Jet Propulsion Laboratory California Institute of Technology Exoplanet Exploration Program Analysis Group #8 Kepler Mission Status Kepler Mission Manager:

Slides:



Advertisements
Similar presentations
Calista AVCP Regional Energy Plan. Preliminary Planning and Stakeholder Involvement Resource Inventory and Data Analysis Develop and Review Draft Energy.
Advertisements

Summer Internship Program Outline
Texas Department of Information Resources Presents
K2 Kepler’s Second Mission 1 K2 - a 2-wheel Kepler mission; The second highest peak in the world, a worthy ascent Steve B. Howell NASA Ames Research Center.
Public Interest Energy Research –Natural Gas Program Status Presentation to Air Emissions Advisory Committee May 12, 2005 Philip Misemer California Energy.
IS4799 Information Systems and Cybersecurity Capstone Project
Kepler Martin Still (NASA Ames) 25 April Portals to the Universe: Lessons Learned Meeting - Apr 25, STScI - Martin Still mission duration3.5.
1 LBNL Enterprise Computing (EC) January 2003 LBNL Enterprise Computing.
Rational Unified Process
Senior Review Evaluations (1 of 5) Proposals due: 6 March 2015 Panel evaluations: Week of 22 April 2015 Performance factors to be evaluated will include.
Office of Information Technology (OIT) PROJECT INITIATION DOCUMENTS - BUSINESS CASE, ALTERNATIVE ANALYSIS AND STATEMENT OF WORK (SOW)
IEEE Fellow Program E.Panayırcı IEEE Fellow Committee Member.
Workshop Purpose Paul Hertz April 25, The Importance of Astronomy Science Centers NASA Astronomy Science Centers provide functions for the community:
Implementing a Calibration Management System Cory Otto Principal Metrology Engineer, Boston Scientific 10 October 2012.
TEMPO Mission Project July 23, 2013 Project Manager: Alan Little.
1 Midrange Computing Working Group Process and Goals Background The MRC Working Group Phase I: - Assessment and Findings - Recommendations for a path forward.
Basic Energy Sciences Advisory Committee Meeting March 3, 2010 Overview of the DOE Office of Science Graduate Fellowship Program Julie Carruthers, Ph.D.
MOIMS Reportp. 1 Digital Repository Audit and Certification BOF Goal  Obtain CCSDS / ISO approval of a standard that establishes the criteria that a repository.
SSSC 02/18/2010 P. Marcum Science Utilization Policies SOFIA SCIENCE UTILIZATION POLICIES Pamela M. Marcum SOFIA Project Scientist SSSC Feb 19, 2010.
T. Dawson, TASC 9/11/13 Use of a Technical Reference in NASA IV&V.
1 Community-Based Care Readiness Assessment and Peer Review Team Procedures Overview Guide Department of Children and Families And Florida Mental Health.
GBA IT Project Management Final Project - Establishment of a Project Management Management Office 10 July, 2003.
Jet Propulsion Laboratory California Institute of Technology LBTI Meeting Goals Gary Blackwood Program Manager, Exoplanet Exploration Program Steward Observatory,
LSST CD-1 Review SLAC, Menlo Park, CA November 1 - 3, 2011 The Funding Agency Context for the LSST DESC Steve Kahn.
American Community Survey ACS Content Review Webinar State Data Centers and Census Information Centers James Treat, ACSO Division Chief December 4, 2013.
TE Workshop - October 6, 2011 Review of ABoVE Scoping Study The NASA Terrestrial Ecology Program requested community input on the Arctic-Boreal Vulnerability.
SOFIA 2 nd Generation Instrument Plans & Technology Development Paul Hertz SOFIA Program Scientist & SMD Chief Scientist SOFIA Science Steering Committee.
Welcome to Session 3 – Project Management Process Overview
NGSTNGST ASWG 22 Oct. ASWG Charter & Role  NGST Scientific Goals & Metrics  Refine actual goals and put in DRM √  Refine DRM model assumptions √  Assist.
B. Review Board Charter and ORR Success Criteria Muthu Jeganathan Project Manager, JPL.
1 Node NODE 2.0 Introduction and Background –Dennis Burling Current and Future –Bill Rensmith Technical Talk –Mike Reich.
1 You are a New Member of the JAC; NOW WHAT? As a new Journey-Level Advisory Council (JAC) member, you probably have many questions, including those about.
Stationary and Area Source Committee Update OTC Committee Meeting September 13, 2012 Washington, D.C. Hall of the States 1.
Mars in the Planetary Decadal Survey Steve Squyres Cornell University Chairman, Planetary Science Decadal Survey Steve Squyres Cornell University Chairman,
6/6/08NASA/USRA Management review- SETI TLR - 1 A New SOFIA Science Vision Charter, Progress, and Plans Tom Roellig.
Draft Transition Plan for the Transfer of the Drug Medi-Cal Treatment Program Fourth Series: Stakeholder Meetings Department of Health Care Services Department.
Search Engine Optimization © HiTech Institute. All rights reserved. Slide 1 What is Solution Assessment & Validation?
Carl G. Ray Program Executive Small Business Innovation Research Small Business Technology Transfer SBIRSBIR To increase small business participation.
1 Rita Sambruna Lia LaPiana NASA HQ NASA HQ The Science Definition Team for the astrophysics-focused use(s) of the Telescope Assets.
1 Space Telescope Science Institute JWST S&OC JWST S&OC Contract Peter Stockman TIPS March 20, 2003.
Science Team Objectives K. Jezek and J. Richter-Menge Science Team Co-leads.
Technical Standards NPR Presented to Technical Standards Working Group June 11, 2007.
1 Douglas Hudgins Exoplanet Exploration Program Scientist Presentation to ExoPAG#8, Denver Colorado October 5, 2013.
Response to TAC8 and Annual Review Recommendations John Haines Head of Target Division April 2, 2014.
New Products from NASA’s Software Architecture Review Board
The Quality Enhancement Plan from a SACSCOC Perspective 1 Leadership Orientation for 2016-A Institutions January 27, 2014 Michael S. Johnson Senior Vice.
LISA News from ESA O. Jennrich LISA Project Scientist.
Utilities’ Update on Energy Savings Assistance Program Studies Ordered in D LIOB Meeting August 21, 2013 Sacramento, California.
Course, Curriculum, and Laboratory Improvement (CCLI) Transforming Undergraduate Education in Science, Technology, Engineering and Mathematics PROGRAM.
ANALYSIS PHASE OF BUSINESS SYSTEM DEVELOPMENT METHODOLOGY.
SAS-05-SpecTRM-TeamX- Meshkat 1 Infusing SpecTRM in the TeamX environment Leila Meshkat¹, Kathryn Weiss², Michael Luna¹, Nancy Leveson² 1: Jet Propulsion.
1 Community-Based Care Readiness Assessment and Peer Review Overview Department of Children and Families And Florida Mental Health Institute.
PCOS/PhysPAG Town Hall AAS-HEAD, Monterey Richard Griffiths PCOS Program Scientist April 9, 2013 NASA HQ Perspective.
Project Introduction Spring InSPIRESS Challenge 2 Design an autonomous science payload for the Titan Environmental and Atmospheric Measurement (TEAM)
IPSAG Telecon April 21, 2011 Shaul Hanany. Agenda Greetings ( 5 minutes) Background for IPSAG and connection to PhysPAG and APS (Shaul Hanany, 10 minutes)
The Do’s and Don’ts of Modernization Maine Bureau of Motor Vehicles Deputy Secretary of State Thomas Arnold.
Heliophysics MO&DA Program - November 13, Page 1 Notes from the Heliophysics MO&DA Program STEREO SWG Meeting Chuck Holmes “Director, Heliophysics.
Pavlo Oborski Grants Management Branch Chief
Preparing for the Future: NASA's Planning for the Decadal Survey
CEOS Response to GEOSS Water Strategy
2017/18 SIP Request Process September 2016.
Draft thoughts on selecting LSST DDFs
Updating the Regulation for the JINR Programme Advisory Committees
What is a Learning Collaborative?
Overview of the FEPAC Accreditation Process
Science Policies and Timeline
Configuration Control and the Standard Nuclear Performance Model
Stan Whitcomb LSC meeting Livingston 21 March 2005
Definition of Project and Project Cycle
Project Introduction Spring 2017.
Presentation transcript:

Jet Propulsion Laboratory California Institute of Technology Exoplanet Exploration Program Analysis Group #8 Kepler Mission Status Kepler Mission Manager: Ingolf Heinrichsen Kepler Deputy Project Scientist: Nick Gautier Oct 6, 2013

ExoPlanet Exploration Program Kepler Flight System Status Performed series of reaction wheel tests during the month of August to attempt reactivation of the damaged wheels. Final attempt to control flight system caused freeze-up of wheel and subsequently all attempts to resume the original Kepler mission were abandoned. Flight system was placed into safe “point rest” state, with low fuel consumption and remains stable. All data show good performance and low friction on two remaining wheels. BATC and the project developed pointing scheme using two wheels and thrusters In September started series of tests on the flight system to evaluate performance in 2-wheel mode: –Completed initial pointing and maneuver tests successfully, results are encouraging –Planning to perform Ka-downlink, ecliptic pointing test and photometric test in October 2

Status on Plans for Future Two-Wheel Mission The project received direction from Director, Astrophysics Division, Paul Hertz dated 7/24/13 “Timeline and deliverables for the development of a “two-wheel” Kepler mission”. The memo requests three deliverables: a) a study of the engineering modifications that would be required to conduct science operations with the observatory using only the two remaining healthy reaction wheels for spacecraft attitude control b) a study of the science opportunities for a two-wheel Kepler mission c) a closeout plan for the mission An interim report on item a) and b) is due on 9/27 the final report on all three items on 11/1. Presentation of results to SMD was planned for 10/1, delayed due to government shutdown Released “Call for White Papers: Soliciting Community Input for Alternate Science Investigations for the Kepler Spacecraft” The purpose of this call for white papers is to solicit community input for alternate science investigations that may be performed using Kepler and are consistent with its probable two-wheel performance. 3 ExoPlanet Exploration Program

White Papers 42 white papers submitted, WPs are not proprietary – all public (available at NASA SMD) Several placed in secondary category: –Not relevant –Spacecraft operation ideas –Solar System in nature –Focal plane / enhance photometry (technical assessment) –Four papers required outside expert review (Neptune and 3 Extra-Galactic) Demography –Observed Fields: Observe the nominal Kepler field of view Observe in the Ecliptic Observe elsewhere – either single target(s) or many (single) targets –Major Themes: Exoplanets – Star Clusters – Seismology – Stellar Age (Young stars) – Low-Mass, cool stars - Extra-Gal

ExoPlanet Exploration Program Decision Process Two White Paper Assessment Teams –Science Assessment Team (Lead, Howell ex-officio) Alex Brown, Steve Kawaler, Chas Beichman, Bill Cochran, Bill Chaplin, Martin Still, Nick Gautier, Michael Haas, Jason Rowe –Technical Assessment Team (Lead, Sobeck ex-officio) Marcie Smith, Rob Nevitt, Jon Jenkins, Doug Caldwell, Dwight Sanderfer, John Troeltzsch, Dennis Ebbets, Neil Dennehy, Ken Lebsock Assessment Team Criteria –Science Assessment Team Hi-Impact Science Community readiness / data products SMD astrophysics –Technical Assessment Team Likelihood of success Operational Complexity Cost Review was intended to broadly discriminate among options, not to pick a “winner”, but find mission strategy that maximizes overall science, while meeting technical and programmatic constraints. - Coarse binning: Easy, Medium, Hard

ExoPlanet Exploration Program Two-wheel Mission Design Technical review has found no show stoppers for implementation of a two-wheel mission –Two-wheel pointing system modifications promise adequate performance for high quality science –Need to be careful with observation design to not drive planning and data reduction costs The Kepler Project will recommend the results of the decision process to SMD –Final mission scheme is expected to contain a scientifically solid core mission and broad open time component to allow white paper submitters and the whole community to participate in science return –SMD will decide whether or not to direct the Kepler Project to propose a two-wheel mission to the Senior Review of Operating Missions next year. 6

ExoPlanet Exploration Program Plans for Close-out of Original Kepler Mission and Heritage Archive The original Kepler mission is not over, lots remains to be done! The project is in the process to define the scope and budget for the close-out mission, either stand-alone or in parallel with potential 2-wheel extended mission, including: –Finish pipeline development, decide on final upgrades –Define final processing schedule and related efforts –Define set of heritage products for the Kepler mission to allow maximum scientific exploitation for both exo-planets and astrophysics research –Release and document best and final calibration data for the mission –Prepare and maintain the archive sites at MAST and NExScI 7

ExoPlanet Exploration Program Kepler Science Conference II 8 Conference was threatened by NASA rules for conferences under sequestration. A waiver for the Kepler Science Conference was granted by NASA OCFO in August. Reminder: Registration will close on Oct. 18 th Hope to see you all there!