Half-Drowned Bushes with Traffic Control Stones & additional plantings.

Slides:



Advertisements
Similar presentations
NITROGEN & PHOSPHORUS REMOVAL FROM SHALLOW GROUNDWATER.
Advertisements

Riparian Zone Habitat Assessment Vegetation and More.
Soil-choked Riprap covered with Erosion Control Blanket (ECB), & planted with native trees & shrubs through the ECB.
DINGMANS CREEK RIGHT BANK RIPARIAN VEGETATION PLANTINGS, WITH SOME SOIL CHOKE & PLANTING OF EXISTING Rt. 209 DELAWARE WATER GAP NATIONAL RECREATION.
MONKEY RUN, ARCADE, NY. HISTORIC RAILROAD PROTECTION & DEMONSTRATION PROJECT, 41 METHODS AND TECHNIQUES IN COMBINATION.
Bioengineering & “Funnel” Strategy Nichols Road Bridge, Onondaga Creek, NY A completed project needed some “tweaking” and veg. Top bank stone.
ONONDAGA CREEK, NEAR SYRACUSE, NY. SITE 5-D & OTHER REACHES {Engineered Rocked Riffles (with all stones in compression), Traffic Control Stones, LPSTP,
WAYNE KINNEY’S REALLY TALL ENGINEERED ROCKED RIFFLES (ERR) CASE STUDY: ERR #12, WHICH IS A 4.7 FT TALL STRUCTURE.
SAND THE FOOT OF KANOPOLIS DAM, KANSAS Let’s build Engineered Rocked Riffle #5 the most upstream of the five riffles that will be constructed.
BUSTING MYTHS. BUSTING MYTHS ADVENTITIOUS ROOTING PLANTS CANNOT BE PLANTED DEEP Onondaga Nichol Road Bridge, Lafayette, NY.
GRADE CONTROL. STABILIZE HEADCUTS FIRST, THEN WORRY ABOUT BANK INSTABILITY SECOND.
DINGMANS CREEK, SITE 4, SMALL SLIDE, DELAWARE WATER GAP PROJECT VEGETATED KEYS; TRAFFIC CONTROL STONES; PLANTINGS; SINGLE STONE BENDWAY WEIRS; & A RANDOM.
PLANTING ADVENTITIOUS ROOTING PLANTS BY MACHINE AND HAND (PROSPECT CLASS)
ACCOTINK AIRFIELD RUNWAY & RECHLORINATION PLANT PROJECTS GARRISON FORT BELVOIR, FAIRFAX, VA CONSTRUCTED Dec 2-5, 2008.
ACCOTINK AIRFIELD RUNWAY & RECHLORINATION PLANT PROJECTS GARRISON FORT BELVOIR, FAIRFAX, VA CONSTRUCTED Dec 2-5, 2008.
THE ENGINEERED FLOODPLAIN BENCH. Conceptually, for an incised system you can: raise the stream, lower the floodplain, or a little of both Lower either.
PLANTING ADVENTITIOUS ROOTING PLANTS BY MACHINE AND HAND (PROSPECT CLASS)
Check out the bingo sign! CAZENOVIA STEPHENSON ST. BRIDGE.
BEE–WARE OF THE BEES-ELTON 7 BRIDGE Under construction-Elton Creek DS of Freedom 7 Bridge-derrick-Oct 2007.
OSBORNE HOLLOW CREEK ROAD PROTECTION PROJECT. Gravel-Cobble Bed Stream – Rural, Pool-Riffle-Pool, Stream Slope 2-3% Goals: Halt bank erosion to protect.
ONONDAGA CREEK, NEAR SYRACUSE, NY. SITE 5-D & OTHER REACHES {Engineered Rocked Riffles (with all stones in compression), Traffic Control Stones, LPSTP,
The Slit Brush Layering Method. THIS METHOD IS A DAVE DERRICK DISCOVERY (DDD)
ELTON CREEK, DS OF FREEDOM 7 BRIDGE, FREEDOM, NY.  Bank erosion is threatening a farm road  NRCS –Environmental Quality Incentives Program {EQIP} cost.
LOCKED LOGS (LL). THIS METHOD IS A DAVE DERRICK DISCOVERY (DDD)
GOAL & FUNCTION-BASED DESIGN FOR RIPARIAN & STREAM SYSTEMS THE EIGHTEENMILE CREEK PROJECT PHASE I CONSTRUCTED AUG-SEPT 2003 PHASE II CONSTRUCTED JUNE 18-20,
POPLAR RIVER, LUTSEN, MN. SEPARATING THE MEGA-SLIDE FROM THE RIVER (AND MORE) By the stream dream team.
Check out the bingo sign! CAZENOVIA STEPHENSON ST. BRIDGE.
RANDOM BOULDER FIELDS {RBF} (For bank protection) 2 EXAMPLES
Check out the bingo sign! CAZENOVIA STEPHENSON ST. BRIDGE.
ICE DAMAGE REDUCTION PROJECT- CHAUTAUQUA MOUTH (LAKE ERIE) WESTFIELD, NY Pix by Dave Spann.
STONES IN COMPRESSION – BOTH NATURALLY & MACHINE PLACED by Dave Derrick.
SOIL-CHOKED STONE KEYS WITH VEGETATION
CASE STUDY- West Fork Beaver River, West Point, OH. Constructed Sept
SUB MAR West Fork of Beaver River West Point, OH. Pre-project pictures. Note eroding outer bank.
West Fork Beaver River, West Point, OH. Constructed Sept Minimal height Bendway Weirs in a gravel-cobble-sand-silt bed stream for thalweg realignment.
Coos Watershed Association Watershed Restoration Projects.
DUCK CREEK EAST OF EASTERN AVENUE DAMAGED BY THE BIG RAIN ON JUNE 12, 2008 (7 inches in an hour, Q-75 year flow) PROJECT CONSTRUCTED BY CITY OF DAVINPORT,
The Ottawa Hills Dam Decommissioning Project. Constructed: August 2008.
SINGLE STONE BENDWAY WEIRS
Check out the bingo sign! CAZENOVIA STEPHENSON ST. BRIDGE.
THE STEP- BY STEPS: as posted on the FTP site. Cross-section of Eroded Bank.
NITROGEN & PHOSPHORUS REMOVAL FROM GROUNDWATER LITTLE BOGUE, MS. CONSTRUCTED NOVEMBER 2009.
McKinstry Creek, Delevan, NY This was a complete stream and floodway realignment. Constructed June-July The stream had been straightened prior.
Bioengineering & “Funnel” Strategy Nichols Road Bridge, Onondaga Creek, NY A completed project needed some “tweaking” and veg. Top bank stone.
HAW CREEK, PIKE COUNTY, MISSOURI-TRIB TO SALT RIVER ERODING STREAM THREATHENING COUNTY ROAD #107, FOURTEEN FT TALL ERODING BANK WITHIN 4 FT OF THE ROAD,
VINES & LOW GROWING GROUNDCOVERS: OVERLOOKED RESTORATION TECHNIQUES.
NYS-DOT REGION 6 ROAD PROTECTION FOR ROUTE 248 CHENUNDA CREEK, SOUTH OF WELLSVILLE, NY. CONSTRUCTED AS A HANDS-ON WORKSHOP SEPTEMBER 2006.
CASE STUDY:Grand River at Route “A” 100 miles north of Kansas City, MO. Constructed June 2001 False Banklines using LPSTP (medium-sized river)
GOAL & FUNCTION-BASED DESIGN FOR RIPARIAN & STREAM SYSTEMS THE EIGHTEENMILE CREEK PROJECT PHASE I CONSTRUCTED AUG-SEPT 2003 PHASE II CONSTRUCTED JUNE 18-20,
GRADE CONTROL: the VIFFLE {Combo of the cross- Vane & rocked rIFFLE}
McKinstry Creek NYS DOT Mitigation Project STREAM & RIPARIAN COORIDOR RESTORATION, WETLAND REWETTING, VERNAL POOLS, “RPM” PLANT EXPERIMENTAL TEST PLOTS,
Check out the bingo sign! CAZENOVIA STEPHENSON ST. BRIDGE.
DINGMANS CREEK, SITE 4, SMALL SLIDE, DELAWARE WATER GAP PROJECT VEGETATED KEYS; TRAFFIC CONTROL STONES; PLANTINGS; SINGLE STONE BENDWAY WEIRS; & A RANDOM.
BUSTING MYTHS VEGETATION TAKES A LONG TIME TO GET ESTABLISHED GOODWIN CREEK, MS. CONSTRUCTED AS A HANDS-ON WORKSHOP, MARCH 2007.
BEE–WARE OF THE BEES-ELTON 7 BRIDGE Under construction-Elton Creek DS of Freedom 7 Bridge-derrick-Oct 2007.
ACCOTINK AIRFIELD RUNWAY & RECHLORINATION PLANT PROJECTS GARRISON FORT BELVOIR, FAIRFAX, VA CONSTRUCTED Dec 2-5, 2008.
HAW CREEK, PIKE COUNTY, MISSOURI-TRIB TO SALT RIVER ERODING STREAM THREATHENING COUNTY ROAD #107, FOURTEEN FT TALL ERODING BANK WITHIN 4 FT OF THE ROAD,
ELTON CREEK, DS OF FREEDOM 7 BRIDGE, FREEDOM, NY. Bank erosion is threatening a farm road NRCS –Environmental Quality Incentives Program {EQIP} cost share.
GOODWIN WARNER MCBRIDE PROPERTY, NEAR BATESVILLE, MS. CONSTRUCTED FEB 26 – MAR 2, 2007 The final design was based on the landowner’s required stream.
GRADE CONTROL.
GOAL & FUNCTION-BASED DESIGN FOR RIPARIAN & STREAM SYSTEMS THE EIGHTEENMILE CREEK PROJECT PHASE I CONSTRUCTED AUG-SEPT 2003 PHASE II.
WAYNE KINNEY’S REALLY TALL ENGINEERED ROCKED RIFFLES (ERR) CASE STUDY: ERR #12, WHICH IS A 4.7 FT TALL STRUCTURE.
ONONDAGA CREEK, NEAR SYRACUSE, NY
VINES – THE OVERLOOKED RESTORATION TECHNIQUE
CASE STUDY- West Fork Beaver River, West Point, OH. Constructed Sept
When should you fix a stream????
SINGLE STONE BENDWAY WEIRS
VEGETATION DOES NOT TAKE A LONG TIME TO GET ESTABLISHED GOODWIN CREEK, MS. CONSTRUCTED AS A HANDS-ON WORKSHOP, MARCH 2007.
When should you fix a stream????
DINGMANS CREEK, SITE 4, SMALL SLIDE, DELAWARE WATER GAP PROJECT VEGETATED KEYS; TRAFFIC CONTROL STONES; PLANTINGS; SINGLE STONE BENDWAY.
Presentation transcript:

Half-Drowned Bushes with Traffic Control Stones & additional plantings.

STILLWATER CREEK, REDDING, CA Natural Half-Drowned Bushes (not constructed)

NATURAL-Looking naturally occurring Half-Drowned Bush (branches dragging in water) with undercut bank. NATURAL HALF-DROWNED BUSH-STILLWATER CR. CA.-DERRICK – 11/16/2010

NATURAL-Looking natural Half-Drowned Bush providing bank protection with undercut bank. Fantastic aquatic habitat, insect production, shade, cover, diversity & complexity of velocity, depth & substrate. NATURAL HALF-DROWNED BUSH-STILLWATER CR. CA.-DERRICK – 11/16/2010

NATURAL-Looking Half-Drowned Bush with undercut bank. Great habitat, cover, shade, structure, micro-climate. NATURAL HALF-DROWNED BUSH-STILLWATER CR. CA.-DERRICK – 11/16/2010

NATURAL-Close-up of Half-Drowned Bush with undercut bank. Great habitat, pool with vegetative structure (multiple branches dragging in water). NATURAL HALF-DROWNED BUSH-STILLWATER CR. CA.-DERRICK – 11/16/2010

OPPOSITE BANK-Riprap with veg, but riprap prevents veg from dragging in water, riprap provides jetting flow, no within-channel refugia, no wood, no vegetative structure cover, plants too high on bank, also no undercut bank. NATURAL HALF-DROWNED BUSH-STILLWATER CR. CA.-DERRICK – 11/16/2010

McKinstry Creek NYS DOT Mitigation Project STREAM & RIPARIAN COORIDOR RESTORATION, WETLAND REWETTING, VERNAL POOLS, “RPM” PLANT EXPERIMENTAL TEST PLOTS, AND WETLAND CREATION. BUILT SUMMER 2007

Half-Drowned Bush with Traffic Control Stones Flow Pre-dug & Overdug Pool Pre-dig and Over-dig pool.

Half-Drowned Bush with Traffic Control Stones Flow Pre-dug & Overdug Pool Key Dig, place veg, & fill keys with stone.

Half-Drowned Bush with Traffic Control Stones Flow Pre-dug & Overdug Pool Key Dig holes for Traffic Control Stones, place live poles against bank, set TCS’s. TCS

Dig hole for Traffic Control Stone (TCS), place willow against bank, push TCS into position, backfill. McKINSTRY CR. DOT MITIGATION – 7/10/ PIX BY JOE GALATI

Traffic Control Stone with Live Willow Stakes. McKINSTRY CR. DOT MITIGATION – 7/10/ PIX BY DERRICK

Half-Drowned Bush with Traffic Control Stones Flow Pre-dug & Overdug Pool Key Dig hole for Half Drowned Bush. TCS

Track hoe carrying the Half-Drowned Bush. McKINSTRY CR. DOT MITIGATION – 7/10/ PIX BY DERRICK

Half-Drowned Bush with Traffic Control Stones Flow Key TCS Place Half-Drowned Bush. Roots should be at proper level relative to needs of plant. Bushes should be angled downstream & partially in water.

Hole was dug in bank, then Half-Drowned Bush is planted deep. McKINSTRY CR. DOT MITIGATION – 7/10/ PIX BY JOE GALATI

Half-Drowned Bush with Traffic Control Stones Flow If needed, stabilize Half-Drowned Bush & roots with additional stones. TCS

Looking the Half-Drowned Bush hanging into the dry channel McKINSTRY CR. DOT MITIGATION – 7/10/ PIX BY JOE GALATI

the transplanted Half-Drowned Willow Bush McKINSTRY CR. DOT MITIGATION – 7/10/ PIX BY JOE GALATI

This bush never lost its leaves even though it was transplanted in summer. McKINSTRY CR. DOT MITIGATION – 10/23/ PIX BY JOE GALATI

Looking US. Great habitat even in winter!! McKINSTRY CR. DOT MITIGATION – 12/12/ PIX BY JOE GALATI

2 Years later. Looking Half-Drowned Bush McKINSTRY CR. NY. DOT MITIGATION – 6/6/ PIX BY DERRICK

2 Years later. Looking Half-Drowned Bush. Note shade (Tunnel of Love), cover, & branches dragging in water. McKINSTRY CR. NY. DOT MITIGATION – 6/6/ PIX BY DERRICK

2 years later. Looking Half-Drowned Bush McKINSTRY CR. NY. DOT MITIGATION – 6/6/ PIX BY DERRICK

2 years later. Looking Half-Drowned Bush McKINSTRY CR. NY. DOT MITIGATION – 6/6/ PIX BY DERRICK

2 years later. Looking Half-Drowned Bush McKINSTRY CR. NY. DOT MITIGATION – 6/6/ PIX BY DERRICK

2 years later. Looking Half-Drowned Bush McKINSTRY CR. NY. DOT MITIGATION – 6/6/ PIX BY DERRICK