 Slide: 5 MTSAT-1R FY-2C AIRS IASI Nov/09 GOES-10 GOES-8 Aug2003 Jun2007 Aug/08 Meteosat-7 Jun06 GOES-12 Jun/07 Jan07 Jan08 Jan09 Jan10 Jan11 GOES-11 Jun06 Meteosat-8 Aug/08 Jan2004 Oct2004 Jun2005 105W Back Process Plan @ Univ. Wisconsin GEO-LEO Baseline Algorithm Back Processing Plan @ Univ. Wisconsin

6 07 December 2015 Slide: 6 GEO-LEO Baseline Algorithm Back Processing Jan03 Jan04 Jan05 Jan06 Jan07 GOES-10 AIRS UW/CIMSS

7 07 December 2015 Slide: 7  NOAA has two MTSAT-2 water vapor channel SRFs, the original one from the package NOAA received about 5 years ago (black line)  The newer SRF (blue line) is not the same as the original SRF (in black), but the original looks more realistic, as the one in blue has a straight line at the left shoulder position.  The different SRF causes about 0.5K difference at the homogeneous scenes GEO-LEO Baseline Algorithm MTSAT-2 H 2 O Channel SRF? New MTSAT SRF Applied to AIRS Old MTSAT SRF Applied to IASI

8 07 December 2015 Slide: 8 Stray light? GEO-LEO Baseline Algorithm Fengyun-2D: Stray Light and SRF? Non-linear issue?

9 07 December 2015 Slide: 9 GSICS Procedure for Product Acceptance (GPPA) - Current Product Status  Progress of Potential Products in Demonstration Phase GL01.1.0 - GSICS Correction for EUMETSAT SEVIRI IR Channels based on IASI GL02.1.0 - GSICS Correction for MTSAT Imager IR Channels based on AIRS and IASI GL03.1.0 - GSICS Correction for GOES Imager IR Channels based on AIRS and IASI  Achieved flow of near-real time data to GSICS Collaboration Server at EUMETSAT  ATBD and Traceability to SI Standards documents were accepted as of March 3, 2011  Documentation of use of associated radiative transfer models and cal/val supporting measurements under review  Testing by two or more potential users of product  GL01.1.0 and GL03.1.0 - Results under review  GL02.1.0 – Results Due mid-June LL01.1.0 - Patmos-X AVHRR solar reflective channel corrections based on MODIS  Achieved flow of near-real time data to GSICS Collaboration Server at EUMETSAT  Under testing by three or more potential users of product  Submitted ATBD and Traceability to SI Standards documents

10 07 December 2015 Slide: 10 GPPA: Road to Pre-Operational Phase  Collect and disseminate user feedback regarding product's data usability and format [GL02.1.0 and GL03.1.0 late due to reviewer delays]  Examine and remediate the submitted documents (radiative transfer models and cal/val supporting measurements) Who: Product users and GCC Director Due: April 2011 Who: GPAT, product provider, and GCC Director Due: June 2011

11 07 December 2015 Slide: 11 GPPA: Road to Pre-Operational Phase  Collect and disseminate user feedback regarding product's data usability and format  Examine and remediate the submitted documents (radiative transfer models and cal/val supporting measurements) [Under current revision to consolidate into one document for all GEO-LEO IR GSICS Correction products] Who: Product users and GCC Director Due: April 2011 Who: GPAT, product provider, and GCC Director Due: June 2011

12 07 December 2015 Slide: 12 GPPA: Road to Pre-Operational Phase  [Major milestone] Make a consensus decision whether or not to continue the product acceptance process  Complete and submit Section III.3.A (product quality) of the GPAF and submit the product quality document  Examine and remediate the submitted product quality document Who: GPAT and Executive Panel Due: June 2011 Who: Product provider and GCC Director Due: June 2011 Who: GPAT, product provider, and GCC Director Due: August 2011

13 07 December 2015 Slide: 13 GPPA: Road to Pre-Operational Phase  [Major milestone] Make a consensus decision whether or not to continue the product acceptance process  Complete and submit Section III.3.A (product quality) of the GPAF and submit the product quality document  Examine and remediate the submitted product quality document Who: GPAT and Executive Panel Due: June 2011 Who: Product provider and GCC Director Due: June 2011 Who: GPAT, product provider, and GCC Director Due: August 2011

14 07 December 2015 Slide: 14 GPPA: Road to Pre-Operational Phase  [Major milestone] Make a consensus decision whether or not to continue the product acceptance process  Complete and submit Section III.3.A (product quality) of the GPAF and submit the product quality document  Examine and remediate the submitted product quality document Who: Product provider Due: June 2011 Who: Product users and GCC Director Due: June 2011 Who: GPAT, product provider, and GCC Director Due: August 2011

15 07 December 2015 Slide: 15 GPPA: Road to Pre-Operational Phase Enter Pre-Operational Phase – August 2011

16 07 December 2015 Slide: 16 GPPA: Road to Operational Phase  Obtain product feedback from the Executive Panel and remediate product based on this feedback  Complete documents associated with GPAF Sections III.2.C (analysis software documentation), III.2.D (product version control plan), III.3.B (operations and distribution plan), and III.3.C (data user's guide), and submit the documents to the GCC  Examine and remediate the submitted documents (product version control plan, operations and distribution plan, and data user's guide) Who: Product provider Due: November 2011 Who: Product users and GCC Director Due: December 2011 Who: GPAT, product provider, and GCC Director Due: February- March 2012

17 07 December 2015 Slide: 17 GPPA: Road to Operational Phase  Obtain product feedback from the Executive Panel and remediate product based on this feedback  Complete documents associated with GPAF Sections III.2.C (analysis software documentation), III.2.D (product version control plan), III.3.B (operations and distribution plan), and III.3.C (data user's guide), and submit the documents to the GCC  Examine and remediate the submitted documents (product version control plan, operations and distribution plan, and data user's guide) Who: Product provider Due: November 2011 Who: Product users and GCC Director Due: December 2011 Who: GPAT, product provider, and GCC Director Due: February-March 2012

18 07 December 2015 Slide: 18 GPPA: Road to Operational Phase  Obtain product feedback from the Executive Panel and remediate product based on this feedback  Complete documents associated with GPAF Sections III.2.C (analysis software documentation), III.2.D (product version control plan), III.3.B (operations and distribution plan), and III.3.C (data user's guide), and submit the documents to the GCC  Examine and remediate the submitted documents (product version control plan, operations and distribution plan, and data user's guide) Who: Product provider Due: November 2011 Who: Product users and GCC Director Due: December 2011 Who: GPAT, product provider, and GCC Director Due: February- March 2012

19 07 December 2015 Slide: 19 GPPA: Road to Pre-Operational Phase Enter Operational Phase - February-March 2012

20 07 December 2015 Slide: 20 GPPA: Future Plans In the Next Year … All Four Current Potential Products in Pre-Operational Phase New Potential Product Submissions:  GSICS Correction for CMA VISSR IR channels based on IASI  GSICS Correction for EUMETSAT SEVIRI, MTSAT Imager and GOES Imager solar reflective channels based on MODIS  GSICS Correction for MSU/AMSU-A data based on SNO

21 07 December 2015 Slide: 21 GSICS Instrument Event Log Activities: Past Efforts Feedback About Instrument Monitoring and Anomaly Reporting at Joint GRWG-IV/GDWG-III Workshop All GSICS partners shall propose contents of the performance monitoring pages which they intend to display on their own web sites. ACTION GDWG03_06  NOAA has up-and-running monitoring systems for GEO and LEO satellites  Attempts have been made during the course of 2009 to solicit instrument monitoring or anomaly information web sites from members  There has been a lack of response  The GCC would like a way forward for Action GDWG03_06.

22 07 December 2015 Slide: 22 GSICS Instrument Event Log Activities: 17/02/2011 Web Meeting & 25/03/2011 Joint Meeting Clarified that this activity is related to an action on the GSICS Exec Panel from CGMS to "define what should be the key factors that need to be displayed in the GSICS Instrument Monitoring web sites". Resolved the initial requirements for the GSICS instrument event logs The GSICS instrument event logs for a given satellite instrument shall:  Provide sufficient information for the user to Gain awareness of anomalies, maneuvers and other events associated with that instrument Resolve, adapt to and/or mitigate errors in their data processing streams caused by these events  Not overwhelm the user with information that is not understandable (acronyms etc.).  Link to more details such as daily email notifications  Be hosted by each GPRC Action JOINT06_03 - Provision of a draft template for the instrument event log by 31 May 2011

23 07 December 2015 Slide: 23  Each GSICS GPRC will us a web interface to created, archived, and disseminated provide information on instrument event and calibration updates.  Web page structure The front web page for these logs will allow users to link to the satellite and instrument for which they require information The back web pages will allow the users to access information to scheduled and anomalous instrument events and calibration updates that significantly affect data quality  The web pages are to be accessible, at minimum, to GSICS members  The dissemination of instrument information that violates the national export control laws of each participating GSICS member is discouraged GSICS Instrument Event Log Activities: GCC Proposed Concept of Operations

24 07 December 2015 Slide: 24 Satellite/Instrument Event and Calibration Update Logs GEO Satellites GEO Satellite Series #1 (e.g. GOES 10-15) Satellite NameInstrument #1Instrument #2Instrument #N Satellite #1 (e.g., GOES-10)(e.g., Imager)(e.g., Sounder)… Satellite #2 (e.g., GOES-11)(e.g., Imager)(e.g., Sounder)… … Satellite #N (e.g., GOES-15) … (e.g., Imager) … (e.g., Sounder) … LEO Satellite Series #1 (e.g. NOAA-6-14 ) Satellite NameInstrument #1Instrument #2Instrument #3Instrument #N Satellite #1 (e.g., NOAA-6)(e.g., AVHRR)(e.g., HIRS)(e.g., MSU)(e.g., SSU) … Satellite #N (e.g., NOAA-14) … (e.g., AVHRR) … (e.g., HIRS) … (e.g., MSU) … (e.g., SSU) LEO Satellite Series #2 (e.g. NOAA-15-19 ) LEO Sat. Table … GEO Satellite Series #2 (e.g. GOES-16-17 ) GEO Sat. Table … LEO Satellites CLICK Front Page

25 07 December 2015 Slide: 25 GEO Satellite #1 Instrument #1 (e.g. GOES-10 Imager) Event and Calibration Update Log Scheduled Satellite/Instrument Events Event DescriptionData ImpactEvent OutcomeBegin DateEnd Date Event #1Data Impact #1Event Outcome #1BD #1ED #1 Event #2Data Impact #2Event Outcome #2BD #2ED #2 … Event #N … Data Impact #N … Event Outcome #N … BD #N … ED #N CLICK to More Comprehensive Description of Event Example Events: PTC-Patch Temperature Change DC-Decontamination CSP-Change Satellite Position OM-Other Manuever Example Events Outcomes: R-Resolved A-Adapt M-Mitigate (Could put a date of outcome – e.g., R20110417) Example Data Impacts: O-Outage DQD-Data Quality Deterioration Back Page #1

26 07 December 2015 Slide: 26 GEO Satellite #1 Instrument #1 (e.g. GOES-10 Imager) Event and Calibration Update Log Anomalous Satellite/Instrument Events Event DescriptionData ImpactEvent OutcomeBegin DateEnd Date Event #1Data Impact #1Event Outcome #1BD #1ED #1 Event #2Data Impact #2Event Outcome #2BD #2ED #2 … Event #N … Data Impact #N … Event Outcome #N … BD #N … ED #N CLICK to More Comprehensive Description of Event Example Events: AS-Anomalous Shutdown PM-High Radiation AIP-Anomalous Instrument Performance Example Events Outcomes: R-Resolved A-Adapt M-Mitigate (Could put a date of outcome – e.g., R20110417) Example Data Impacts: O-Outage DQD-Data Quality Deterioration NDS-Non-nominal Data Set (e.g., Diagnostic Mode Data Set) Back Page #2

27 07 December 2015 Slide: 27 GEO Satellite #1 Instrument #1 (e.g. GOES-10 Imager) Event and Calibration Update Log Calibration Algorithm/Parameter Updates Update DescriptionData ImpactEvent OutcomeBegin DateEnd Date Update #1Data Impact #1Event Outcome #1BD #1ED #1 Update #2Data Impact #2Event Outcome #2BD #2ED #2 … Update #N … Data Impact #N … Event Outcome #N … BD #N … ED #N CLICK to More Comprehensive Description of Update Example Updates: UCC-Updated Calibration Coefficients URVS-Updated Response vs. Scan angle UDM-Updated Detector Map Example Events Outcomes: R-Resolved A-Adapt M-Mitigate (Could put a date of outcome – e.g., R20110417) Example Data Impacts: O-Outage DQD-Data Quality Deterioration NDS-Non-nominal Data Set (e.g., Diagnostic Mode Data Set) Back Page #3

28 07 December 2015 Slide: 28  Is the list of possible events or updates complete?  Is it possible to create an e-mail notification if significant events or calibration updates occur?  How do we acquire the information? Often this information may be buried in much longer reports that would have to be manually extracted to keep the event/calibration update logs up-to-date  Do we do this for historical instruments, or just moving forward?  Will we be competing with our own operational agencies in providing this service?  Is it even possible to make the event logs private to GSICS Members only, or do we even need this level of privacy? Instrument Event and Calibration Update Logs: Questions, Concerns, and Comments

29 07 December 2015 Slide: 29 GSICS Quarterly Newsletter  GSICS Quarterly Volume 4 Issue 4 and Volume 5 Issue 1 is complete  Volume 5 Issue 2 is under development.  Ideas for upcoming issues include a synopsis of the GSICS plans for development of reflective solar band channels, or the GSICS Procedure for Product Acceptance

30 07 December 2015 Slide: 30 Meeting Support GSICS Meetings  GSICS Joint GRWG-VI and GDWG-V Meeting – March, 2011, Daejeon, Republic of Korea  GSICS Executive Panel IX – Nov. 2010, New Delhi, India  Centra web meetings hosted by EUMETSAT: Two meetings of the GSICS Microwave Sub-Group and three GRWG/GDWG meetings

31 07 December 2015 Slide: 31 Near-term 2010-11 Goals  Implement Procedure for Product Acceptance Shepherd All Four Current Demo Phase Potential Products to Pre-Operational Phase or Beyond Potential Product Submissions  GSICS Correction for CMA VISSR IR Channels based on IASI  GSICS Correction for EUMETSAT SEVIRI, MTSAT Imager and GOES Imager solar reflective channels based on MODIS  GSICS Correction for MSU/AMSU-A data based on simultaneous nadir overpasses  GSICS Baseline Algorithm Continue to coordinate efforts to establish the GSICS baseline algorithm at NOAA GPRC  GSICS Instrument Event Logs Hold a web meeting with the GRWG and GDWG regarding this issue to get feedback on prototype designs  GSICS Quarterly Continue to create and distribute this important link to the GSICS community  GCC Web Site Make changes to GCC web site based on recommendations made at the Joint meeting.  Meeting Support GSICS 3 rd Users Workshop ( 6 September 2011), QA4EO Workshop (18 - 20 October 2011), and GSICS Web Meetings