MQXFSD3 laminated structure J.C Perez N. Bourcey, B. Favrat, P. Ferracin, P. Moyret.

Slides:



Advertisements
Similar presentations
EuCARD-HFM ESAC review of the high field dipole design, 20/01/2011, Maria Durante, 1/40 EuCARD-HFM ESAC Review of the high field dipole design Fabrication.
Advertisements

COIL & ASSEMBLY READINESS REVIEW, SEPT 2013 D. Smekens.
Racetrack Coil Technology – G. Ambrosio 1 LARP DOE review – FNAL, June. 5-6, 2007 BNL - FNAL - LBNL - SLAC Racetrack Coil Technology (LR, SQ) & other Supporting.
Dan Cheng H. Felice, R. Hafalia QXF Structures Video Meeting July 10, 2014 Coil Handling for Magnet Assembly Status Update.
S. Caspi, LBNL HQS Progress Report High Field Nb 3 Sn Quadrupole Magnet Shlomo Caspi LBNL Collaboration Meeting – CM11 FNAL October 27-28, 2008.
ILC Main Linac Superconducting Cryogen Free Splittable Quadrupole Progress Report V. Kashikhin for Superconducting Magnet Team.
Superconducting Large Bore Sextupole for ILC
LARP QXF 150mm Structure Mike Anerella / John Cozzolino / Jesse Schmalzle November 15, nd Joint HiLumi LHC-LARP Annual Meeting.
Coil working group video-meeting P. Ferracin, J. C. Perez, S. Izquierdo Bermudez, X. Sarasola February 4th, 2014.
MQXFS Assembly Procedure J.C Perez 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014 KEK, Tsukuba N. Bourcey, D. Cheng, B. Favrat, H. Felice,
SQXF Shell & Yoke Assembly Procedure
H. Felice - P. Ferracin – D. Cheng 09/19/2013 Update on structure CAD model.
H. Felice - P. Ferracin – D. Cheng 09/11/2013 Update on structure CAD model.
MQXF Cold-mass Assembly and Cryostating H. Prin, D. Duarte Ramos, P. Ferracin, P. Fessia 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014.
DOE Review of LARP – February 17-18, 2014 Helene Felice P. Ferracin, M. Juchno, D. Cheng, M. Anerella, R. Hafalia, Thomas Sahner, Bruno Favrat 02/17/2014.
2 nd Joint HiLumi LHC – LARP Annual Meeting INFN Frascati – November 14 th to 16 th 2012 Helene Felice Paolo Ferracin LQ Mechanical Behavior Overview and.
Design Features: still to be determined and open questions P. Ferracin 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014 KEK, Tsukuba.
Development of the EuCARD Nb 3 Sn Dipole Magnet FRESCA2 P. Ferracin, M. Devaux, M. Durante, P. Fazilleau, P. Fessia, P. Manil, A. Milanese, J. E. Munoz.
SC magnet developments at CEA/Saclay Maria Durante Hélène Felice CEA Saclay DSM/DAPNIA/SACM/LEAS.
MQXF length P. Ferracin Video-meeting Structure WG September 18th, 2014.
FNAL QXF Curing Mold Miao Yu, FNAL 05/07/2013. FNAL Short Curing Press 2 2 meter long Capacity (pump psi) Max. force/cylinder kN (ton) Spacing cm(inch)
Support structure working group video- meeting P. Ferracin, D. Cheng, H. Felice, M. Juchno, J.C. Perez July 15th, 2014.
LARP Prototype Assembly Steps Towards Q1 and Q3 Production Dan Cheng MQXF Design Review December 10-12, 2014 CERN H. Felice, R. Hafalia, D. Horler, T.
LARP Prototype Assembly Steps Towards Q1 and Q3 Production Dan Cheng MQXF Design Review December 10-12, 2014 CERN.
11 T Nb3Sn Demonstrator Dipole R&D Strategy and Status
Eucard-WP7-HFM 9 th Collaboration Meeting at Warsaw University of Technology Status on SMC & RMC Models J.C Perez on behalf of SMC collaboration team.
10/28/2015Pierre Moyret1 Production of SQXF Magnet Components: Return on experience P.MOYRET EN-MME-FS.
11 T Dipole Status at FNAL Fred Nobrega January 21, 2014.
Helene Felice, Dan Cheng Support structure modifications Update on discussion at CERN.
Title – xxxx 1 LARP & US-HiLumi Contribution to the Inner Triplet Quadrupoles G. Ambrosio Cost and Schedule Review CERN, March 9 th -11 th 2015.
Triplet status and plans P. Ferracin, G. Ambrosio, M. Anerella, A. Ballarino, B. Bordini, F. Borgnolutti, R. Bossert, D. Cheng, D.R. Dietderich, B. Favrat,
MQXF support structure An extension of LARP experience Helene Felice MQXF Design Review December 10 th to 12 th, 2014 CERN.
Baby MIND coil modules assembly the aluminium folded strip solution 1 Alexey, Philippe, Gabriella, Helder, Herman Baby Mind Magnet CERN June.
Subscale quadrupole (SQ) series Paolo Ferracin LARP DoE Review FNAL June 12-14, 2006.
MQXFS Assembly Procedure J.C Perez N. Bourcey, B. Favrat, P. Ferracin, Ph. Grosclaude, M. Juchno, L. Lambert, P. Moyret, J. Parrilla Leal, N. Peray, T.
HIGH RAMP RATE SUPERCONDUCTING MAGNETS AT BNL Peter Wanderer BNL Archamps Workshop, March 2003.
LMQXFA Cold Mass Assembly Antonios Vouris Fermilab February 3, 2016.
MQXF Workshop on Structure, Alignment, and Electrical QA Feb 2-4, 2016 Dan Cheng J. De Ponte, H. Felice, S. Kincaid, T. Lipton, S. Myers, A. Pekadis, M.
Dan Cheng, Helene Felice 4/8/2015 MQXFS-D Build-up LBNL “Lessons Learned”
1 MQXF Workshop on Structure, Alignment, and Electrical QA Feb 2-4, 2016 Options for modifications to parts and procedures Options for modifications to.
Overview short model design and structures P. Ferracin on behalf of the MQXF collaboration MQXF Workshop on Structure, Alignment, and Electrical QA CERN.
MQXFB design, assembly plans & tooling at CERN J.C Perez On behalf of MQXF collaboration team MQXF Workshop on Structure, Alignment and Electrical QA.
DESIGN STUDIES IR Magnet Design P. Wanderer LARP Collaboration Meeting April 27, 2006.
Cold Mass and Assembly Tooling Design, Procurement Status and Assembly Plan Igor Novitski Fermilab 15 T Dipole Design Review April 2016 April 28-29,
MQXFB Prototype structure and plans at CERN J.C Perez On behalf on MQXF collaboration team Joint HiLumi-LARP Meeting & 24 th LARP Collaboration Meeting.
Dan Cheng, Xiaorong Wang 12/15/2015 MQXFA Connectors Discussion Part II.
MQXFS01 instrumentation, Projecting towards MQXFA D. Cheng, S. Myers, H. Pan, X. Wang 10/14/20151.
DOE Review of LARP – February 17-18, 2014 Helene Felice P. Ferracin, M. Juchno, D. Cheng, M. Anerella, R. Hafalia, Thomas Sahner, Bruno Favrat 02/17/2014.
CONCEPTUAL DESIGN OF D2 MECHANICAL STRUCTURE (DOUBLE COLLARING OPTION) S. Farinon, P. Fabbricatore (INFN-Sezione di Genova) Sept. 24 th 2015.
Coil-pack assembly procedure Paolo Ferracin LQS01 readiness review #3 Assembly LBNL July 28, 2009.
QXF Reaction / Impregnation Fixtures J. Schmalzle 4/9/13.
Dan Cheng 8/27/2015 MQXFS1 Observations and Feedback from the Assembly Processes, Part II.
2 nd LARP / HiLumi Collaboration Mtg, May 9, 2012LHQ Goals and Status – G. Ambrosio 11 LHQ Goals and Status Giorgio Ambrosio Fermilab 2 nd LARP / HiLumi.
3 rd ESAC Review, 27 th February to 1 st March 2013, CEA Saclay Fresca2 Dipole Structure Assembly J.C Perez on behalf of Fresca2 collaboration team.
QXF magnet integration Paolo Ferracin Joint LARP/CM20 HiLumi meeting Napa Valley, CA, USA 8-10 April, 2013.
EuCARD-WP7-HFM meeting 15 November 2011 Status of construction of FRESCA2 dummy coil assembly Attilio Milanese, Juan Carlos Perez.
TQS Structure Design and Modeling
Rodger Bossert/Shlomo Caspi
J.C. Perez on behalf of SMC collaboration team J.C. Perez
FRESCA2 Update on the dipole design and new calculations
Discussion session on day 1
Glyn Kirby Magnet AssemblyTechniques.
the MDP High Field Dipole Demonstrator
Large aperture IR Quadrupole (MQXF) development plan
MQXF updates P. Ferracin October 9th, 2014.
MQXF coil cross-section status
Design of Nb3Sn IR quadrupoles with apertures larger than 120 mm
QXF schedule and milestones
Design of Nb3Sn IR quadrupoles with apertures larger than 120 mm
FRESCA2 - Coils 1+2 scenario
Presentation transcript:

MQXFSD3 laminated structure J.C Perez N. Bourcey, B. Favrat, P. Ferracin, P. Moyret

MQXFSD3 assembly July 17th 2015 J.C. Perez3

MQXFSD3 exploded view July 17th 2015 J.C. Perez4 Pads will be assembled using 50 and 25 mm thick SS pieces at magnet extremities 5.8 mm thick “Magnetil” laminations (LHC type iron used for MB) 25 mm thick Armco pieces between thin laminations Aluminum collars geometry will not be changed except for the inner radius still TBD

MQXFSD3 aluminum collars July 17th 2015 J.C. Perez5 Aluminum collars will be machined and delivered as single parts Collars will be assembled on top of each pad (using key-pad and collar slot as reference for alignment) Collars will be aligned using bushes and compressed with stainless steel rods

MQXFSD3 aluminum collars July 17th 2015 J.C. Perez6

MQXFSD3 load-pads July 17th 2015 J.C. Perez7 The central part of load-pads packs will be assembled using a SS tube (tack welded at the extremities) 50 mm SS pieces at the end of the load-pad will be assembled using short bushes Stainless steel tube tack welded for thin laminations assembly Stainless steel rod for longitudinal compression

MQXFSD3 load-pads July 17th 2015 J.C. Perez8

MQXFSD3 coil-pack assembly July 17th 2015 J.C. Perez9 Aluminum collars will not be bolted Bolting of the load-pads for coil pack assembly will be performed using screws spaced by ≈350 mm The new assembly procedure is being tested at CERN (using MQXFSD0 first structure: Thick laminations ) during MQXFSD2 assembly (3 shells configuration).

MQXFSD3 laminated yokes July 17th 2015 J.C. Perez10 Same configuration as per load-pad assembly (pre-assembly of 3 lamination packs) 50 mm thick plates are required at shells junctions to bolt the supporting blocks for backing strip welding (strips tack-welded to the blocks) Thick plates will also be mounted at each yoke extremity

MQXFSD3 laminated yokes July 17th 2015 J.C. Perez11

MQXFSD3 July 17th 2015 J.C. Perez12

Implementation of CERN option LARP/CERN shared effort 13 FY15FY * ½ shell Demonstrate new assembly procedure with non bolted collars MQXFSD2 Mechanical model using MQXFD0 components CERN * ½ (2 nd shell) Yoke/pad thin laminations Aluminum dummy coils MQXFSD3 Mechanical model Mechanical model at CERN Demonstration in mechanical and short model between CERN and LARP CERN to provide pad and yokes LBNL to provide collars and shells Implementation in long model/prototype MQXFA3: thin laminations and Lhe container MQXFS3 Using MQXFD3 mechanical structure and Nb 3 Sn coils shell MQXFSD0 Mechanical model 07/16/2015 H. Felice Drawings Procurement 2 months 7 months MQXFS laminated structure

Back-up slides July 17th 2015 J.C. Perez14

Coil-pack assembly table July 17th 2015 J.C. Perez15 Each ¼ collars and pads subassembly will be mounted and bolted around the coils A dedicated tooling to perform the coil-pack assembly has been designed and his being assembled Assembly procedures to be qualified and adapted for longer magnets 3D views are showing the assembly steps of the first set of structure components delivered. The assembly procedure remains fully compatible with the components of the laminated structure.

Collars & pads assembly tooling July 17th 2015 J.C. Perez16

Detailed view of alignment fixtures for lateral collars & pads assembly tooling July 17th 2015 J.C. Perez17