Presentation is loading. Please wait.

Presentation is loading. Please wait.

CMA NSMC, Beijing, China 5-8 March 2012

Similar presentations


Presentation on theme: "CMA NSMC, Beijing, China 5-8 March 2012"— Presentation transcript:

1 CMA NSMC, Beijing, China 5-8 March 2012
Welcome to 2012 Annual Meeting of GSICS Data and Research Working Groups CMA NSMC, Beijing, China 5-8 March 2012

2 Welcome to 2012 Annual Meeting of GSICS Data and Research Working Groups
Please upload your presentations to the podium laptop Name your presentation according to agenda: as Dayn_session_hhmm_Name_Topic.PPT where n=1 to 4 session=GSICS for joint session, or GRWG or GDWG e.g. Day2_GRWG_0910_Hewison_Multiple_References.ppt These will be uploaded to the GSICS Wiki Unless you prefer for them not to be Centra sessions Tues pm GRWG – Deep Convective Cloud Wed am GRWG – Lunar Calibration – with Tom Stone

3 Top Level Meeting Aims – for All #1
Web Meetings, Joint Working Group Meeting & Users' Workshops Top Level Meeting Aims – for All #1 GSICS Products in General: Central Product Catalogue Documentation Operational Support Handling Versions Handling Multiple References Roadmap for Release of Operational Products Procedure for Product Acceptance – way forward

4 Top Level Meeting Aims – for All #2
Web Meetings, Joint Working Group Meeting & Users' Workshops Top Level Meeting Aims – for All #2 GSICS Data and Products Servers: Requirements for Intermediate Datasets Requirements for Archiving GSICS Bias Monitoring: Requirements for web plotting tool Including radiance-Tb/reflectance conversion in netCDF Instrument Event Logs: Consolidated Approach from all GPRCs

5 Top Level Meeting Aims – for All #3
Web Meetings, Joint Working Group Meeting & Users' Workshops Top Level Meeting Aims – for All #3 Improving interaction within GSICS Removing barriers to communication Interaction with other Activities: GRUAN workshop GPM XCAL – GPPA? IVOS CLARREO/TRUTHS ROLO

6 Introductions Round Table Name Affiliation Interests

7 Top Level Aims – for GRWG #1
Web Meetings, Joint Working Group Meeting & Users' Workshops Top Level Aims – for GRWG #1 Reflected-Solar Band: Review of ATBDs Roadmap to prototype GSICS Products – when/who…? Reference – MODIS traceability & migration to VIIRS? Strategy for LEO-LEO GSICS products Statement on USGS setting up ROLO facility for GSICS Re-Analysis Products: Review of issues General strategy – e.g. Reprocessing, versions

8 Top Level Aims – for GRWG #2
Web Meetings, Joint Working Group Meeting & Users' Workshops Top Level Aims – for GRWG #2 Infrared: Strategy for LEO-LEO GSICS Products Delta Corrections for Multiple references: Metop-A/IASI to Metop-B/IASI migration Handling midnight calibration issue with AIRS+IASI Using NWP as inter-calibration tool Review of issues

9 Top Level Aims – for GDWG #1
Web Meetings, Joint Working Group Meeting & Users' Workshops Top Level Aims – for GDWG #1 Define strategy for GSICS Products Catalog Define configuration of THREDDS Servers Create template for GEO-LEO netCDF files Development plan for Instrument Event Logs Discuss Automatic Distribution of GSICS Products Agree Tracking Tool for GSICS Operations Plan actions

10 Day 1: Monday 5 March 2012 9:00 Registration and coffee 0:30 10:00
Tim/Aleksandar Introduction & Welcome to new members 0:10 10:10 Naimeng Lu Welcome from the leader of NSMC 0:05 10:15 Peng Zhang The status and future plan of Yengyun(FY) meteorological Satelltes 0:15 10:30 CMA Practicalities 10:40 Tim+Aleksandar Agree Agenda & minute-taking 10:50 Jerome Report of Exec Panel and WMO guidance 11:20 Tim Report of GRWG: Review of Actions & Web meetings 11:50 Aleksandar GDWG Report: Review of Actions and Achievements 12:05 Peter Miu Status of the GSICS Data Servers 12:20 Fangfang Report of GCC: Review of Actions & GCC website structure/content 12:35 Rob Instrument Events logs 12:50 User interaction: Feedback from ISCPP & Users' Workshop 13:05 Lunch 1:00 14:05 CMA GPRC Report: GSICS activities and strategy plan in CMA 14:20 NOAA NOAA GPRC Report 14:35 JMA JMA GPRC Report 14:50 EUMETSAT EUMETSAT GPRC Report 15:05 KMA KMA GPRC Report 15:20 CNES CNES GPRC Report + SADE online demo 15:35 TBD NASA/IMD/ISRO/Roshydromet/ESA/JAXA/USGS/NIST Reports 16:35 Coffee break 0:20 16:55 GSICS Products: Catalogues, Inter-operability, Reprocessing, Versions 17:15 Scott Product Acceptance Procedure: The Way Forward 17:35 Unified website for GSICS Bias Monitoring + Additional metadata requirements 0:40 18:15 Chairs Brief for Working Groups 18:35 End 18:30 Departure for Ice-breaker and Welcome Reception 2:30

11 Day 2: Tuesday 6 March 2012 - am GDWG Breakout GRWG Session 8:30
0:10 Tim intro Data and Products Servers - Requirements for archiving 8:40 0:30 Unified Bias Monitoring - Additional metadata requirements 9:10 Aleksandar Opening Remarks Tim Hewison + Bertrand Fougnie Using Multiple References: Documenting differences between Metop-A/IASI and Metop-B/IASI 0:20 9:20 Review of the GCC and GPRC Web Sites 0:55 9:30 Fangfang Using Multiple References: Diurnal Cycle using AIRS+IASI 10:15 9:50 All Towards Operational GEO-LEO IR Products Coffee break 10:20 10:35 Peter GSICS Product Plotting Software 0:50 10:40 Jack Xiong MODIS level 1B calibration updates and data product collections 11:25 GSICS Data and Product server directory structure and THREDDS configuration 11:00 Lessons from MODIS calibration and characterization + Traceability Statement for MODIS 12:15 Na Xu, Min Min, Yuan Li GSICS Data Management and Sharing 11:20 Inter-calibration of IR sounders 11:30 Discussion 0:40 12:45 Lunch 1:15

12 Day 2: Tuesday 6 March 2012 - pm GDWG Breakout GRWG Session 12:45
Lunch 1:15 14:00 Peter GSICS Documentation Storage 0:30 Tiejun Chang Bias analysis and correction of MetOp/AVHRR IR channel using AVHRR-IASI inter-comparison 0:20 14:30 Aleksandar Additions and Modifications to the netCDF and File Naming Conventions 14:20 Yong zhang vicarious calibration of IR bands in CMA 15:00 Guidelines for Creating GSICS netCDF Files 14:40 Bertrand Fougnie IASI cross-cal with AIRS, IASI-B, and CRIS 15:30 All GSICS Strategy for IR LEO/LEO Coffee break 15:50 Automated Distribution of GSICS Products to Users Fangfang/Fred NOAA's implementation of DCC 16:10 Sebastien Wagner EUMETSAT DCC implementation 16:30 All (with GRWG) DCC method implementation in FY-3/MERSI Lin Chen 16:50 Arata Okuyama JMA's solar calibration approach 17:10 Rayleigh scattering improvements 0:10 17:20 Roadmap for GSICS Products for GEO-LEO Solar Channels 0:40 Dave Doelling 18:00 End

13 Day 3: Wed 7 March 2012 am GDWG Breakout GRWG Session 8:30
Combined with the GRWG session Requirements for Recording Instrument Anomalies/Events to Support GSICS Product Validation 0:40 Rob Instrument Event Logs Requirements 9:20 Jerome Making GSICS products more visible: A GSICS Product Access Guide 1:00 9:10 Jack Xiong Using the Moon for sensor calibration inter-comparisons 0:20 9:30 Qiang Guo A New Cross-calibration Approach for Different Thermal Emissive Bands in FY-2 Satellite with On-orbit Lunar Observations 9:50 Arata Okuyama Brief report of GMS-5 lunar calibration by ROLO model 0:10 10:00 Tim/Seb Application of ROLO model to Meteosat/SEVIRI 10:10 Bertrand Fougnie Characterization of calibration sites using Pleiades Images, with a specific focus on Moon 10:20 All Statement of Requirements for Lunar Model Interface Functionality 10:30 Coffee break 10:50 Registering GSICS products in the WMO Information system (WIS) Ling sun, Jingjing Liu, Yuan Li CRCS sites and Global sites calibration Peter Using ISO Metadata Standard to Interface With External Data Discovery Systems 11:10 Inter-comparison methodologies and applications to AVHRR, ETM+, MODIS, and VIIRS 0:30 11:30 Aleksandar More Functional Alternative to GSICS Wiki? 11:40 Rob Roebeling SCIAMACHY/GOME2 as inter-calibration reference 12:00 11:50 Dave Doelling SCIAMACHY-Aqua/MODIS+GEOs 12:10 Strategy for LEO-LEO solar-band inter-calibration 0:35 12:45 Lunch 1:30 1:15

14 Day 3: Wed 7 March 2012 pm GDWG Breakout GRWG Session 12:45 Lunch 1:30
1:15 14:15 14:00 Rob Roebeling EUMETSAT Re-calibration of Meteosat archive using HIRS 0:30 14:30 Arata Okuyama for infrared calibration approach of historical data by using HIRS 0:15 14:45 All Strategy for Re-Analysis products 0:50 15:45 Departure to Beijing Ground Receiving Station 17:15 Visit to Beijing Ground Receiving Station 2:00 19:15 Travel back to hotel 20:45 End

15 Day 4: Thurs 8 March 2012 GDWG Breakout GRWG Session 8:30 0:30
XingMing Liang Using Double Differences in MICROS for Cross-sensor Consistency Check 9:00 Tim Radiance-dependence in NWP results 0:40 0:10 9:40 0:00 9:10 Extending MICROS methodology into reflectance bands 9:20 All GSICS Strategy for NWP Bias Monitoring as inter-calibration tool 0:20 9:50 Songyan Gu Calibration summary for FY-3 Microwave sensors 10:10 Coffee break 10:30 Jerome+Dave CLARREO 11:10 GSICS Calibration Support Segments - Interaction with other groups: GRUAN, ROLO, IVOS, XCAL 11:50 Rob/anyone Instrument Event Logs 12:20 Tim/anyone Update on Microwave Products 12:50 Lunch 1:00 13:50 2012 GSICS Users' Workshop 14:20 Aleksandar Review outcomes of GDWG 14:50 Review outcomes of GRWG & Agree Principles 15:20 15:40 Jerome Topics and Chairing of next web meetings 16:10 Agree actions 16:40 Date and Place of Next meeting 17:00 End


Download ppt "CMA NSMC, Beijing, China 5-8 March 2012"

Similar presentations


Ads by Google