Revision BUSI 2301 B. Averaging methods b). Moving average - sample problem Compute a three-period moving average forecast for period 6, given the demand.

Slides:



Advertisements
Similar presentations
Capacity Planning. How much long-range capacity is needed When more capacity is needed Where facilities should be located (location) How facilities should.
Advertisements

Final Exam Study Guide MIS 373: Basic Operations Management.
4/16/ Ardavan Asef-Vaziri Variable of interest Time Series Analysis.
Exponential Smoothing 1 Ardavan Asef-Vaziri 6/4/2009 Forecasting-2 Chapter 7 Demand Forecasting in a Supply Chain Forecasting -2 Exponential Smoothing.
Forecasting the Demand Those who do not remember the past are condemned to repeat it George Santayana ( ) a Spanish philosopher, essayist, poet.
Quantitative Review I. Capacity and Constraint Management (Break-Even Analysis)
Strategic Capacity Planning for Products and Services
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 5 Capacity Planning For Products and Services.
CAPACITY LOAD OUTPUT.
Process Selection and Facility Layout
Chapter 4: Manufacturing Processes. Learning Objectives How production processes are organized Trade-offs to be considered when designing a production.
1 IRWIN  a Times Mirror Higher Education Group, Inc. company, 1996 Facilities Layout.
T T18-03 Exponential Smoothing Forecast Purpose Allows the analyst to create and analyze the "Exponential Smoothing Average" forecast. The MAD.
Class 20: Chapter 12S: Tools Class Agenda –Answer questions about the exam News of Note –Elections Results—Time to come together –Giants prove that nice.
Chapter 20 Cost-Volume-Profit Analysis and Variable Costing
To accompany Quantitative Analysis for Management, 8e by Render/Stair/Hanna 5-1 © 2003 by Prentice Hall, Inc. Upper Saddle River, NJ PERTEMUAN 14.
T T18-05 Trend Adjusted Exponential Smoothing Forecast Purpose Allows the analyst to create and analyze the "Trend Adjusted Exponential Smoothing"
McGraw-Hill/Irwin1 © The McGraw-Hill Companies, Inc., Cost-Volume- Profit Analysis Chapter 22.
© 2004 by Prentice Hall, Inc., Upper Saddle River, N.J Operations Management Forecasting Chapter 4.
For Products and Services
Chapter 11 Solved Problems 1. Exhibit 11.2 Example Linear and Nonlinear Trend Patterns 2.
Operations Management
6-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
Operations Management
Slides 13b: Time-Series Models; Measuring Forecast Error
© Business Studies Online “A firm Breaks Even if it doesn’t make a profit or a loss” In other words profit = 0 For this to happen the money coming into.
6-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
5-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
Assembly Line Balance Balance.
Process Selection and Capacity Planning
CHAPTER 3 FORECASTING.
Stevenson and Ozgur First Edition Introduction to Management Science with Spreadsheets McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies,
Capacity “The upper limit on the load that an operating unit can handle” Importance of Long-Term Capacity Impacts ability to meet future demands Affects.
23-1 Copyright  Houghton Mifflin Company. All rights reserved. Chapter 23 Cost-Volume-Profit Analysis and Variable Costing Belverd E. Needles, Jr. Marian.
Forecasting Professor Ahmadi.
Line Balancing Problem
Location planning and analysis
Assembly Line Balancing
© The McGraw-Hill Companies, Inc., 2007 McGraw-Hill/Irwin Chapter 22 Cost-Volume-Profit Analysis.
© The McGraw-Hill Companies, Inc., Technical Note 5 Facility Layout.
© The McGraw-Hill Companies, Inc., 2002 McGraw-Hill/Irwin Cost-Volume-Profit Analysis Lecture 15.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 5 Capacity Planning For Products and Services.
McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved. 1.
Copyright 2013 John Wiley & Sons, Inc. Chapter 8 Capacity, Scheduling, and Location Planning.
Assembly Line Balancing
BUAD 306 Chapter 5 - Capacity Planning Chapter 8 – Location Planning (Cost Volume ONLY)
Capacity Planning Pertemuan 04
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All Rights Reserved. Chapter 6 Process Selection and Facilities Layout.
1 1 Chapter 6 Forecasting n Quantitative Approaches to Forecasting n The Components of a Time Series n Measures of Forecast Accuracy n Using Smoothing.
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved.
3-1Forecasting CHAPTER 3 Forecasting McGraw-Hill/Irwin Operations Management, Eighth Edition, by William J. Stevenson Copyright © 2005 by The McGraw-Hill.
3-1Forecasting William J. Stevenson Operations Management 8 th edition.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 8 Facility Layout.
Cost-Volume-Profit Analysis Chapter 2. CVP analysis is used to answer questions such as:  How much must I sell to earn my desired income?  How will.
Part Three: Information for decision-making Chapter Eight: Cost-volume-profit analysis.
3-1Forecasting Weighted Moving Average Formula w t = weight given to time period “t” occurrence (weights must add to one) The formula for the moving average.
Operations Management Demand Forecasting. Session Break Up Conceptual framework Software Demonstration Case Discussion.
T T18-02 Weighted Moving Average Forecast Purpose Allows the analyst to create and analyze the "Weighted Moving Average" forecast for up to 5.
5-1Capacity Planning William J. Stevenson Operations Management 8 th edition.
6-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved
Cellular Layouts Cellular Production Group Technology
BUAD 306 Chapter 5 - Capacity Planning
Cost Behavior and Cost-Volume-Profit Analysis
Capacity Planning.
Exponential Smoothing with Trend Adjustment - continued
FACILITY LAYOUT Facility layout means:
Managerial Accounting 2002e
Exam 1 Review.
Capacity Planning For Products and Services
Presentation transcript:

Revision BUSI 2301 B

Averaging methods

b). Moving average - sample problem Compute a three-period moving average forecast for period 6, given the demand below. 6 ?

b). Moving average - sample problem Compute a three-period moving average forecast for period 6, given the demand below. 6 ? } The 3 most recent demands F6F6 = ( )/3 = 41.33

b). Weighted moving average - problem Compute a four-period weighted moving average forecast for period 6 using a weight of 0.4 for the most recent period, 0.3 for the next most recent, 0.2 for the next, and 0.1 for the next. 6 ?

b). Weighted moving average - problem Compute a four-period weighted moving average forecast for period 6 using a weight of 0.4 for the most recent period, 0.3 for the next most recent, 0.2 for the next, and 0.1 for the next. 6 ? F 6 =.1(40)+.2(43)+.3(40)+.4(41)= 41 Note: Weights must be = 1

b). Exponential smoothing - problem Given the following data prepare a forecast using exponential smoothing with a smoothing constant of Forecast for period 1 is 60.

b). Exponential smoothing - problem Given the following data prepare a forecast using exponential smoothing with a smoothing constant of Forecast for period 1 is 60. F 2 = (65-60)=60+2= 62 F 3 = (55-62)=62-2.8= 59.2 F 4 = ( )= =58.72

I. Accuracy and Control of Forecasts Error - difference between actual value and forecasted value Three measures of errors in forecasts are used: Mean absolute deviation (MAD) The average of absolute value of forecast errors Mean squared error (MSE) The average of square of forecast errors Mean absolute percent error (MAPE) The average of absolute value of forecast error relative to actual Tracking signal Ratio of cumulative error and MAD

B. Measuring capacity Design capacity –maximum obtainable output Effective capacity –Maximum capacity given product mix, scheduling difficulties, and other doses of reality. Actual output –rate of output actually achieved--cannot exceed effective capacity.

Chapter 5 Efficiency and Utilization Calculate Efficiency for rewarding our workers Calculate Utilization for designing better systems in future Or say Efficiency of workers & Utilization of Designed capacity

Design capacity = 50 trucks/day Effective capacity = 40 trucks/day Actual output = 36 units/day Efficiency/Utilization

Make or Buy

MakeBuy Fixed Cost$150,0000 Variable Cost / Unit$60$80 Annual Demand12,000 Find annual cost of each alternative: Total Cost TC = Fixed Cost FC + (Quantity Q x Variable Cost VC Per Unit) TC = FC + (Q x VC) Annual Costs to Make = 150,000 + ( 12,000 x 60 ) = 870,000 Annual Costs to Buy = 0 + ( 12,000 x 80 ) = 960,000 Therefore, Cheaper to make

Break Even Analysis

Break Even Chart Fixed cost Variable cost Total cost line Total revenue line Profit Breakeven point Total cost = Total revenue Volume (units/period) Cost in Dollars Loss

CHAPTER 6: Process Design and Facility Layout

Line Balancing assigning tasks to workstations in such a way that the workstations have approximately equal time requirements Cycle time is the maximum time allowed at each workstation to complete its set of tasks on a unit (it can be one task, or more)

Cycle time is the maximum time allowed at each workstation to complete its set of tasks on a unit (it can be one task, or more) e.g. if cycle time is two minutes, one unit will come out at the end of assembly line every two minutes. So if the assembly line works for 8 hours (480 minutes) and we need a desired output rate of 240 per day, we will have a cycle time of 480/240 = 2 minutes

E. Precedence Network Precedence network: A diagram that shows elemental tasks and their precedence requirements A Simple Precedence Diagram a 0.1 min. 0.7 min. 1.0 min. 0.5 min.0.2 min. edc b

E. Sample Problem Arrange tasks shown in the previous slide into workstations. Use a cycle time of 1.0 minute. Assign tasks in order of the most number of followers. Work station Time leftEligibleWill fitAssign task (time) Idle time a,c b,c b a, c c - a (0.1) c (0.7) bdbd b-b- b (1.0) de-de- dede d (0.5) e (0.2)

E. Line Balancing Rules Assign the task with longest time Assign the task with the most followers Some Heuristic (intuitive) Rules:

Efficiency

CHAPTER 8: Location Planning and Analysis

E. Locational Break Even Analysis Fixed and variable costs for four potential locations are given in the table below. LocationFixed Costs ($)Variable Costs ($) A250,00011 B100,00030 C150,00020 D200, Plot the total cost lines on a single graph 2.Identify the range of output over which each alternative is superior 3.If expected output is 10,000 units per year, which location would provide the lowest cost?

E. Solution Annual Output (000) $(000) A B C B Superior C Superior A Superior D

E. Solution

A New Car Washing Facility

A New Coffee Shop Using Composite Score

A New Delivery Point Using Centre of Gravity