RPC production and performance Chong Kim Korea university RHIC spin workshop, Seoul National Univ.

Slides:



Advertisements
Similar presentations
Commissioning the PHENIX RPC Forward Trigger Upgrade Michael Daugherity Abilene Christian University for the PHENIX Collaboration.
Advertisements

1 Run 9 PHENIX Goals and Performance John Haggerty Brookhaven National Laboratory June 4, 2009.
1 Dayabay RPC Detector Zhang Jiawen Outline  Motivation  RPC introduce  RPC for Daya Bay  Efficiency and noise  Module structure  Module.
Stations There are six stations of RPCs. They are 1-3 north, and 1-3 south. RPC3SRPC2S RPC1SRPC1N RPC2NRPC3N This document is available at
Status of the LHCb RPC detector Changes with respect to Note cm strips instead of 3 cm (cost optimization) All gaps same size (standardization)
PHENIX Vertex Tracker Atsushi Taketani for PHENIX collaboration RIKEN Nishina Center RIKEN Brookhaven Research Center 1.Over view of Vertex detector 2.Physics.
Muon Tracker Overview The PHENIX Muon Arms detect vector mesons decaying into muon pairs, allow the study of the Drell-Yan process, and provide muon detection.
ATLAS RPC: Cosmic Ray Teststand at INFN Lecce G. Chiodini, M. Bianco, E. Brambilla, G. Cataldi, R. Coluccia, P. Creti, G. Fiore, R. Gerardi, E. Gorini,
Davide Piccolo - INFN NapoliSIENA maggio 2004 Production and Quality control of RPCs for the CMS muon barrel system Davide Piccolo – INFN Napoli.
Performance of the PHENIX Muon Tracking System in Run-2 Ming X. Liu Los Alamos National Lab (for the PHENIX Collaboration) –Detector Commissioning –Detector.
David L. Winter for the PHENIX Collaboration PHENIX Silicon Detector Upgrades RHIC & AGS Annual Users' Meeting Workshop 3 RHIC Future: New Physics Through.
PHENIX RPC in China Li Ye Shouyang Hu Xiaomei LI China Institute of Atomic Energy
The Progress of PHENIX RPC Production in China Shouyang HU Xiaomei LI Shouyang HU Xiaomei LI Science and Technology on Nuclear Data Laboratory China Institute.
RPC STATUS AT PANJAB UNIVERSITY Panjab University, Chandigarh India-CMS Meeting, 28 th July, 2011.
PHENIX Detector Upgrade for Triggering Fast Muons from W-Boson Decays Using RPC Technology Xiaochun He, Georgia State University For PHENIX Collaboration.
Andrew Glenn 4/21/02 Commissioning and Performance of the. Muon Identifier Andrew Glenn (University of Tennessee), for the PHENIX collaboration April APS.
Performance of PHENIX High Momentum Muon Trigger 1.
Observation of W decay in 500GeV p+p collisions at RHIC Kensuke Okada for the PHENIX collaboration Lake Louise Winter Institute February 20, /20/20101.
November 18, 2008 John Haggerty 1 PHENIX In Run 9 John Haggerty Brookhaven National Laboratory.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
Spin J. Lajoie1 The PHENIX Muon Trigger Upgrade Outline: A (Brief) Spin Physics Motivation Antiquark Spin Contribution with W +/- bosons The PHENIX.
NanoPHYS’12 – December 17-19, 2012 K. Nakano, S. Miyasaka, K. Nagai and S. Obata (Department of Physics, Tokyo Institute of Technology) Drift Chambers.
1 Test on RPC Veto Detector Model —— Anticoincidence Detector for Daya Bay Neutrino Exp. Speaker: Jiawen Zhang 5 June 2006.
Barrel RPC Chamber consists of 2 double-gaps, each equipped with a common plane of 96 strips read-out by 6 front-end boards. The two double- gaps have.
Performance of a Large-Area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System Vallary Bhopatkar M. Hohlmann, M. Phipps, J. Twigger,
The W program at PHENIX R. Seidl (University of Illinois and RBRC) for the PHENIX Collaboration Workshop on Parity Violating Spin Asymmetries BNL, April.
Takao Sakaguchi, BNL Run-11 PHENIX Run Coordinator PHENIX Run-11 Report Sakaguchi, RHIC retreat 1 RHIC retreat version.
RPCs of BESIII Muon Identifier  BESIII and muon identifier  R&D  Mass production  Installation Zhang Qingmin Advisor: Zhang Jiawen.
Status summary of RPC R&D for INO ICAL detector B.Satyanarayana, TIFR, Mumbai Satyajit Jena, IIT Bombay, Powai For INO Collaboration.
Gap Production for Upscope of the Endcap RPCs Sung Keun Park Korea Detector Laboratory Korea University February 5, 2010 Workshop on the Forward CMS RPC.
Introduction to High Momentum Trigger in PHENIX Muon Arms RIKEN/RBRC Itaru Nakagawa 中川格 1.
Forward Muon Installation and Commissioning Dmitri Denisov Fermilab Director’s review 7/12/1999 Plan Forward muon detectors Mini-drift tubes installation.
February 13, 2008RPC2007-Mumbai1 RPC Production for Fast Muon Trigger System for Byungsik Hong Korea University for the PHENIX Collaboration.
Progress on the beam tracking instrumentation Position measurement device Tests performed and their resolution Decision on electronics Summary.
PHENIX Measurement of Parity-Violating Single Spin Asymmetry in W Production in p+p Collisions at 500 GeV Stephen Pate (for the PHENIX Collaboration) New.
Performance of the PHENIX Muon Identifier Introduction Calibration with cosmic rays Performance in Au+Au collisions Summary Hiroki Sato, Kyoto University.
Performance of PHENIX High Momentum Muon Trigger.
Muon Tracker Responsibilities This Year South arm commissioning through this year’s run Analysis Software oversight and development North Arm station 2.
First measurement and future prospects for measurements of single spin asymmetries in W production with the PHENIX experiment at RHIC Young Jin Kim for.
PERFORMANCE OF THE PHENIX SOUTH MUON ARM Kenneth F. Read Oak Ridge National Lab & University of Tennessee for the PHENIX Collaboration Quark Matter 2002.
1/27/2016 R.Seidl: status of simulation1 W muon analysis in PHENIX Status of the background understanding, signal, smearing and asymmetries R.Seidl (RBRC)
Test results of Multi-gap RPC Test Chambers for a Digital HCAL  Geometrical design  Test setup  Signal: avalanche mode and streamer mode  Comparison.
10/27/2005J. Lajoie - PANIC '051 The PHENIX Forward Upgrade Topics: A (Brief) Spin Physics Motivation Antiquark Spin Contribution with W +/- bosons The.
Beam Test of a Large-Area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System Vallary Bhopatkar M. Hohlmann, M. Phipps, J. Twigger, A.
PHENIX WEEKLY PLANNING 11/15/2007 Don Lynch. 11/8/2007 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn Going11/30.
Performance of PHENIX High Momentum Muon Trigger.
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL December 13, 2006 Progress from October 3 to November 28, 2006.
Performance and Early Results from the Muon Tracking System of Rusty Towell of Abilene Christian University for the PHENIX collaboration First Joint Meeting.
PHENIX W-Boson Trigger Itaru Nakagawa RIKEN/RBRC On behalf of RPC/MuTrig-FEE Collaboration.
Reduction of Background in Observation of W Decay Using the Forward Vertex (FVTX) detector at PHENIX Abraham Meles New Mexico State University APS April.
Muon Arm Physics Program Past, Present + Future Patrick L. McGaughey Los Alamos National Laboratory Santa Fe June 17, 2003.
Jamaica 11 Jan.8, 2009 Muon Trigger Upgrade at PHENIX RIKEN/RBRC Itaru Nakagawa RIKEN/RBRC Itaru Nakagawa.
October 19, 2007Heavy Ion Meeting1 RPC Upgrade for PHENIX Byungsik Hong Korea University.
The CMS Muon System BAN Yong, Peking University 2006/12/12 IHEP, Beijing, China Outline: CMS-Muon system: introduction China’s contribution to CMS Muon.
Study of polarized sea quark distributions in polarized pp collisions at sqrt(s)=500GeV with PHENIX Oct. 10, 2008 Tsutomu Mibe (KEK) for the PHENIX collaboration.
RPCs for the W measurement in PHENIX Chong Kim Korea University Japan-Korea PHENIX collaboration workshop, Nov. 27, 2012 for the PHENIX collaboration.
Muon Trigger Performance Run12 PP510GeV Sanghwa Park (SNU/RIKEN)
Operation, performance and upgrade of the CMS Resistive Plate Chamber system at LHC Marcello Abbrescia Physics Department - University of Bari & INFN,
(University of Sofia “St. Kliment Ohridski”)
Status of BESIII and upgrade of BESIII
Production ad Quality control of RPCs for the CMS muon barrel system
CMS muon detectors and muon system performance
PHENIX RPC R&D EFFORT Beau Meredith
Conceptual design of TOF and beam test results
Han Jifeng BESIII MUON GROUP IHEP, CAS
RPC Production for Fast Muon Trigger System for
Performance of a Multigap RPC prototype for the LHCb Muon System
11th Pisa meeting on advanced detectors
Presentation transcript:

RPC production and performance Chong Kim Korea university RHIC spin workshop, Seoul National Univ.

Outline A.RPC upgrade B.RPC station 3 status 1.Structure of the station 3 2.Module production and QA 3.Half octants production and QA C.Summary and Perspective RHIC spin workshop, Seoul National Univ.2

RHIC spin workshop, Seoul National Univ.3 RPC 1 RPC 3  RPC upgrade: provide timing & rough position information A. RPC upgrade

B. RPC station 3 status - 1. Structure of the station RHIC spin workshop, Seoul National Univ.4  Detector outline  RPC station 3 is composed of 16 half octants  A half octant composed of 3 RPC modules (type A, B, C)  Each module is a double-gap RPC (independent of type) which satisfies PHENIX requirements RPC3 Station 3 (16 half octants) A half octant (3 RPC modules) Module C Module B Module A

PHENIX RPC factory layout B. RPC station 3 status - 1. Structure of the station RHIC spin workshop, Seoul National Univ.5 Burn-in test stand and half octant storage half octant components and hardware storage Gas system RPC gap & module storage with humidity control Half octant assembly area Half octant transport table Main tent (module assembly & QA) Entrance

B. RPC station 3 status - 2. Module production and QA RHIC spin workshop, Seoul National Univ.6  PHENIX muon trigger RPC  Based on CMS endcap bakelite RPC technology and expertise  Each station 3 (north & south) requires 48 (16×3) detector modules  All of station 3 detector modules (both sides) were produced successfully Station 3 - module C PHENIX RPC requirements Time resolution  3 ns Average cluster size  2 strips Efficiency> 95 % Rate capability0.5 kHz/cm 2 # of streamers< 10 %

RHIC spin workshop, Seoul National Univ.7 B. RPC station 3 status - 2. Module production and QA Module assembly Lay down Cu foil on the Mylar sheet (+ frame) Place lower gap into Cu foil & Connect Polyethylene gas tubes Connect CPE cable to H.V cable on the bottom RPC gap Connected gas tube

RHIC spin workshop, Seoul National Univ.8 B. RPC station 3 status - 2. Module production and QA Module assembly (continue) Preparing readout strip (attach signal cables) A signal cable attached to the strip Place readout strip on the lower gap Place upper gap on the readout strip Sideview of stacked RPC gaps & strip Signal cables attached to the strip and the upper gap

RHIC spin workshop, Seoul National Univ.9 B. RPC station 3 status - 2. Module production and QA Module assembly (continue) Connect gas tubes to the upper gap Connect CPE cable to the H.V cable (upper gap) Before wrap the Cu foil After wrap the Cu foil Fully assembled RPC detector module

B. RPC station 3 status - 2. Module production and QA RHIC spin workshop, Seoul National Univ.10 Module QA Before assembly (Gap QA) Spacer pop check Gas leakage check HV hold Dark current After assembly (module QA) Noise rate check Cosmic ray test RPC cosmic ray test stand - event display cosmic ray trigger scintillators RPC readout strip planes cosmic ray trajectory  QA(Quality Assurance) items after module assembly: Noise rate, Total(2D) and strip efficiencies, Time resolutions, Cluster size

B. RPC station 3 status - 2. Module production and QA RHIC spin workshop, Seoul National Univ.11 Noise rate: RPC H.V = 9.5 kV, PHENIX RPC FEE Threshold = 160 mV Noise Rate (Hz/cm 2 ) Raw TDC : 1 unit = 100 ns/44 = 2.41 ns Time resolution vs. H.V Efficiency of a module (%) vs. H.V with different Threshold Cluster size of a module vs. H.V with different Threshold Operation voltage PHENIX requirements

B. RPC station 3 status - 2. Module production and QA RHIC spin workshop, Seoul National Univ.12 # of strips vs. noise rate (individual module) # of strips vs. noise rate (all 48 modules) Results of station 3 - north  # of strips vs. noise rate (all modules)  # of modules: 48  H.V: 9.5 kV  FEE threshold: 160 mV  Average noise rate: 0.52 Hz/cm 2  Only 7 strips are over 10 Hz/cm 2  strips vs. noise rate (individual module)  H.V: 9.5 kV  FEE threshold: 160 mV  Black histogram: module A  Blue histogram: module B  Red histogram: module C All results are compliant with PHENIX RPC requirements

B. RPC station 3 status - 3. Half octant production and QA RHIC spin workshop, Seoul National Univ.13 Half octants assembly Route service lines of the module for the assembly Insert prepared modules to the HO frame Connect & Re-route service lines to the patch pannel View from inside of patch pannel Insert prepared modules to the HO frame (2) Insert prepared modules to the HO frame (3)

B. RPC station 3 status - 3. Half octant production and QA RHIC spin workshop, Seoul National Univ.14  RPC Half octants status  All half octants (total 32, north & south) were produced successfully  North: QA, installation, integration and commission were completed  South: QA is underway (15 of 16 QA finished & installed), preparing for integration RPC half octant placed on assembly table at the RPC factory in BNL

B. RPC station 3 status - 3. Half octant production and QA RHIC spin workshop, Seoul National Univ.15  Average noise rate: 0.37 Hz/cm 2  Modules are in Faraday cage Integrated result of half-octants QA AT FACTORY

B. RPC station 3 status - 3. Half octant production and QA RHIC spin workshop, Seoul National Univ.16 RPC station 3 – north installation

B. RPC station 3 status - 3. Half octant production and QA RHIC spin workshop, Seoul National Univ.17 RPC station 3 - north installation completed

B. RPC station 3 status - 3. Half octant production and QA RHIC spin workshop, Seoul National Univ.18 RPC TDC RackIntegration completed

B. RPC station 3 status - 3. Half octant production and QA RHIC spin workshop, Seoul National Univ.19  Goal: c heck performance of the RPCs at stand-alone mode  Full electronics readout chain  Noise rate  Ground  Cosmic ray background  H.V stability  Dark current  etc.  Progress  Most of the items progress favorably  Problem in several half octants’ (6 of 16) H.V holding & Dark current  Cause: gas balance (mixed gas is heavier than normal air)  Careful pressure control required by each half octants’ position  PHENIX technicians and RPC factory crews are working on to resolve it Commission of RPC3 - north

B. RPC station 3 status - 3. Half octant production and QA RHIC spin workshop, Seoul National Univ.20 1W2W3W4W5W6W7W8W1E2E3E4E5E6E7E8E Assembly Done Leakage test Done QA Done OnDone Burn-in Done 06/14 – 07/26 Done 06/14 – 07/26 Done 07/01 – 08/04 Done 07/01 – 08/05 Done 08/05 – 09/07 Done 08/09 – 09/07 Done 08/09 – 09/01 Done 08/09 – 09/01 Done 08/13 – 09/08 Done 08/13 – 09/08 On 08/13 – On 08/13 – On 08/13 – On 08/13 – On 08/13 – On 08/13 – Status In Leakage test Done H.V test Done Electronics test Done Status of RPC3 - south half octants  Done: completed, On: ongoing, In: Installed

C. Summary and Perspective RHIC spin workshop, Seoul National Univ.21  Summary  Production and QA of all of the station 3 RPC modules were completed  Production of all of the station 3 half octants was completed  North: Completed (QA, installation, integration and commissioning)  South: QA is underway, installation in progress, preparing for integration, commissioning will be early of run-11  Perspective  Preparing for the operation at run-11 (incoming run)  Integration of RPC DAQ into PHENIX DAQ  Integration with MuTrig  RPC station 1:  Gap production was completed  Prototype test is underway

C. Summary and Perspective RHIC spin workshop, Seoul National Univ.22 RPC Installation for Station 3 South by October + Absorber Installation RPC Production and Installation for Station 3 North by October RPC Production for Station 1 North by December RPC Installation for Station 1 during shutdown PHENIX RPC schedule

Thanks! RHIC spin workshop, Seoul National Univ.23

RHIC spin workshop, Seoul National Univ.24 Backup - W measurement at PHENIX muon arms  W measurement at RHIC:  Goal: study the polarization of the flavor separated quarks/antiquarks  Meathod: by measuring muons decayed from W bosons A L W : single spin asymmetry p: beam polarization N L(R) (W) : # of events contains the muons from W with corresponding helicity (L or R) Spin crisis and W measurement at RHIC  Spin criris:  proton spin is not a simple sum of its constituent quarks  Component-by-component approach: flavor separated quarks/antiquarks, gluons, and their angular momenta

Muon Hadron Absorber Muon Tracker (MuTr) Muon ID (MuID) RHIC spin workshop, Seoul National Univ.25 Current PHENIX muon arms  Acceptance  1.2 < |η| < 2.2  Δφ = 2π  Muon Tracker (MuTr)  3 stations of CSCs  80 cm of steel & copper absorber  Muon ID (MuID)  5 gaps of larocci tube in x & y directions  Total 80 cm of steel absorber (plates)  Muon tracking and triggering  Tracking by hit positions from each station  Most hadrons are absorbed before reaching last gap of the MuID  Current 1 st level rejection factor (RF): < 100 (MuID based 1 st level trigger) Backup - W measurement at PHENIX muon arms

RHIC spin workshop, Seoul National Univ.26 Simulated muons into Muon Arms (2000 pb -1, with PYTHIA 5.7) Current Muon trigger at PHENIX W measurement at PHENIX muon arms  √s = 500 GeV, σ = 60 mb  L = 1.5 x cm -2 s -1 → 3.0 x cm -2 s -1 (after upgrade)  Total interaction rate: 9 MHz (18 MHz)  DAQ limit: 2 kHz (for muon arm)  Required rejection factor (RF): 4500 (9000)  The current muon trigger can accepts muons above 2 GeV/c, but DAQ cannot take full rate at 500 GeV  Required 1 st level rejection factor for W at 500 GeV: 9000  Need momentum sensitive muon trigger and fast readout electronics for muon tracker  The upgraded 1 st level trigger will select events with muons of p T  20 GeV/c from W boson decay Backup - W measurement at PHENIX muon arms

RHIC spin workshop, Seoul National Univ.27 Characteristics of double gap RPC in avalanche mode  Fast response: suitable for the trigger device  Good time resolution: ns for M.I.P  Good spatial resolution: typically ~ cm (Determined by the read-out strip width and cluster size)  Efficiency: > 95 % for M.I.P  Rate capability: kHz/cm 2  Low cost: bakelite (resistivity  cm)  Noise rate: Hz/cm 2 for  cm  Typical strip multiplicity:  Typical gas mixture:  95% C 2 H 2 F 4 (Tetrafluoroethane, R134A, base gas for avalanche mode RPC) + 4.5% i-C 4 H 10 (isobutane, photon quencher) + 0.5% SF 6 (electron quencher)  20 – 40% relative humidity Backup - Characteristics of the RPC Cu foil (2 mm) Mylar sheet Module frame (Al)

RHIC spin workshop, Seoul National Univ.28 Backup - Module production and QA Module assembly flow Cu foil (2 mm) Mylar sheet Module frame (Al) Lay down a Mylar sheet & Cu foil on the bottom module frame Place lower gap & Attach service lines (H.V, gas) Prepare readout strips & Place it on the lower gap Place upper gap on the strip & Attach service lines Put a Mylar sheet on upper gap & Wrap the cu foil Close module frame

RHIC spin workshop, Seoul National Univ.29 FEE CAMAC modules 4434 CAMAC scaler & pdaq machine A RPC module HV (CAEN) LV (MEGAPACK) Raw signal LVDS signal ECL signal Converting LVDS to ECL Visual scaler Backup - Module logic for noise rate test

RHIC spin workshop, Seoul National Univ.30 Backup - Module logic for cosmic ray test FEE TDC & new pdaq machine HV (CAEN) LV (MEGAPACK) Raw signal LVDS signal RPC modules (usually 10)