Evaluation Experts Meeting, DG AGRI L4, Brüssel, 23.06.2009 1 The Monitoring- and Evaluation System of the Austrian RDP 07-13 Karl M. Ortner (AWI) Otto.

Slides:



Advertisements
Similar presentations
Jean-Michel Courades, DG AGRI Rural Development Networking and Cooperation
Advertisements

The Implementation Structure DG AGRI, October 2005
Community Strategic Guidelines DG AGRI, July 2005 Rural Development.
EU-Regional Policy and Cohesion Structural Funds and Accession 1 ANNUAL MEETING OF ISPA PARTNERS 2003 FROM ISPA TO COHESION AND STRUCTURAL FUNDS BRUSSELS,
MIRA - WP 2 Observatory of Euro-Med S&T cooperation White Paper Coord. IRD (France) CNRS (Lebanon) MIRA Mediterranean Innovation and Research coordination.
Cyprus Project Management Society
Towards Sustainable Statistical Capacity Building : Uganda’s Experience By John B. Male-Mukasa Executive Director Uganda Bureau of Statistics (UBOS)
RELATIONSHIP BETWEEN THE MANAGING AUTHORITIES AND THE PAYING AGENCIES IN THE MANAGEMENT OF RURAL DEVELOPMENT PROGRAMMES Felix Lozano, Head of.
Results-Oriented Monitoring (ROM)
Enhancing Institutional and Administrative Capacity case: POLAND
The Swedish Rural Network and The European Rural Development Network, ERDN Presentation at the Leader Networking Event LEADER: A Collective Perspective.
The implementation of the rural development policy and its impacts on innovation and modernisation of rural economy Christian Vincentini, European Commission.
FAST-LAIN (Further Action on Sustainable Tourism – Learning Area Innovation Networks) Project Overview ACTION N °: /CIP/10/B/N04S00 T ITLE : Knowledge.
1 NATIONAL TECHNICAL UNIVERSITY OF ATHENS (NTUA) School of Chemical Engineering Unit of Environmental Science and Technology (UEST) Katherine Haralambous.
EU-Regional Policy and Cohesion Structural Funds and Accession 1 SPP BUILDING IMPLEMENTATION CAPACITY Training seminar on evaluation Prague February.
The Hungarian system of ex post and on-going evaluation focusing on Structural Funds Kinga Kenyeres, Evaluation Division6-7 May, 2010 National Development.
Evaluation methods and tools (Focus on delivery mechanism) Jela Tvrdonova, 2014.
INTERIM MEETING/ VIENNA PART 1 THE STATUS of the PROJECT IMPLEMENTATION.
Innovation in the Rural Development Networks Directorate General for Agriculture and Rural Development Matthias Langemeyer & Iman Boot.
SEILA Program and the Role of Commune Database Information System (CDIS) Poverty and Economic Policy (PEP) Research Network Meeting June 2004, Dakar,
LIFE THIRD COUNTRIES Development and Implementation of an Integrated System for the Control and Monitoring of the Urban Wastewater Treatment Plants in.
National Inventory System in the Slovak republic Janka SZEMESOVA Slovak Hydrometeorological Institute Bratislava April 2005, Wissenschaftszentrum,
Essential SNA Project being developed from 2011 to 2013.
Quality assurance / Quality control system for the Greek GHG emissions inventory Yannis Sarafidis, Elena Georgopoulou UNFCCC Workshop on National Systems.
Pilot project – Energy Trade Data Reporting Scheme 1 st Steering Committee Meeting Brussels, 5 October 2010.
Regional Policy European Commission 1 10/17/2015 Wolfgang Petzold DG REGIO 10 September 2004 SFIT meeting on evaluation DG REGIO's Information and Communication.
European Commission Introduction to the Community Programme for Employment and Social Solidarity PROGRESS
process information Coordination of National Statistical Systems Seminar on the Implementation of Fundamental Principles Konrad Pesendorfer.
1 PRESENTATION MECOVI PROJECT. 2 MECOVI is the Spanish acronym for Programme for Improvement of Surveys and Measurement of Living Conditions in Latin.
Ministry of the Environment and Territory Directorate for Development and Environmental Research Ministry of Economy and Finance Department for Development.
Implementation of the 2008 SNA Implementation of the 2008 SNA UNECE recommendations and implementation strategy for EECCA and SEE countries Workshop on.
Monitoring public satisfaction through user satisfaction surveys Committee for the Coordination of Statistical Activities Helsinki 6-7 May 2010 Steve.
I m p a c t Euronatur Conference Bonn, Sept 7th, 2005 impact | policy consulting simone lughofer Achieving Sustainable Rural Development through Partnership.
National Rural Network Poland. Main Objectives  The aim of the National Network of Rural Areas is to support the implementation and evaluation of the.
National Rural Development Network and experiences with Leader Implementation in Slovakia.
Evidence-Based Agricultural and Rural Policy Making: Methodological and Empirical Challenges of Policy Evaluation 122nd EAAE seminar Ancona (Italy), February.
Leader subcommittee meeting- 26/11/ THE CONTACT POINT OF THE EUROPEAN NETWORK FOR RURAL DEVELOPMENT Main tasks of the Contact Point in relation to.
Directorate for Food, Agriculture, and Fisheries 1 ORGANISATION FOR ECONOMIC CO-OPERATION AND DEVELOPMENT ORGANISATION DE COOPÉRATION ET DE DEVELOPMENT.
Analysis of the Impact and Effectiveness of Projects Structural Funds Programme for Malta Presentation of main findings and recommendations Evaluation.
Jean-Michel Courades, DG AGRI F3 European Rural Development Network
PHARE TWINNING CONTRACT BG/2004/IB/TR/02/UE Strengthening the capacity of the Ministry of Transport to manage the Sectoral Operational Programme on Transport.
1 National Strategic Plan for agricultural and rural development
DESCRIPTION OF THE MONITORING AND EVALUATION SYSTEM IN POLAND Monitoring indicators.
DESCRIPTION OF THE MONITORING AND EVALUATION SYSTEM IN POLAND Action Plan and the Two-year NRN Operational Plans.
1 Statistical business registers as a prerequisite for integrated economic statistics. By Olav Ljones Deputy Director General Statistics Norway
European Migration Network National Contact Point Finland.
National Agencies’ contribution to the evaluation of Grundtvig Action and to the National Evaluation Report on Socrates Programme Socrates - Grundtvig.
Interreg IIIB Trans-national cooperation: Budget comparison : 440 million EURO 420 m EURO (Interreg IIC prog.) + 20 m EURO (Pilot Actions)
HOW THE MDGS INCREASED DATA AVAILABILITY AND IMPROVED REPORTING COORDINATION Sara Duerto Valero, UNSD - 9 th July 2012, Bangkok.
Evaluation of Structural Fund Programmes – the Swedish experience Implementation of the mid term evaluation - lessons for the future Maria Eriksson NUTEK.
Statistical Cooperation with ENP-South Twelfth meeting of the Management Group on Statistical Cooperation March 2010 Luxembourg Agenda item 6.1.
Jean-Michel Courades, DG AGRI Rural Development Advisory Group 18 December 2006 Rural Development Networking
Data, Surveys and Performance Monitoring by Mr Ben Freyer Deputy Director, Regional Support Services, DWSSC 22 November 2012 Ministry of Agriculture, Water.
Croatia: Result orientation within the process of preparation of programming documents V4+ Croatia and Slovenia Expert Level Conference Budapest,
1 Recent developments in quality related matters in the ESS High level seminar for Eastern Europe, Caucasus and Central Asia countries Claudia Junker,
"The role of Rural Networks as effective tools to promote rural development" TAIEX/Local Administration Facility Seminar on Rural Development Brussels,
Development Account: 6th Tranche Strengthening the capacity of National Statistical Offices (NSOs) in the Caribbean Small Island Developing States to fulfill.
Priorities in building up statistics in pre-accession countries Barbara Domaszewicz Agriculture Department, Central Statistical Office of Poland Workshop.
W. Schiessl, AGRI E.II.4 Programme management and institutions involved in monitoring and evaluation.
4–6 September 2013, Vilnius, Lithuania High-Level Seminar for Eastern Europe, Caucasus and Central Asia Countries QUALITY FRAMEWORK AT.
Coordination committee meeting – 01/10/2008 Presented by: John Lougheed European Network for Rural Development : Legal framework and structures.
GUIDELINES Evaluation of National Rural Networks
The NRN evaluation process in Poland
Mr. Alper GÜCÜMENGİL Head of Projects Group, TURKSTAT
Communicating Rural Development to Citizens Milan, November 2011 Networking, Communication and Stakeholder engagement Rob Peters, Head of Unit for.
TOWARDS THE CREATION OF A EUROPEAN UNIVERSITY DATA COLLECTION Education and Training Statistics Working Group Luxembourg, 17 November 2010 Peter WHITTEN.
European Commission, DG Environment, Marine Unit
Innovative Financial Instruments for industry
National level Objective:
Presentation transcript:

Evaluation Experts Meeting, DG AGRI L4, Brüssel, The Monitoring- and Evaluation System of the Austrian RDP Karl M. Ortner (AWI) Otto Hofer (BMLFUW)

Evaluation Experts Meeting, DG AGRI L4, Brüssel, Tasks of programme leader  Implementation of monitoring and evaluation system  Setting up and consulting the monitoring committee  Monitoring the quality of programme implementation  Provision of the data base  Annual progress reports  Consulting with EU-Commission  Administration of the evaluation  Contracting evaluation projects  Organization of meetings and networking of evaluators  Contracting supplementary projects (in cooperation with evaluators)  Editing and publishing evaluation reports

Evaluation Experts Meeting, DG AGRI L4, Brüssel, European Commission Programme leader (ministry) Evaluators Information flows Paying agency

Evaluation Experts Meeting, DG AGRI L4, Brüssel, Organisation of the evaluation in A Evaluation coordinator Project leader Project assistence Karl Ortner Evaluators Axis 2 Evaluators Axis 3 Evaluators Leader Evaluators Axis 1 Representatives Axis 1 Representatives Axis 2 Representatives Axis 3 Representatives Leader ÖPUL committee Monitoring committee Programme leader

Evaluation Experts Meeting, DG AGRI L4, Brüssel, Evaluators of Austrian RDP evaluators from 6 organisations Projects -> various institutes Abt. Immissons- u. Klimaschutz 11 measure representatives

Evaluation Experts Meeting, DG AGRI L4, Brüssel, Information flow in the evaluation project Evaluation projects Measure representatives * Evaluation unit in the ministry Evaluation coordinator Research and other projects Project leader* Evaluators Project reports Paying agency

Evaluation Experts Meeting, DG AGRI L4, Brüssel, Tasks of project leader in respect of the ongoing evaluation Provision of data -Applications and payments data (from PA) Input indicators (payments) Output indicators (investments, areas, etc.) -Baseline indicators Official statistics -Tools for data analysis (RDBs, ACCESS, etc.) Commissioning projects to improve implementation and evaluation (research, surveys, handbooks, etc.)

Evaluation Experts Meeting, DG AGRI L4, Brüssel, Decentral data collection online-input into the system of the paying agency at the district offices of the chambers of agriculture etc. of  applications and  payment requests  evaluation data

Evaluation Experts Meeting, DG AGRI L4, Brüssel, Online application form: Modernisation

Evaluation Experts Meeting, DG AGRI L4, Brüssel, Mn Evaluation form Payment forms Other databases Application form Structure of databases ASS FADN...IACS Mn

Evaluation Experts Meeting, DG AGRI L4, Brüssel, Annual coordination meetings Purpose: Clarification of tasks and needs Points of discussion (2009) Report on EU developments, evaluation helpdesk  Report on Rural Development Network  Report on Programme implementation Support by evaluation project leader Evaluation studies Evaluation homepage State of databases  Report by Paying Agency State of databases, evaluation forms Statements by the evaluators and measure representatives Evaluation activities, problems, requirements Statement of the evaluation coordinator Achievements, Tasks in the ongoing year, timetable Monitoring Evaluation

Evaluation Experts Meeting, DG AGRI L4, Brüssel, Evaluation concepts Evaluation concepts by measure how to evaluate the quality, effectiveness and efficiency of the measure? what impact and additional indicators ? what data are required, how obtained ? what analyses, studies are required / planned ? by what time? Estimation of effects what will be the reference situation (without support), how determined / estimated / assumed ? how will indirect effects be estimated / assumed ? how will payments / projects be compared in order to assess their relative efficiency / best practice ?

Evaluation Experts Meeting, DG AGRI L4, Brüssel, Problem areas  Monitoring requirements  Definition of terms  Definition of effects (static or dynamic, project / sector / macro level, time horizon)  Distribution of effects  Reliability of data  Sophistication of estimation methods  Costs and reliability of results  Comparability of results across measures / regions  Aggregation of results, consistency  Conclusions / recommendations

Evaluation Experts Meeting, DG AGRI L4, Brüssel, Need for exchanges  European evaluation network newsletter  Informal meetings of evaluators of particular measures  International workshops of evaluators of particular measures  Workshops of evaluators with common languages -f. i. German „Länder“ and Austria  Seminars of evaluation societies across measures and structural programmes (DeGEval)  Training courses (f.i. EasyECO, European Academy)  European workshops?

Evaluation Experts Meeting, DG AGRI L4, Brüssel, Success factors of the evaluation  evaluation by measure  clear focus, specific methodology  respected specialised research institutes -continuity, flexibility, know-how, infrastructure -motivated evaluators, research background  strong support by -implementing authorities -project leader -research projects -databases and tools  demand by EC, administration, implementing authorities, monitoring committee, research community, general public

Evaluation Experts Meeting, DG AGRI L4, Brüssel, Further information