Www.Channelcoast.org Southeast strategic regional coastal monitoring programme Andrew Bradbury Southeast strategic regional coastal monitoring programme.

Slides:



Advertisements
Similar presentations
Achieve Benefit from IT Projects. Aim This presentation is prepared to support and give a general overview of the ‘How to Achieve Benefits from IT Projects’
Advertisements

Adaptation and Resilience of Coastal Energy, ARCoES Living with our Buildings and Infrastructure: Adapting for the Future 18 & 19 September 2012.
Concurrent Plan Updates?. Plan Update Requirements Cost-Affordable Transportation Plan Horizon Year Due December 2014 Hillsborough County Comprehensive.
Joint Defra/EA FCERM R&D Programme: Strategy and Policy Development Theme overview.
Rossbeigh Barrier Beach Investigating the hydrodynamics of a breached barrier beach Michael O’Shea Hydraulics and Maritime Research Centre U.C.C. EGU 2012.
Northern Trust Lymphoedema Stakeholder Event Elaine Stowe Lymphoedema Lead Northern Trust Feb 2010.
Tidal Datums Text and Figures Source: NOAA/NOS CO-OPS Tidal Datums related publications.
Global Terrestrial Networks : The Hydrological Network.
2015 Height Modernization Partner Meeting April 14, 2015.
Somerset County Council Climate Change Strategy Abigail Stretch Sustainable Development Officer.
Coastal Planning Decisions for the future Neil Watson Coastal Engineer -Dorset 27 th October 2010.
Technologies for adaptation to climate change: How to make them work?
The Global Sea Level Observing System (GLOSS) 2012 Mark Merrifield University of Hawaii Requirements Status Strategies Partnerships Emerging technologies.
OCEAN SAFETY Presented by: Ocean Safety and Lifeguard Services Division.
Coastal vulnerability assessments for England and Wales: the National Coastal Erosion Risk Mapping Project (NCERM) Coastal Groups.
Making Space for Water Risk Mapping: Coastal Erosion Tuesday 6th June 2007 LGA SIG Geoff Astle, Environment Agency Jonathan Rogers, Halcrow.
TECHNOLOGY FOR ADAPTATION TO CLIMATE CHANGE IN COASTAL ZONES Richard J.T. Klein 1,2 1. Potsdam Institute for Climate Impact Research, Germany 2. Stockholm.
Eurosion and Conscience projects - brief overview Tom Bucx (Deltares) 9 June 2011 EEA Expert meeting Methods and tools for assessing.
SHORELINE MANAGEMENT PLAN REVIEW (SMP2) South Devon and Dorset Coastal Authorities Group SDADCAG.
DEFRA 1 st IMPACT Workshop - 16/17 May 2002 How does this research fit within the UK? Dr Mervyn Bramley Flood Defence Development Manager, Environment.
San Francisco District San Francisco District Coastal Activities Frank Wu CERB Meeting June 4, 2009.
A Biodiversity Monitoring Framework for Devon Work Programmes for BIRG discussion 31/07/08 Ray Perrins.
A Review of Waste Needs Assessment for New Waste Treatment Processes CIWM Cymru Wales & NW Centres Autumn Event 2010.
Foresight future floding Ian Meadowcroft, Environment Agency JimHall University of Bristol, Department of Civil Engineering Paul Sayers, HR Wallingford.
The Texas Shoreline Change Project: The Texas Shoreline Change Project: Combining Lidar, Historical Photography, and Ground Surveys to Measure Shoreline.
The Science Requirements for Coastal and Marine Spatial Planning Dr. Robert B. Gagosian President and CEO Ocean Studies Board November 10, 2009.
Strategic Planning for Coastal Flooding and Erosion Nick Hardiman Senior Coastal Adviser Environment Agency Strategic Overview.
1 Water Services Training Group 19 th Annual Conference Optimising Services Delivery in the Water Industry Radisson Blu Hotel Sligo, 3 rd. September 2015.
` DIVISION OF NEARSHORE RESEARCH TEXAS A&M UNIVERSITY-CORPUS CHRISTI Key Features:  Located on oil production platforms 3 and 15 nautical miles from Port.
Reducing the Risk of Embankment Failure Under Extreme Conditions Mark Morris HR Wallingford IMPACT Project Workshop Wallingford, 17 May 2002.
School Improvement Partnership Programme: Summary of interim findings March 2014.
National Vulnerability and Risk Assessments Questions for Consideration (1) Tuesday, 24 th June th EIONET Workshop on Climate Change Impacts, Vulnerability.
Regional Planning for Sea-Level Rise in Hampton Roads Benjamin McFarlane, AICP Regional Planner NOAA Hydrographic Services Review Panel October 26, 2011.
Ghent University, Renard Centre of Marine Geology Management Unit of the Mathematical Models of the North Sea Catholic University Leuven, Hydraulics Laboratory.
Adam Hosking Principal Coastal Scientist Halcrow, Inc. Tampa, FL
Strategic Regional Coastal Monitoring Programme in England
SOUTH WEST STRATEGIC REGIONAL COASTAL MONITORING PROGRAMME UPDATE ROB WEBBON OFFICE MANAGER.
European Commission Directorate General Environment Page 1 Regulation (EC) No 2152/2003 of the European Parliament and of the Council concerning monitoring.
T. Scott† P. Russell†, G. Masselink∞, and A. Wooler‡ † School of Earth, Ocean and Environmental Sciences, University of Plymouth, PL4 8AA, UK ∞ School.
VIEWING SURVEY DATA IN CONTEXT: CRITICAL, MAINTENANCE AND DESIGN TRIGGER LEVELS Jonathan Clarke Canterbury City Council.
11 October 2011 JANE MOON IMPACT OF THE TERMINAL GROYNE ON SEDIMENT TRANSPORT IN MINEHEAD BAY SENIOR GEOMORPHOLOGIST.
An Overview of Coastal Management Issues Overview and Scrutiny Co-ordinating and Call-in Committee, 10 March Andrew Wainwright, Environmental Health.
Monitoring and MRV context of the Country National Forest Inventory (NFI): the previous NFI has not covered some forest type (the sampling strategy did.
RASP - Risk Assessment of flood and coastal defence for Strategic Planning A High Level Methodology Project partners and co-authors Paul Sayers / Corina.
Making Space for Water Risk Mapping: Coastal Erosion Tuesday 17th October 2006 Geoff Astle Senior Project Manager Environment Agency.
ECoastal Training USACE Coastal CoP Meeting and Workshop Sorry for the delay. I was double booked this morning. The eCoastal workshop will begin at 8:30.
SOUTH WEST STRATEGIC REGIONAL COASTAL MONITORING PROGRAMME Annual Partners Meeting 2012 Neil Baglow Regional Coordinator / Project Manager.
NUPSIG - New Understanding and Prediction of Storm Impacts on Gravel Beaches 11 th October 2011 by Mark Davidson.
Review of 2013/14. Topographic surveys 31 post-storm surveys conducted over winter 2013/14.
Using Monitoring Data to Make a Difference: Cornwall Dune Management 6 th October 2009 Anne-Marie Moon, Dr Nigel Pontee, Dr Jonathan Rogers & Robert Webbon.
Beach Modelling: Lessons Learnt from Past Scheme Performance Project: SC110004/S Specific Modelling Tools & Techniques.
Insert the title of your presentation here Presented by Name Here Job Title - Date How can we make London’s transport network resilient to climate change?
Southeast strategic regional coastal monitoring programme Phase 2 Current phase ends in 2007Current phase ends in 2007 Need to maintain.
Project Team New Addition's Environment Agency Area Coastal Engineers Chair of South Devon and Dorset Coastal Authorities Group Chair.
Southeast strategic regional coastal monitoring programme Andrew Bradbury Review of Phase 1- where to next?
Southeast strategic regional coastal monitoring programme Andrew Bradbury Project Deliverables.
WOCAT Videos on SLM WOCAT Secretariat, Centre for Development and Environment, University of Bern.
Use of Monitoring Data for Beach Management
SOUTH WEST STRATEGIC REGIONAL COASTAL MONITORING PROGRAMME
Data for Beach Management (Plans) Magellan Day (1520) Dr Uwe Dornbusch Strategic & Development Planning Title highlights that management could be carried.
Introduction Breach Gravel Barrier Salt Marsh
Review of Phase ii & National Network
South East Regional Coastal Monitoring Programme
9/16/2018 The ACT Government’s commitment to Performance and Accountability – the role of Evaluation Presentation to the Canberra Evaluation Forum Thursday,
Standards for success in city IT and construction projects
Programme delivery and development
Programme delivery and development
Aerial Photography 30th September 2004
Jenny Watts Coastal Process Scientist, Plymouth Coastal Observatory
Presentation transcript:

Southeast strategic regional coastal monitoring programme Andrew Bradbury Southeast strategic regional coastal monitoring programme

Seaford Bournemouth Pevensey Hythe Bulverhythe Eastbourne Weymouth Hurst Spit Herne Bay

Southeast strategic regional coastal monitoring programme Complex risk scenarios High quality data required for beach managementHigh quality data required for beach management –Strategic planning –Operational management –Planning new schemes –Performance evaluation

Southeast strategic regional coastal monitoring programme Particular problem areas Accuracy of nearshore wave climate predictionAccuracy of nearshore wave climate prediction Sediment transport modelling calibrationSediment transport modelling calibration Inadequate field data to provide calibration or validation of modelsInadequate field data to provide calibration or validation of models Performance of beach control structuresPerformance of beach control structures Impacts of unsorted recharge materials

Southeast strategic regional coastal monitoring programme Historical approach Existing data generally localised at “beach management” sites.Existing data generally localised at “beach management” sites. Inconsistent approach regionallyInconsistent approach regionally No strategic programmes covering coastal process cellsNo strategic programmes covering coastal process cells Undefended stretches of shoreline infrequently monitored, despite potential for local interaction with managed sites.Undefended stretches of shoreline infrequently monitored, despite potential for local interaction with managed sites.

Southeast strategic regional coastal monitoring programme Vision Promote, inform and integrate the operational monitoring requirements of: regional overview; shoreline management plans; coastal strategies, and individual schemes, between the limits of the boundaries of regional cells 4 and 5Promote, inform and integrate the operational monitoring requirements of: regional overview; shoreline management plans; coastal strategies, and individual schemes, between the limits of the boundaries of regional cells 4 and 5

Southeast strategic regional coastal monitoring programme Aims Promote a standard, repeatable and cost effective method of monitoring of the coastal environment.Promote a standard, repeatable and cost effective method of monitoring of the coastal environment.

Southeast strategic regional coastal monitoring programme Programme development DEFRA funded preliminary studiesDEFRA funded preliminary studies Interviews with all potential stakeholdersInterviews with all potential stakeholders –Details current procedures –Risk based approach to programme design –Discussion of management options Data drawn from SMPs and CDSsData drawn from SMPs and CDSs –Pilot trials –Analysis of legacy programmes Formal agreement from each partner (31)Formal agreement from each partner (31) Project board establishedProject board established DEFRA grant aided 5 year programme £8 millionDEFRA grant aided 5 year programme £8 million Establishment of Channel Coastal ObservatoryEstablishment of Channel Coastal Observatory

Southeast strategic regional coastal monitoring programme Programme structure Range of levels of monitoringRange of levels of monitoring –High level on areas with beach management plans that require intervention eg recycle, recharge –Comprehensive programme in actively managed high risk areas –Lower levels in do nothing areas

Southeast strategic regional coastal monitoring programme Programme management framework –Coastal Group basis –3 coastal group coordinators (LA) –Aerial survey programme coordinator (EA) –Regional data centre and dissemination coordinator (Channel Coastal Observatory)

Southeast strategic regional coastal monitoring programme Programme design Detailed programme prepared for each management unitDetailed programme prepared for each management unit 5-year programme designed5-year programme designed Recommendations for combination ofRecommendations for combination of –Aerial –LIDAR –Beach profiles and spot heights –Hydrographic surveys –Tide and wave measurement

Southeast strategic regional coastal monitoring programme Control surveys GPS Control Network Second order (E2) networkSecond order (E2) network –Stations 1-5km –Static / fast static control from primary network Local networkLocal network –Stations 100m-1km –RTK or traditional methods First order (E1) network region wideFirst order (E1) network region wide –Stations 30-50km apart Region wide networkRegion wide network Consistent application of network transformations to all data setsConsistent application of network transformations to all data sets

Southeast strategic regional coastal monitoring programme Baseline surveysBaseline surveys –Accessible beaches land survey spot height and ground model plus regular profilesland survey spot height and ground model plus regular profiles –Inaccessible beaches, cliffs, tidal inlets Combination LIDAR and aerial surveyCombination LIDAR and aerial survey –Baseline orthophoto survey –Detailed hydrographic survey across whole region

Southeast strategic regional coastal monitoring programme Regular surveys TopographicTopographic –Land survey (beaches) profiles frequency varies 1-2 times per yearfrequency varies 1-2 times per year additional provision for post storm surveysadditional provision for post storm surveys spacing varies from 100m-500mspacing varies from 100m-500m –Spot height and ground models in BMP areas (annual) - additional to profiles

Southeast strategic regional coastal monitoring programme EA Annual Beach Monitoring Survey Improved and extended programmeImproved and extended programme –Regional extension –Cliff plan shape –Marsh plan shape –Orthophotos

Southeast strategic regional coastal monitoring programme Cliffs and inlets LIDAR and aerial photosLIDAR and aerial photos Frequency varies – annual to 5 yearsFrequency varies – annual to 5 years

Southeast strategic regional coastal monitoring programme Hydrographic surveys –Frequency varies biannual to 5 years e.g. Inlets typically 5 yearsInlets typically 5 years Inlet mouth annualInlet mouth annual Drying toe bed platform beach typically 5 yearsDrying toe bed platform beach typically 5 years BMP site with active submerged toe biannualBMP site with active submerged toe biannual –All surveys to be Line spacing 50mLine spacing 50m Ground modelled profilesGround modelled profiles Minimum line length 500m or to 5mCDMinimum line length 500m or to 5mCD

Southeast strategic regional coastal monitoring programme Hydrodynamic surveys Existing tide gauges to be quality checked, calibrated and upgraded if necessaryExisting tide gauges to be quality checked, calibrated and upgraded if necessary Selected new sites to be addedSelected new sites to be added Existing wave stations to be maintainedExisting wave stations to be maintained Selected new sites to be installed and maintained on 5 yr rolling programmeSelected new sites to be installed and maintained on 5 yr rolling programme Time series data to be purchased for Met-office UK model at selected sitesTime series data to be purchased for Met-office UK model at selected sites Database to include shallow water prediction sites using time seriesDatabase to include shallow water prediction sites using time series

Southeast strategic regional coastal monitoring programme Data management Consistent approach to data managementConsistent approach to data management Regional data centre to be establishedRegional data centre to be established –Local data management SANDS database developmentSANDS database development GIS developmentGIS development Meta data standardMeta data standard Web site - data freely availableWeb site - data freely available Image Web Server – aerial photos and other raster imagesImage Web Server – aerial photos and other raster images Real time and archive time series web server developmentReal time and archive time series web server development

Southeast strategic regional coastal monitoring programme

Analysis of coastal monitoring data Two levels of basic analysisTwo levels of basic analysis –to inform SMP and CDS –to inform operational analysis for BMP Annual reporting and programme reviewAnnual reporting and programme review

Southeast strategic regional coastal monitoring programme Physical model design and validationPhysical model design and validation Recharge designRecharge design Links with strategic researchLinks with strategic research Post project appraisalPost project appraisal Event analysisEvent analysis Operational managementOperational management

Southeast strategic regional coastal monitoring programme

Conclusions Regional monitoring programme designed for SE EnglandRegional monitoring programme designed for SE England Programme comprises 31 LA and EA partnersProgramme comprises 31 LA and EA partners Funding DEFRA operational budgetFunding DEFRA operational budget Data to be made freely available – primarily web deliveryData to be made freely available – primarily web delivery Outline programme designedOutline programme designed Pilot baseline surveys completedPilot baseline surveys completed Analysis programme developed and tested on legacy regional data setsAnalysis programme developed and tested on legacy regional data sets Benefit cost analyses indicates significant financial returns expectedBenefit cost analyses indicates significant financial returns expected