Developed from a summary prepared for the New York State Association of MPOs 1.

Slides:



Advertisements
Similar presentations
MAP-21 Performance Management Framework August 8, 2013 Sherry Riklin Bob Tuccillo Angela Dluger The Moving Ahead for Progress in the 21st Century Act (MAP-21)
Advertisements

Capital Investment Program Listening Session Presented at APTA Annual Meeting -- 10/03/2012 RailVolution /14/
1 How to Succeed in Statewide and MPO Transportation Planning.
JULY 23,  Legislative Update ◦ Highway Trust Fund status ◦ Reauthorization proposals ◦ FY15 Appropriations  TTP Safety Funding  TTP Bridge Funding.
MAP Washington State Public Transportation Symposium August 26, 2013.
January 16, 2014 Federal Highway Administration Arizona Rural Transportation Summit.
MAP-21 Overview and Programmatic Impacts February 4, 2013 Serge Phillips MnDOT Federal Relations Koryn Zewers.
1 SAFETEA-LU Major Public Transportation Provisions of the Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users Federal.
Florida Commission for the Transportation Disadvantaged 07 August 2013 Jennifer Hibbert Director FTA Office of Planning and Program Development.
Bicycle and Pedestrian Funding Overview NYS Bicycle and Pedestrian Advisory Council August 2, 2010 Albany, New York.
© 2015 AMPO 444 North Capitol Street NW, Suite 345 Washington, DC tel: fax: Washington Update MAP-21 Reauthorization, Highway.
U.S. Department of Transportation Federal Transit Administration Region IV Introduction to FTA Grant Programs.
Performance Measurement Requirements Notice of Proposed Rule Making.
Funding Levels Similar funding levels to the Transportation Enhancement Activities under SAFETEA-LU: FY 2013: $808,760,000 FY 2014: $819,900,000 Total.
Statewide Local Agency Project Delivery Conference SAFETEA-LU: Earmarks and Federal Programs Relating to Local Agencies Travis Brouwer ODOT Federal Affairs.
State and Federal Funding Programs for Local Agency Projects Alan Lively Local Government Section Project Delivery Specialist.
U.S Department of Transportation Federal Highway Administration Federal Transit Administration MAP-21 Moving Ahead with Progress in the 21 st Century Linking.
East-West Gateway Council of Governments February 25, 2009 American Recovery and Reinvestment Act: Transportation Elements.
FY 2012 President’s Budget Released February 14, 2011.
Distribution Guided by State Law Surface Transportation Program (STP) Surface Transportation Program (STP) Congestion Mitigation & Air Quality Improvement.
Highway Program Financing July Michigan Allocations Federal Law + State Law + Michigan Policy = MDOT & Local Allocations of Federal Apportionment.
Ron Hall Tribal Technical Assistance Program Colorado State University
MAP-21 Moving Ahead for Progress in the 21 st Century Virginia Association of Planning District Commissions October 4, 2012.
KEY PROVISIONS OF THE DRIVE* ACT H.R. 22, as passed by the Senate on July 30, 2015 *Developing a Reliable and Innovative Vision for the Economy Thomas.
Washington Update Paul Feenstra ITS America / Keystone Public Affairs.
SAFETEA-LU Elderly & Persons with Disabilities (5310) Job Access Reverse Commute (5316) New Freedom (5317)
MOVING AHEAD FOR PROGRESS IN THE 21 ST CENTURY MAP-21 Volusia TPO TCC & CAC Presentation – August 21, 2012.
U.S./Canada Transportation Border Working group April 9, 2014 Roger Petzold Office of Planning Federal Highway Administration.
MOVING AHEAD FOR PROGRESS IN THE 21 ST CENTURY MAP-21 Volusia TPO Board Presentation September 25, 2012.
Financial Planning Session E-1 The Metropolitan Transportation Planning Process.
Transit Funding 101. Exciting  Management issue? Service levels Wages/benefits Safety Layoffs Why Care About Transit Funding?
Title Subtitle Meeting Date Office of Transportation Performance Management MAP-21 Moving Ahead for Progress in the 21 st Century Performance Measure Update.
2014 Tennessee Highway Safety & Operations Conference: Funding Outlook Pamela M. Kordenbrock Division Administrator FHWA – Tennessee October 28, 2014.
Freight Mobility Strategic Investment Board December 6th, 2013 Ashley Probart Deputy Director Freight Mobility Strategic Investment Board Primary Freight.
1 SAFETEA-LU Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users Office of Program Management Tribal Transit Outreach.
SAFETEA-LU Reauthorization Process and USDOT’s Reform Proposal November 2008 Todd Kohr Office of the Assistant Secretary for Transportation Policy U.S.
Transportation Funding Workshop Nova Southeastern University December 10, 2012.
Freight Project Financing Challenges, Questions and Options presented by Michael P. Huerta Cambridge Systematics, Inc. April 30, 2001.
SAFETEA-LU Operations, ITS, and Freight Provisions Jeffrey F. Paniati Office of Operations Federal Highway Administration U.S. Department of Transportation.
SESSION 5: TRANSPORTATION ISSUES Rob Henken President, Public Policy Forum August 5, 2014.
SAFETEA-LU System Management and Operations Key Provisions Jeff Lindley Office of Operations Federal Highway Administration U.S. Department of Transportation.
Complete Streets Vision McNichols to Quarton Wide sidewalks with street trees + amenities.
U.S. Department of Transportation Planning Certification Review National Capital Region Transportation Management Area TPB Tech Committee Briefing March.
Federal Funding Challenges and Opportunities David Vozzolo Vice President National Transit Planning and Project Development.
Jeffrey F. Paniati Associate Administrator for Operations Federal Highway Administration US Department of Transportation Congestion Initiative Update I-95.
Transportation Equity Act for the 21st Century TEA-21 Prepared by Iowa Department of Transportation September 1998.
Legislative Update – Transportation Bill FAST Act (Fixing America’s Surface Transportation Act) Five-year reauthorization with $305 billion in funding.
Fixing America’s Surface Transportation (FAST Act) Association of MPOs 444 N Capitol St., NW Suite345 Washington, DC
Association for Commuter Transportation Best Work Places for Commuters
Federal Transit Funding for Transportation, Community & System Preservation U.S. Department of Transportation Federal Transit Administration.
Federal-Aid Funding County Highway Accountants Conference May 10, 2007 zpowerpoint/ProjManagersCriticalIssuesBOB Feb07.ppt.
Statewide and Nonmetropolitan Planning Regional Transportation Planning Organizations (RTPOs) State Programs Meeting 8/7/13 John Sprowls Community Planner,
Association of Metropolitan Planning Organizations Fixing America’s Surface Transportation (FAST Act) April 7, 2016.
Title Subtitle Meeting Date Office of Transportation Performance Management MAP-21 and Managing National Highway Performance Michael Nesbitt Federal Highway.
FAST, What does the new transportation bill mean to you April 6, 2016.
Welcome to Columbia!. FAST Act Signed by President Obama on December 4, 2015 First long-term authorization act in a decade Result of bipartisan cooperation.
Federal Performance Update MPO Coordination Meeting May 10, 2016.
TRANSPORTATION PROGRAMS Financial Planning and Fiscal Constraint Requirement MAG Regional Council February 24, 2010.
MAP 21 Freight Talking Freight December 14, 2011 Leo Penne AASHTO.
Statewide Transportation Planning Oklahoma DOT Planning Process Statewide Long Range Transportation Plan Statewide Freight Transportation Plan Arkansas.
The FAST Act: What it means for the Treasure Valley
P.L Fixing America’s Surface Transportation (FAST) Act
APTA Webinar with Congressional Transit Staff– Overview of the FAST Act January 20, 2016.
FAST Act Overview $305 billion 5 year bill – FY ‘16 – FY ’20
River to Sea TPO Board Meeting September 28, 2016
River to Sea TPO Board Meeting October 26, 2016
APTA Webinar with Congressional Transit Staff– Overview of the FAST Act January 20, 2016.
P.L Fixing America’s Surface Transportation (FAST) Act
River to Sea TPO CAC & TCC Meetings September 20, 2016
Take Your Money and Run! Federal Transit Funding Opportunities
Presentation transcript:

Developed from a summary prepared for the New York State Association of MPOs 1

 Congress passes multi-year authorizations for the programs of the Federal Highway Administration (FHWA) and Federal Transit Administration (FTA)  ISTEA (1991)  TEA-21 (1998)  SAFETEA-LU (2005)  MAP-21 (2012)  FAST Act (2015)  Authorization establishes policy and sets maximum spending levels for each program 2

 Passed on December 4, 2015  Five year authorization extends through Federal fiscal year 2020 (Sept 30, 2020)  Total authorized spending $304.7 billion  Modest increases in most programs  Uses various funding mechanisms to avoid dealing directly with the annual shortfall in the Highway Trust Fund 3

 Funding may not exceed authorized levels, but may be less  Limits may also be established on how much of the funding may be obligated  Congress may pass a rescission after the fact, and take some of the appropriated funding back 4

 MPO designation unchanged: base population 50,000; TMA designation 200,000  ISTEA began the policy of enumerating factors to be considered in the long range transportation plan; there have been small changes with each authorization.  FAST adds two new planning factors:  Improve the resiliency and reliability of the transportation system and reduce or mitigate stormwater impacts of surface transportation  Enhance travel and tourism 5

 MAP-21, passed in 2012, made a number of policy changes and program consolidations  Rules of MAP-21 that guide program delivery are still in effect under FAST Act, but many have not yet been finalized  Capital investments under the plan should include strategies to reduce vulnerability due to natural disasters 6

 Focus on freight and its support of the national economy  National Multimodal Freight Policy/ National Multimodal Freight Network  Includes National Freight Network (highways); Class 1 railroads; major seaports; major air cargo hubs; inland waterways including St. Lawrence Seaway, Great Lakes  Critical Urban Freight Corridors: in metro areas >500,000 population, MPO designates; in remaining metro areas, state designates in consultation with the MPO 7

 Reinstates the competitive bus and bus facilities grant program at USDOT - $268M in 2016 growing to $344M in 2020  These remain in place under FAST  Performance based planning and programming  FTA programs consolidated  Surface Transportation Block Grant Program: renames STP, but with no eligibility changes  Transportation Alternatives Program (TAP) is no longer a named program; eligible purposes remain under a funding set-aside from STBGP 8

FHWA Total $226.3 BAnnual Average (millions) % change from 2015 National Highway Performance Program$23, Surface Transportation Block Grant11, Transportation Alternatives Set-aside CMAQ2, HSIP2, Metropolitan Planning – PL National Highway Freight Program (?)1,249(new) Nationally Significant Freight & Highway Program (?)900(new) 9

FTA Total $61.1 billion ProgramFY 2016 funding (millions)Notes 5307 (Urban formula)$4, bus rule modified to include non-ADA paratransit 5339 (Bus & Bus Facilities)428 (formula) 268 (discretionary) Cost Effective Capital Investment Pilot Program 5303 (Metropolitan Planning) 131 Continues joint planning language with FHWA 5309 (Fixed Guideway)2,300 New Starts max 60% FTA $; Small Starts threshold $300M 5310 (Enhanced Mobility for Seniors & Disabled) (Rural formula)620 10