San Gabriel Valley Council of Governments 2016 1.

Slides:



Advertisements
Similar presentations
Introduction to Concurrency Management. What is Concurrency? Chapter , F.S. requires Comprehensive Plans to adopt a concurrency management system,
Advertisements

Borrego Valley Borrego Valley Integrated Regional Water Management Planning Integrated Regional Water Management Planning.
Presented by: Eleana Esquer & Susan Arzola. MISSION OF ACSA Support California’s educational leaders; Ensure all students have the essential skills and.
Disaster Management Area Coordinator (Contracted) Applicant’s Orientation November 12, 2014.
Los Angeles County MS4 Permit Reissuance: New Directions & Strategy Presented by LA Regional Water Quality Control Board Southern California Water Dialogue.
East San Gabriel valley watershed Group Watershed Management Program (WMP) Development Cities of claremont, La Verne, pomona, and san dimas.
Legislative Changes Affecting Water Quality at a Local Level October 2011 Robert Kollinger, P.E. Water Resources Manager Polk County Parks and Natural.
PROPOSITION 218 IMPACTS ON UTILITY USER FEES Case Study City of Dixon Sewer Rate Repeal of 2007.
Santa Ana Region Stormwater Permit TMDL Requirements and Costs
Stormwater, Wellhead Protection and Drainage Issues Public Hearing.
June 19, 2014 CONTROL OF TRASH ENTERING WATERWAYS IN CALIFORNIA DRAFT WATER RESOURCES CONTROL BOARD POLICY.
Municipal Regional Stormwater NPDES Permit Overview of Requirements, Recommended Changes, and Assistance Needed March 12, 2009.
ATTORNEY SERVICES INFORMATION MEETING March 11, 2013 Department 1 Stanley Mosk Courthouse.
The coming storm: Managing Roanoke’s Stormwater Infrastructure Challenges Solutions for Roanoke’s future.
{Your District Name Here} District Small MS4/Municipal Storm Water Update {Date Here}
IWRM in EECCA countries Palle Lindgaard Jørgensen Technical Secretariat Helsinki, May 2007.
IWMP Summary Presentation IWMP Summary Presentation Carson, Compton, Gardena, Irwindale, Lawndale, South El Monte, and West Covina.
The purpose of the San Dieguito Union High School District’s stormwater management plan is to comply with applicable stormwater regulations, educate.
Paying for Water in California: Prop 218 Caitrin Chappelle, Associate Center Director April 28, 2015 Supported by the S. D. Bechtel, Jr. Foundation.
Budget Integration to Governmental Accounting Reports.
Managing One Water Mark Pestrella, P.E. Assistant Director LA County Public Works Southern California Water Dialog Sept 27, 2011.
Los Angeles County Flood Control District Water Quality Funding Initiative Southern California Water Dialogue June 22, 2011.
Bay Area Integrated Regional Water Management Plan North Bay Watershed Association Meeting November 3, 2006 Working together to enhance sustainable water.
Regional Grant Funding Coordination for Implementation of Watershed Management Plans Project Clean Water Summit July 15, 2004 David W. Gibson SDRWQCB
Department of Public Works NPDES Low Impact Development and Green Streets Resolutions City Council August 17, 2015.
Los Angeles River Watershed
Workshop on the draft General Permit for Discharges of Storm Water from Small MS4s Fresno August 6, 2002 Redding August 8, 2002 San Luis Obispo August.
FISCAL YEAR Discussion on Mid-Year Budget Adjustment: SAN JOAQUIN COUNTY DELTA ACTIVITIES 1 Tom Gau, Interim Director San Joaquin County Department.
IRWM Grant Program Scoping Meeting Department of Water Resources January 23, Sacramento January 31, Alhambra.
Building a Community Voice to End Homelessness – Homeless Summit 2015 Michael D. Castillo Homeless Initiative County of Los Angeles November 19, 2015 County.
New Development and Significant Development 12/21/20151 New Development & Significant Redevelopment.
Storm Water Funding Leslie Laudon Assistant Deputy Director Division of Financial Assistance State Water Resources Control Board
Collaboration A Presentation to the Storm Water Roundtable By Richard A. Watson, AICP Richard Watson & Associates, Inc. Duarte, CA 16 February 2016.
Jennifer Fordyce State Water Resources Control Board – Office of Chief Counsel.
A presentation to the Storm Water Roundtable By Richard A. Watson, AICP Richard Watson & Associates, Inc. Duarte, California 16 February 2016 Update on.
picture Renee Purdy, Environmental Program Manager Los Angeles Regional Water Quality Control Board Renee Purdy, Environmental Program Manager Los Angeles.
Available Funding North/South Lahontan Colorado River Basin Sacramento River Mountain Counties Tulare/Kern San Diego Santa Ana Los Angeles Central Coast.
SB Los Angeles County Sanitation Districts and Stormwater Management Sharon Green Legislative & Regulatory Liaison February 16, 2016 Doc No.:
Watershed Monitoring *Background Watershed Stewardship Plan-2004 Gap Projects IRWMP-Dec Policies SFEI study-2007 Joint TC/WC meeting-June 2010 *Proposed.
Estimated Costs to Meet Permit MARY ANN LUTZ, GOVERNMENT LIAISON / POLICY ADVISOR CONGRESSWOMAN GRACE F. NAPOLITANO.
San Gabriel Valley Council of Governments
1 EASTERN MUNICIPAL WATER DISTRICT 2016 Legislative Priorities and Strategy, and Policy Principles Jolene Walsh, Senior Director of Public.
What is Stormwater? Direct result of rainfall Recharges groundwater by infiltration Produces “runoff” (excess rainfall after infiltration) May be concentrated.
Managing Stormwater in California Our Current Crisis and a New Pathway to Sustainability CEAC/PWOI Conference March 25, 2015.
MS4 Permit – Meaning, History, and Annual Report Results Watershed Partners 4/13/
Stormwater 101 History of the Clean Water Act MARCH 22, 2016 WEST COVINA CITY COUNCIL CHAMBERS.
Oxnard College Campus Budget Forum Presented by: Richard Duran, President John al-Amin, VP Business Services Scott Corbett, President Academic Senate April.
Why the Need for Increased Stormwater Funding? Citizens expect a higher level of protection from flooding Increased development.
Presentation to the Joint CSAC/LCC Homelessness Task Force
Stormwater Utility City of Rowlett
Special Joint Meeting of the Pasadena City Council & the Pasadena Unified School District Board of Education February 16, 2017.
OFFICE OF THE CITY CLERK AUGUST 24, 2017 REQUEST FOR DIRECTION REGARDING POTENTIAL AMENDMENTS TO THE CITY CHARTER THAT MAY BE NECESSARY TO COMPLY WITH.
Waste Discharge Permit: Paradise Irrigation District
MS4 Permit Compliance and EWMP Project Overview
Pasadena City Council September 26, 2016 Item 11
Presentation to the Livingston City Council on the Phase II MS4 Permit
OFFICE OF THE CITY CLERK DECEMBER 11, 2017 ITEM NO
OFFICE OF THE CITY CLERK JULY 24, 2017 UPDATE REGARDING THE CALIFORNIA VOTER PARTICIPATION RIGHTS ACT (CVPRA) AND THE STATE ATTORNEY GENERAL’S.
City Council Item 11 March 5, 2018
Consideration of Action Re: Commercial Cannabis Businesses
WATER PORTFOLIO. WATER PORTFOLIO WATER RESILIENCY CHALLENGES Fractured Jurisdiction Pollution Climate Change Limited Infrastructure Reliance on Imported.
Funding Water Quality Mandates
Los Angeles County Department of Public Works
FISCAL YEAR Discussion on Mid-Year Budget Adjustment:
ADOPTION OF RESOLUTIONS RELATED TO THE CALLING OF A GENERAL MUNICIPAL ELECTION CONSOLIDATED WITH THE STATEWIDE GENERAL ELECTION HELD ON TUESDAY, NOVEMBER.
November 2018 Ballot Measures
Adoption of the Fiscal Year 2019 Recommended Operating Budget
Managing urban watersheds
City Council February 4, 2019 Item No. 2
Ballona Creek Bacteria Exceedances
Presentation transcript:

San Gabriel Valley Council of Governments

What Is Stormwater? Stormwater - water running over land during or immediately after a rainstorm Includes dry weather runoff from car washing, pool drainage, etc. In the San Gabriel Valley –mainly originates from paved surfaces (parking lots, playgrounds, streets, etc.) Is typically captured through local drainage systems (storm drains) owned by municipalities 2

How is Stormwater Managed in California? 3 California regulates stormwater through a delegation from US EPA to State Water Resources Control Board (SWRCB) and its nine regional boards The Regional Board requires municipalities to achieve Clean Water Act compliance for stormwater through an MS4 permit MS4 is an acronym that stands for Municipal Separate Storm Sewer System – and the permit has nothing to do with sewers!

LA Regional Board’s 2012 MS4 Permit Creates a new, watershed-focused process for compliance. A watershed is an area of land that drains all the streams and rainfall to a common outlet Places a new focus on stormwater as water supply with water quality compliance achieved through infiltration Interim compliance is now encouraged through creation of Watershed Management Programs (WMPs) and Enhanced Watershed Management Programs (EWMPs) Otherwise, achieve compliance NOW! More than 30 different TMDLs (pollutant limits) have been identified 4

What is an EWMP? A WMP?  EWMP  Is assumed to comprehensively evaluate opportunities in a watershed area for collaboration on multi-benefit projects that, wherever feasible, retain all stormwater runoff from an 85 th percentile, 24-hour storm event in the area  Some compliance still necessarily achieved on an individual city basis  WMP  A city may either address permit requirements on an individual basis or through a collaborative process 5

EWMP/WMP Groups 6 Group NameCities/PermiteesPlan Rio Hondo/San Gabriel River Arcadia, Azusa, Bradbury, Duarte, Monrovia, Sierra Madre, County, LACFCD EWMP Upper San Gabriel River Baldwin Park, Covina, Glendora, Industry, La Puente, County, LACFCD, South El Monte, West Covina EWMP East San Gabriel Valley Claremont, La Verne, Pomona, San DimasWMP Upper Los Angeles River SGVCOG Cities: Alhambra, La Canada Flintridge, Montebello, Monterey Park, Pasadena, Rosemead, San Gabriel, San Marino, South Pasadena, Temple City, County, LACFCD, South El Monte Non-COG Cities: Burbank, Calabasas, Glendale, Hidden Hills, Los Angeles, San Fernando EWMP Lower San Gabriel River SGVCOG Cities: Diamond Bar Non-COG Cities: Artesia, Bellflower, Cerritos, Downey, Hawaiian Gardens, La Mirada, Lakewood, Long Beach, Norwalk, Pico Rivera, Santa Fe Springs, Whittier, LACFCD WMP Individual CitiesEl Monte, Irwindale and WalnutIndividual WMP

Estimated MS4 Capital Costs (2015) ■ Total estimated capital cost for LA County exceeds $20 billion ■ Total estimated capital cost for SGVCOG cities exceeds $6 billion ■ Upper San Gabriel River EWMP, full implementation by 2040: $2,520,487,000 ■ West Covina’s estimated cost: $380,459,000 7

Do We Really Have to Comply?  Federal and State law allows Regional Boards to levy fines for non- compliance  Per the Regional Board, failure to comply with the MS4 Permit conditions could result in the following non-compliant fines Mandatory minimum $3,000/day per violation up to $10,000/day maximum Maximum $25,000/day per violation if imposed by state court  Furthermore, violations of Federal Clean Water Act can be enforced by US EPA and by environmental groups Federal penalties could reach $37,500/day Attorney fee availability for enviros 8

Stormwater Lawsuits Happen!  Between , there were 16 lawsuits throughout the State brought against local agencies for stormwater permit violations  12 of the 16 cases have concluded via settlements (consent decrees) Those settlements have resulted in payment of $19.2 million in penalty costs, $3.5 million in plaintiffs’ attorneys fees, and $209k in additional monitoring costs  In 2012, the City of Malibu settled with Santa Monica Bay Keeper and the Natural Resources Defense Council for stormwater runoff violations Per the settlement, Malibu paid $6.6 million ($5.6 million infrastructure upgrades, $750k in legal fees, $250k for an ocean health assessment) 9

Why Now? Throughout California, only LA County has a MS4 Permit that includes compliance limits for 33 TMDLs through the establishment of WMPs and EWMPs However, in affirming with modifications the LA Regional Board order, the State Water Resources Control Board stated: “We direct all Regional Boards to consider the WMP/EWMP approach to receiving water limitations compliance when issuing MS 4 permits going forward.” (Order WQ at 50.) In January 2016, SWRCB adopted STORMS (Strategy To Optimize Resource Management of Storm Water). Values stormwater as a resource, and includes watershed-based evaluation of needs and coordinated implementation strategy 10

What Should Our Approach Be?  As the SGVCOG Water Committee has assessed the overall EWMP issue, we believe that our Cities need to engage in a three pronged approach: 1. Public Education 2. Advocate For Policy Change 3. Work Towards Compliance 11

Public Education  Stormwater issues have not been thoroughly discussed with city councils, let alone the public In addition, stormwater is such an complex topic that even municipal staff have found it difficult to engage in the subject  A coordinated public education effort is needed We must discuss both the importance of stormwater management, and the impracticality of current regulatory requirements 12

Advocate for Policy Change It is unrealistic to expect EWMP/WMPs to complete $6 billion worth of stormwater improvement projects in the SGVCOG region, most by 2028 to expect that property owners would approve an adequate tax increase to fund stormwater projects A coordinated lobbying effort advocating for stormwater policy changes is needed, at Regional Board, SWRCB, Legislature & Congress to e.g., Redirect state tire fee from air pollution to stormwater Seek codification of financial capability limit (November 2014 EPA policy) Seek Extended Producer Responsibility for zinc in tires, or elimination Seek state fund or no liability for groundwater pollution caused by infiltration We need more electeds to help with advocacy! 13

Meanwhile, Work Towards Compliance All local regional WMPs and EWMPs have now been approved! Need to demonstrate good faith efforts towards compliance – “Once the WMPs/EWMPs are approved, ensuring that they are diligently and timely implemented must remain a priority for the [LA] Board.” SWRCB Order WQ at 53 Important to have installed water quality monitoring equipment Then, begin implementation of the most cost-effective projects The Adaptive Management Process allows for potential plan changes based upon water quality monitoring data and new information Consider partnering with the Sanitation District per SB

Next Steps: Seek Potential Funding Sources  $230 million in Prop. 1 Stormwater grants are available (Implementation Round 1: 7/8/16; Round 2, 2017 dates TBD)  Some municipalities are advocating for a 2% allocation of funds from the Transportation Measure R2, anticipated for the November ballot - Metro Board decision likely June 2016 Possible legislation to: Redirect state tire fee from air pollution to water that is polluted by stormwater Seek financial capability limit (November 2014 EPA policy) Seek Extended Producer Responsibility for zinc in tires, or phased elimination Seek state fund or no liability for groundwater pollution caused by infiltration Seek authorized use of existing infrastructure (LAFCD) 15

LA County Drought Resiliency Work Plan On April 5, 2016, the LA County Board of Supervisors voted 4-1 to create a Drought Resiliency Work Plan. The plan would be designed to implement projects that improve capture of water, improve water quality, and include geographically distributed, multi- benefit projects that benefit water management The LA Co. Department of Public Works is tasked with developing a plan for the funding system and reporting back to the Supervisors early July. The funding mechanism, if adopted by the Supervisors, would be submitted to “appropriate voters” subsequent to the Nov general election Would this provide sufficient funding? Doubtful 16

Proposition 218 Implications  Proposition 218, is a property-related tax which cannot be imposed unless it is approved by the majority of property owners or by 2/3 of the electorate  However, Proposition 218 allows a protest vote process for approval of utility-related fees (i.e., water / sewer fees)  California courts have held that stormwater is not a “utility” service  However, cost of stormwater can be recovered through Prop. 218 if water supply augmented (AB 2403) – not tested yet  A proposal emerged to amend Cal. Const. Section X re Water to treat stormwater as a utility, expressly approve tiered rates, and establish low income water rates from a water revenue fund – not this year 17

Other Next Steps Monitor (or participate in) existing litigation City of Gardena v. State Water Resources Control Board and Regional WQCB City of Duarte v. Regional WQCB, SWRCB Natural Resources Defense Council v. State Water Quality Control Board and Regional WQCB. Los Angeles County has joined the Water Boards as defendants of the lawsuit Prepare for the next permit. The current permit expires Dec. 18, 2017 and a new application will be due 180 days prior (July 1, 2017!) 18