Upgrade activities DT-LHCb coordination meeting 14 March 2016.

Slides:



Advertisements
Similar presentations
Beam-plug and shielding studies related to HCAL and M2 Robert Paluch, Burkhard Schmidt November 25,
Advertisements

Andrea Paoli AdV 1 st Project Review Cascina, November 3 rd, 2008 IME – infrastructure modifications for environmental noise reduction.
Spectrometer Solenoid Design and Procurement Review Steve Virostek Mike Green Mike Zisman Lawrence Berkeley National Lab MICE Collaboration Meeting October.
MICE RF TEST STAND Major Milestones (2006) –Testing of BURLE 4616 circuit September 2006 –Testing of 4616 circuit with full amplitude and phase control.
Theodore Todorov Pixel mechanics november 8th Inner detector upgrade / IBL Activities on cooling LAPP LAPP team Jacky Ballansat, Patrick.
Scintillating fibre tracker First SHiP Workshop Zurich, 12 June, 2014 Vladimir SHEVCHENKO, on behalf of Kurchatov Institute SciFi group, Moscow, Russia.
18 June 20031Integration Review B. Schmidt Outline: Filter design and basic concept to ensure seismic stability Filter Installation and the required tooling.
VELO workshop, Amsterdam, april ‘00M.Ferro-Luzzi Difficulties with current mechanical design recent FEA results: to obtain sufficient stiffness of center.
Experimental Beampipes: Status and Outlook Ray Veness / AT-VAC For the beampipe team With many thanks to the experiment’s installation and coordination.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
LHCb CO 2 cooling meeting Burkhard Schmidt – February 18,
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
Beam Dump Upgrade Planning Keith Welch 2/5/13. Drivers for Upgrade Historical Problems – Hardware failures Helium system Windows, diffusers Dehumidifiers.
INTEGRATION OF THE CBM SILICON TRACKING SYSTEM U. Frankenfeld for the CBM collaboration supported by BMBF, EU-FP7 HadronPhysics3 and CRISP.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
GIF in EHN1- layout, construction and schedule Adrian Fabich, EN-MEF-LE GIF users meeting, 12 th February 2014.
Cooling R&D at RWTH Aachen Lutz Feld, Michael Wlochal (RWTH Aachen University) CEC Meeting, CERN Lutz Feld, Michael Wlochal (RWTH Aachen University)
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
26 May 2010Hans Postema - CERN Status and plan for the development and construction of CO2 Cooling System for Pixel Upgrade 1.
Revised SPL-study work-plan W. Weingarten 3 May 20101SPL Cavity WG Meeting.
CBM RICH working group GSI, Germany Bergische Universität Wuppertal (BUW), Germany Hochschule Esslingen (HSE), Germany PNPI Gatchina, St. Petersburg, Russia.
Forward Muon Installation and Commissioning Dmitri Denisov Fermilab Director’s review 7/12/1999 Plan Forward muon detectors Mini-drift tubes installation.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005 LHCb Install Meeting 20/04/05 TS / CV / Detector Cooling Installations.
LHCb upgrade cooling Paolo Petagna Meeting on CO 2 Cooling CERN 11 March 2015.
Comment on the LHCb upgrade cooling plan Paolo Petagna Meeting on CO 2 Cooling CERN 11 March 2015.
Workshop Chamonix XV27-January-2006 DivonneMassimiliano Ferro-Luzzi 1 State of LHCb for the Sector Test  Overview  Agreement  Status of –VELO –exit.
The CNGS Target Station By L.Bruno, S.Péraire, P.Sala SL/BT Targets & Dumps Section.
Activities related to Experiments during TS3 and YETS th November, 2015 M. Bernardini, M. Barberan With the support of S. Chemli and Experiments.
BDS: 1 October 13, 2007 BDS KOM EDR planning discussion Andrei Seryi October 13, 2007.
Upgrade projects and APT update DT-LHCb coordination meeting 28 September 2015.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
CO2 cooling in CMS General overview 30 July 20101Hans Postema - CERN.
12/3/2015R. Mountain, Syracuse University LHCb CO2 Cooling EDR2.
Update on Micro Channel Cooling Collaboration Meeting , G. Nüßle.
October 18, Muon Meeting B. Schmidt Outline: Installation schedule under Discussion Status of Integration activities Possible modifications to the.
Overview of DT group activities in LHCb LHCb CERN team retreat, Les Houches Burkhard Schmidt, PH-DT January 13, 2016.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
1. Efficient trigger for many B decay topologies Muon System CALORIMETERS PRS + ECAL+ HCAL RICH1 VERTEX LOCATOR Efficient PID Good decay time resolution.
H. Katajisto RE EDR 10/10/02 Enclosures for the RPC Link Boards Outline Introduction Periphery General Services Components, materials Manufacture, Assembly.
VELO upgrade news 19 January VELO Upgrade Survey  Not yet filled in, but last answers arriving in the next 24 hours....!  Hope to soon appoint.
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
BASIC SKETCH OF ACTIVITIES FOR THE CERN LHCB-RICH TEAM (2012 – 2017) Team composition Present activities and consolidation plans RICH – CERN R&D and Upgrade.
Engineering Design Review: Fibres, Mats and Modules Heidelberg 16 & 17 July Introduction 2.Fibres 3.Fibre Mats 4.Modules 5.Interfaces 6.Test beam.
Tile HCAL status Felix Sefkow CALICE Technical Board Review April 19, 2007.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
CO2 Cooling For the CMS Pixel detector 11 November 20081Hans Postema & Antti Onnela.
LHCb-UT and Velo Upgrade Road to a system EDR in Q June 2015 Bart Verlaat 1.
Power, Cooling, Cables, Simulations of Heat Dissipation Short overview of ongoing work on these points Technical Coordination (Rolf Lindner et al.) Cooling.
Towards the Work-package with LHCb for the LHCb upgrade DT-LHCb coordination meeting 13 January 2015.
1/20 LHCb upgrade, Jeroen van Tilburg Nikhef Jamboree, 14 Dec 2015 Preparing for the LHCb upgrade.
SuperB Integration SuperB Experimental hall. Related topics of Slac D&D activities.
1. Road to the EDR 2 Requirements Safety system Transfer line concept Plant concept design Requirements Evaporator concept and performance Transfer line.
LHCb CO 2 cooling meeting Burkhard Schmidt – May 20,
Plans for the UT Installation LHCb infrastructure workshop February Burkhard Schmidt for the UT group.
SPHENIX Mechanical Don Lynch & Rich Ruggiero April 10, 2014.
CO 2 Cooling Plants for the LHCb upgrade LHCb infrastructure workshop February Burkhard Schmidt With input from Bart Verlaat, Paolo Petagna and Lukasz.
9 December 2011Eddy Jans 0 LHCb-VELO CO 2 cooling plans CO 2 - meeting Present VELO - physics running in LongShutdown1 2013& physics running.
For the CMS Pixel detector
DT-LHCb coordination meeting 18 April 2016
IT-4189 Supply and installation of a cryogenic distribution system
CERN PH-DT Physics Department (PH) Detector Technologies (DT)
Simulated vertex precision
SciFi option for neutrino target tracker
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
update on UT cooling system
TEST PLANS for HL LHC IT STRING
Status of CO2 Cooling tests at CERN for Pixel phase 1
Advanced Research Electron Accelerator Laboratory
For the CMS Pixel detector
Presentation transcript:

Upgrade activities DT-LHCb coordination meeting 14 March 2016

Project contribution of DT to LHCb 10 colleagues (7.6 FTEs), working on a variety of projects. In addition some fellows and students working on LHCb are in DT Work Package summarizing contribution under preparation MARS exercise has been helpful to shape our contribution further 2

VELO and CO 2 cooling Raphael Dumps : Continue work on VELO cooling safety system – reproduce a dummy CO2 distribution line for the detectors hybrids – Analyse: cooling stability, pressure drop, Safety system behaviour +…. Beam test (VELOpix hybrid under vacuum …) – Adapt the VELO telescope for this new functionality, – construction of a light vacuum box for DUT (cooling -20celsius + …..) RF foil leak test stand. – Testing the leak rate of the new RF foil  To be seen with Massi and NIKHEF 3

Integration work for the UT Joao, Olivier,Francois, Burkhard Continuation of the engineering design for components of the UT, including – the UT box and the beam-pipe interface – the frames for stave mounting, taking into account the constraints in relation to alignment  The EDR for the UT box and frames is scheduled for June 6 or 13 this year 4

Prototype box A prototype box is under construction – The dimensions are: x = 2 x 430mm ; y =500mm ; z = 400mm – The main motivation of the prototype is to study technical details of the joints in order to insure tightness, integration of the copper net to ensure Faraday cage behaviour Test two options for the beam-pipe interface 5

Status of the prototype box New autoclave for panel preparation now available at CERN allows for panel preparation under pressure, which provides better results max, width possible is 1m, max length 2.5m, sufficient for UT box 6

Beam Pipe interface based on Polymer Subject of Master thesis of Oscar, who meanwhile finished  The evaluation and optimization of the plug has only started and will continue 7

8 This design has the advantage to be -simpler -less radiation length -better gas tightness  we will evaluate it with the prototype

Scintillating Fibre Tracker Christian, Robert: Fibre R&D, procurement and QC Project management (C. Joram) 9 6 m cleaner LN 3015 AccuScan 6400 cladding Test NI 6009 Fast IO tensioner 50 g unwinding spool 350 mu

Scintillating Fibre Tracker Set-up or X-ray irradiation – Finalise box – Prepare infrastructure (electricity, possibly heat removal from chiller) – Assistance during installation and commissioning of x-ray source Fibre quality assurance during pre-series and main supply phase – Support logistics (unpacking, re-packing, shipping of fibres, update database) – Attenuation length tests. Learn method and perform tests routinely – Fibre diameter scanner. Learn to load and start scanner. – Option: The diameter scanner may be equipped with a bump removal station. Learn to operate this tool. – X-ray irradiation. Learn to load and run x-ray set-up.

RICH / TORCH Didier, Thierry: Coordination of the HPD operation and maintenance in the RICH detectors Dedicated support, advice and supervision for specific RICH upgrade activities: – QE measurements of MaPMT tubes large-size (2”) tubes recently delivered as part of the pre-series. – Preparatory and running activities of MaPMT system tests dedicated high rate laser light illumination. These tests are essential to assess the MaPMT and readout electronics performance in high occupancy conditions. – Preparatory and running activities for beam test campaigns. Coordination and contribution to TORCH activities at CERN. 11

Muon System upgrade  EDR is scheduled for May/June this year  Design work will start this week with CUT student Michal Galka  Early installation (EYETS 2016/2017) for the beam-plug under M2 is considered. Burkhard, Robert, Michal: Simulations have been done to investigate the reduction in occupancy in M2R1: – Change of material from steel (or lead) to tungsten for HCAL and M2 beam-plug – Additional shielding behind HCAL (replace PMT and CW bases by shielding) – Max. possible reduction: -60% -22% (M2 plug) -25%-43% HCAL plug: -25% 12