February 4 th, 2013. Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.

Slides:



Advertisements
Similar presentations
TE / CRG / Paulo Gomes The Control System for the LHC tunnel cryogenics, p. 1 CERN Portuguese Teachers Programme, 7 Sep 2011 Dr. Paulo Gomes on behalf.
Advertisements

LHC UPS Systems and Configurations: Changes during the LS1 V. Chareyre / EN-EL LHC Beam Operation Committee 11 February 2014 EDMS No /02/2014.
31.March.2004 C. A. Martins, CERN AB/PO 1 Analysis of the possibility of using of a ALICE/LHCb type power converter in TT2A target test by Carlos DE ALMEIDA.
1. Commissioning of cryogenic crates using Mobile Test Bench 1. The Mobile Test Bench 2. Cryogenics crates and equipment – types of transducers and actuators.
HLTC 15 th April 2014 EDMS: Y. Muttoni EN-MEF-INT with the contribution of P. Fessia.
IBL CO 2 cooling control system development status Lukasz Zwalinski – PH/DT/DI Maciej Ostrega – PH/DT/DI Florian Corbaz – EN/CV/DC.
TE-MPE –TM, 16/05/2013, Mateusz Bednarek, TE/MPE-EE ELQA testing during and beyond LS1.
LHC Beam Screen Heaters: System overview, consolidation needs and project planning 4 February TE-CRG/JCC (Beam Screen Heater Review) 1.
Acknowledgments: O.Aberle – F.Bertinelli – J.C.Billy - O.Capatina - J.Casas - L.Ceccone - S.Claudet J.Coupard - K.Dahlerup - R.Denz - K.Foraz - J.J.Gras.
IMMW14, Ferney Voltaire, September 2005 (slide 1/35) Experience with configurable acquisition software for magnetic measurement.
Magnet Controls Group LCLS Magnet Controls August 16, Status of the LCLS Magnet PS Controls Needed for First Injection.
LHC ARC Commissioning report during LS1 Agenda: VRGPE documentation (former VRJGE) Active Penning modification By-Pass Valves modification LHC ARC commissioning.
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
Barriere O, Le Roux P
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
Workshop Chamonix XIV Shortcuts during installation and commissioning: risk and benefit H. Gruehagen, G. Riddone on behalf of the AT/ACR group 18 January.
LHC Access System August 2006 LHC Access System – Status and Planning August 2006 Elena Manola-Poggioli Eva Sanchez-Corral TS-CSE on behalf of the LHC.
LHC Hardware Commissioning Review May 2005, CERN, 1211 Geneva 23 1 LHC Hardware Commissioning Review Contribution ID: 20 – Quality assurance and.
Roman Pot Engineering Design Review CERN, 14 February 2006 M.Oriunno, CERN PH-TOT Installation, Commissioning and Schedule.
June 1 rst, Consolidation for E-cloud and High Voltage cards N.Vauthier TE-CRG LS1 projects review:
HC Review, May 2005 Hardware Commissioning Review Hardware Commissioning Review Quality Assurance and Documentation of Results Félix Rodríguez Mateos,
TE/MPE/EE J. Mourao T/MPE/EE 1 November 2012 LHC Machine Local protection Redundant Power supply (DQLPUR) & interface Module (DQLIM) progress status.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
Acquisition Crate Design BI Technical Board 26 August 2011 Beam Loss Monitoring Section William Vigano’ 26 August
MTF – Manufacturing and Test Folder Large Scale Deployment of MTF Sonia Mallón Amérigo Elena Manola-Poggioli on behalf of the EDMS Team, TS-CSE.
S. Claudet - 31st May 2007Power refrigeration for LHC Power refrigeration at 4.5K & 1.8K for the LHC S. Claudet, CERN AT-ACR.
MPE Review – June 2, 2015 A. Erokhin, TE-MPE-EE Upgrade, IST and Powering tests of the Upgrade, IST and Powering tests of the 600A Energy Extraction Systems.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
Rack Wizard LECC 2003 Frank Glege. LECC Frank Glege - CERN2/12 Content CMS databases - overview The equipment database The Rack Wizard.
TE-MPE-EP New DQLPU type A Production of 1300 new protection units TE-MPE-EP, VF, 23-Nov-2012.
60kW Thermosiphon control system
Nikolaos TRIKOUPIS, TE-CRG-CI LS1 projects review: feedback on projects and lessons learnt 01/JUN/2015, Indico
SAFETY DURING HARDWARE COMMISSIONING, 18 October 2007, D. Bozzini, AT/MEL-EM 1 Safety during Hardware Commissioning Davide Bozzini on behalf of the ELQA.
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
For more information, please contact 14/12/2010 EN/CV/DC Technical specification IT-3684 by Elena Perez Rodriguez.
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
The Control System for the LHC tunnel cryogenics Controlling Cool Accelerators Controle da Criogenia de Aceleradores de Partículas Dr. Paulo Gomes CERN.
B.Puccio MPE Workshop for LS1 / 22 & 23 Nov Logistics for DYPB activities Bruno PUCCIO (TE/MPE)
Conclusions on UPS powering test and procedure I. Romera Acknowledgements: V. Chareyre, M. Zerlauth 86 th MPP meeting –
TE-CRG Activities D. Delikaris, TE-CRG.
Tunnel Cryogenics Instrumentation & Controls for the LHC Enrique Blanco AB/CO IS.
R2E relocation & shielding LS1 preparation Anne Laure Perrot EN/MEF- LE Discussion with OP colleagues, 5 th July 2012.
TWEPP Paris, 09 Radiation Tests on the complete system of the instrumentation electronics for the LHC Cryogenics at the CNGS test facility Evangelia Gousiou.
11T Quality Assurance O. Housiaux, R. Berthet, S. Menu, R. Principe 3rd International Review on the 11T dipoles at collimator Section for the HL-LHC 6-8.
Two half-day seminars on the remaining work packages to complete the MEDICIS Facility POWER CONVERTERS FOR MEDICIS Davide Aguglia & Julien Parra-Lopez.
V Thermo-siphon Workshop Test protocol Jan Godlewski PH/DT-PO On behalf of thermo-siphon working group
IT-4135/EN Supply of Air Handling Units for Industrial HVAC Projects at CERN Technical Specification Paul Pepinster / EN-CV.
L. Tavian, TE/CRG, LSC Page 2 February 21 th, 2014 LS1 Committee (LSC) L. Tavian TE-CRG.
S A Griffiths CM42 June 2015 Electrical & Control.
Cabling for LHCb Upgrade
Beam Interlock System SPS CIBU Connection Review
Equipment simplified model SMR UR safety
Injectors BLM system: PS Ring installation at EYETS
SPS cryogenic proximity equipment and SM18 validation
T1 Electronic status Conclusions Electronics Cards:
MPE main activities planned for LS2
Renovation of the Accelerators Controls Infrastructure and its Assets Management Asset and Maintenance Management Workshop November 14th, 2013 Cl.Dehavay.
Renovation of the 45-year old PS magnets
GIS Portal Racks Project
Peer Review Agenda (Suggested).
TEST PLANS for HL LHC IT STRING
Teleconference ACS – FREIA 20th February 2018
CERN with UNICOS M. Pezzetti AT_ECR_CE 27 June 2005.
Model Output Current Battery Life BATPSU VDC 2A 1.2Ah BATPSU VDC 2.3Ah
Pierluigi Paolucci & Giovanni Polese
Teleconference ACS – FREIA 19th June 2017
Vacuum Controls Stephen Schuh Tom Porter 25 October 2006
Review of hardware commissioning
East Hall under construction
Rack installation and local tests for the MEBT Chopper Rack
Presentation transcript:

February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics EDMS

CONTENTS Introduction Production Installation & Commissioning Conclusion 1 Technical Review on Beam Screen Heater Electronics EDMS

Introduction 2 Technical Review on Beam Screen Heater Electronics EDMS

ELECTRONIC CARD PRODUCTION Due to volume (380 u.), time Schedule, and prototype reviews: NO PRESERIE Procurement : TE-CRG is in charge to provide identified critical components (i.e.: FPGA, ADC, DAC, precision resistors) TE-MPE Design Office is in charge to select manufacturer, provide standard components, front panel and contract follow-up Manufacturing requirements: QA: card has to be individually identified Automatic Optical Inspection mandatory before shipping Antistatic box for storage and shipping provide by TE-CRG Manufacturing report: AOI results vs equipment ID 3 Technical Review on Beam Screen Heater Electronics EDMS

ELECTRONIC CARD PRODUCTION Reception: Visual inspection CERN Part-ID labeling according to naming conventions for cryogenic instrumentation specification LHC-QI-QA-0002 v.1.2, EDMS MTF registration in collaboration with GS-ASE Technical Verification with existing JUTRON Test Bench and based on User Manual & Test Procedure, EDMS , prepared by E. Gousiou 4 Technical Review on Beam Screen Heater Electronics EDMS

ELECTRONIC CARD PRODUCTION Protocol: Consolidation code to new EH type card LabVIEW program : Voltage Set and Temperature Threshold 5 Technical Review on Beam Screen Heater Electronics EDMS LHC operationBeamNo Beam Power [W] Configuration ModeDCAC Load [Ohm] Voltage Input range0-60 V dc230 VAC - PWM

ELECTRONIC CARD PRODUCTION Acceptance criteria: Performance: DC/AC switch and operation modes V Input vs V Measured: ≤ 5% I Input vs I measured: ≤5% Power OFF when: Enable/Disable mode from control panel Simulated Temperature > Interlock Temperature Resource: Estimated time: 10 weeks, 1 FTE 6 Technical Review on Beam Screen Heater Electronics EDMS

POWER SUPPLY DISTRIBUTION Cabling Specifications: From LHC database layout 219 cables in LHC tunnel 78 cables in protected area Where Maximal Nominal Current = 2.5A Main switch: compatible for 2x200VA toroidal transformer In protected area: 30mA differential protection End point is defined by crate location (DCUM) Start point has to be fixed by EN-EL from existing infrastructure taking into account that UPS connexion is NOT mandatory Request fowarded to EN-EL-BT: mid-January Technical Review on Beam Screen Heater Electronics EDMS

POWER SUPPLY DISTRIBUTION Step-down transformer: Industrial procurement, and specification has to be finalized by end-of march with following requirements Toroidal type of 2x200VA Mechanical housing with tunnel and rack installation Compatible connectors for AC voltage Call for tender and order: 1rst april-2013 Delivery foreseen: 1rst september Technical Review on Beam Screen Heater Electronics EDMS

CONTROL SOFTWARE Update MTF database: Import equipment and test report from template Update LHC (controls) layout databases in collaboration with BE-CO Update control system in collaboration with EN-ICE New communication specification to be implemented in FEC Update CIET and CRYO interfaces Start date: march 2013 End date: before mid-Feb Technical Review on Beam Screen Heater Electronics EDMS

INSTALLATION & COMMISSIONING Instrumentation: Etablish Thermocouple and heater validation on machine side with local apparatus: Physical values conform to LHC installation traveller Isolation vs ground Check TC polarity using external powering source repairs if applicable This task should be partially done by IC train team 10 Technical Review on Beam Screen Heater Electronics EDMS

INSTALLATION & COMMISSIONING Power Supply Distribution: Protocole reception when cable and step down transformer installation are done: Performance: AC indicator conform to 142VAC Differential protection operational 11 Technical Review on Beam Screen Heater Electronics EDMS

INSTALLATION & COMMISSIONING Electronic card installation and validation protocol: Replace previous electronic card Using an external dummy load Remote connection to set and control heater powering Plug heater connector to the machine only if previous step is succesfull 12 Technical Review on Beam Screen Heater Electronics EDMS

INSTALLATION & COMMISSIONING Traceability and Quality Assurance : Validation of card replacement to update MTF with EAM-Light apex Handling retired equipment according to RP rules with TREC apex KDC300i, 2D Terminal BlueTooth 13 Technical Review on Beam Screen Heater Electronics EDMS

INSTALLATION & COMMISSIONING Resource: Global estimation for Instrumentation, Power Supply distribution, Electronic card and QA procedure is: 2 Weeks /2 FTE by sector Operating every single heater from PVSS in collaboration with Cryo operation team: 2 Days by sector Schedule: 14 Technical Review on Beam Screen Heater Electronics EDMS IC Train activity: instrumentation reception could start

CONCLUSION Manufacturing, installation and commissioning phases are now identified: QA procedure, Technical specification and resource Project compatible with Cryo commissioning if no significant delay in: Critical component procurement Prototype validation Power supply distribution Instrumentation validation starts already in 2013, therefore Installation and commissioning could be reduced by 1 month. This additional month would be allocated to prototyping Still request EN-MEF validation: LS1 official schedule Many thanks for your attention. 15 Technical Review on Beam Screen Heater Electronics EDMS