1 Towards Full GISC Compliance for IMD in 2010 -11.

Slides:



Advertisements
Similar presentations
WIS DATA-COMMUNICATIONS FUNCTIONS AND SERVICES WIS shall provide various types of services (with different quality of service) to meet the different requirements.
Advertisements

Status of Implementation at RTH Tokyo By Hiroyuki Ichijo Contents Contents 1. GTS facilities 2. GTS circuits 3. Use of the Internet 4. Collection of SHIP.
World Meteorological Organization Working together in weather, climate and water WMO Information System (WIS) Meeting of the ET-WISC Feb 2010 David.
WORLD METEOROLOGICAL ORGANIZATION Weather - Climate - Water
RTH AND NMC FUNCTIONS FOR GTS INFORMATION EXCHANGE T.K.RAY RTH,NEW DELHI,INDIA E Training Seminar on information and communication.
V-GISC Presentation – ET_WISC – Geneva - February v-GISC key functionalities ET_WISC meeting 2-5 February 2010 Jean-Pierre Aubagnac, Jacques Roumilhac.
Telecommunication status in RA VI RA VI Workshop on the implementation of WIS Sofia, Bulgaria, 1-3 November 2011 Matteo Dell’Acqua - Météo France Chair.
Understanding and Implementing WMO INFORMATION SYSTEM
1 World Meteorological Organization Report to WG-PIW RA VI September 2008 Presented by David Thomas (PM-WIS) WORLD METEOROLOGICAL ORGANIZATION Weather.
- 1 - Heinrich Knottenberg ET WISC: WIS Development in 2006.
Information System Design as a key to NMS Modernization, PWS implementation and WIS CBS-WIS Seoul, Nov 07th, 2006 Patrick BENICHOU (Chairman)
Value and Benefits of the WMO Information System (WIS)
Managing & Moving Weather, Water and Climate Information in the 21 st Century WMO Information System (WIS) 4 th WCRP Observations and Assimilation Panel.
1 WMO Information System (WIS) and the Next Generation of Worldwide Weather Data Exchange by: Robert Bunge (August 2013)
1 World Meteorological Organization WMO Information System WORLD METEOROLOGICAL ORGANIZATION Weather – Climate - Water.
National Institute of Meteorology and Hydrology BAS WIS Implementation in DCPC- SOFIA National Institute of Meteorology and Hydrology BAS.
IMPROVING THE UPTAKE OF GLOBAL DATA SETS Dr Wolfgang Grabs Chief, Hydrological Forecasting and Water Management Climate and Water Department
CMA’s new GTS system Submitted by YANG Genlu, China
Future WMO Information System (FWIS) Hiroyuki Ichijo (Japan Meteorological Agency) WMO/WSIS Session on Reducing Natural Disaster Risk through Technical.
WE Surface-based Global Observing System for Weather Dr Alexandre Karpov Task POC.
WORLD METEOROLOGICAL ORGANIZATION
1 1 Japan Meteorological AgencyET-WISC-3, EUMETSAT Germany, Jun.2008 JMA’s Status Report related to WIS Toshikazu NISHIO JMA ET-WISC-III Jun.
© Crown copyright Met Office Status Report WIS – WMO Information System Chris Little, Met Office, Co-chair OGC Met. & Oceanography Domain WG.
1 World Meteorological Organization AR report to ADC May 2008 Presented by David Thomas (WMO) WORLD METEOROLOGICAL ORGANIZATION Weather – Climate.
1 World Meteorological Organization AR report to ADC September 2008 Presented by Don Middleton (NCAR), on behalf of WIS and Dave Thomas, Jean-Michel.
© Crown copyright Met Office APSDEU / NAEDEX 2012 Chris Little, Met Office October 2012 Exeter, UK.
The WMO Information System (WIS)
1 World Meteorological Organization WMO Information System (WIS) Managing & Moving Weather, Water and Climate Information in the 21 st Century WORLD METEOROLOGICAL.
Deutscher Wetterdienst DWD GISC Node Current Status.
Deutscher Wetterdienst DWD GISC Implementation GISC Development Team.
Status of the Global Telecommunication System connected with RTH Tokyo Japan Meteorological Agency Presented by Masahiro Kazumori Eighth Meeting on Asia-Pacific.
NOAA’s NWS Telecommunication Gateway RTH Washington Fred Branski Office of the Chief Information Officer NOAA’s National Weather Service 20 th NamEurDEx.
STATUS OF IMPLEMENTATION AT RTH BEIJING SHI Peiliang, China
Status of the Global Telecommunication System connected with RTH Tokyo Sixth Meeting on Asia-Pacific Satellite Data Exchange and Utilization (APSDEU-6)
May 2008 ET-CTS Toulouse 1 Debriefing on WIS Aspects Discussions from the ICM IMTN Cloud 1 (Washington Nov 2007) Jean-François Gagnon Telecommunications.
Collaboration for Beijing and Tokyo GISC prototypes -- Status of WIS center development and planning -- Submitted by Hiroyuki ICHIJO (Japan) and SHI Peiliang.
Region I WIS Pilot Projects. Background Inadequate resources to meet the costs of leased dedicated links. Frequent outages of the leased dedicated links.
STATUS OF RTH MOSCOW (Submitted by Expert (Russian Federation)) ________________________________________________________________ Summary and Purpose of.
World Meteorological Organization (WMO) Observing and Information Systems Department WMO Information System (WIS) WMO Prepared by Timo Pröscholdt WIS Professional.
NOAA NWS Telecoms Report & WMO CBS Issues APSDEU-10 BoM - Melbourne, AU Feb 2010 Fred Branski, Intl Requirements and Data Liaison Office of the Chief Information.
1 World Meteorological Organization WMO Information System (WIS) Managing & Moving Weather, Water and Climate Information in the 21 st Century WORLD METEOROLOGICAL.
RTH NEW DELHI INDIA METEOROLOGICAL DEPARTMENT NARENDRA NIGAM
1 Development of GTS and Data Exchange in China National Meteorological Information Center, CMA.
Third Session of the Joint WMO-IOC Technical Commission for Oceanography and Marine Meteorology (JCOMM) Marrakech, Morocco, 4-11 November 2009 IODE Ocean.
Lecture Note No. 1 TRAINING SEMINAR ON INFORMATION AND COMMUNICATION TECHNOLOGY ON THE GTS T.K.RAY RTH NEW DELHI, INDIA E mail :
World Meteorological Organization Working together in weather, climate and water WIGOS and WIS WMO M. Berechree (WIGOS) D. Thomas (WIS)
WMO RA I WIGOS Implementation Workshop, Walvis Bay, Namibia, 2-4 November 2015 WIS CENTRES SUPPORTING WIGOS Francis Mosetlho OPS-FABL-WMO RA I WIGOS_2-4.
World Meteorological Organization Working together in weather, climate and water WMO Information System (WIS) Progress Report Document 3.5 Prof G-R-Hoffmann.
1 World Meteorological Organization WMO Information System (WIS) Managing & Moving Weather, Water and Climate Information in the 21 st Century WORLD METEOROLOGICAL.
1 World Meteorological Organization Report to ICT-ISS – Fourth Session November 2008 Presented by David Thomas (PM-WIS) WORLD METEOROLOGICAL ORGANIZATION.
Status of RTH Tokyo Japan Meteorological Agency Presented by Tatsuya Noyori Expert Team on WIS-GTS Communication Techniques and Structure (TOULOUSE, France,
Status of RTH Tokyo Japan Meteorological Agency Presented by Kenji Tsunoda Joint implementation-coordination meeting on the GTS-WIS MTN and meeting of.
WMO and Public Warning presented 9 December, 2008 at the “CAP Implementers Workshop" WMO Secretariat, Geneva by Jean-Michel Rainer, Director WMO Information.
RTH Moscow 1 STATUS OF RTH MOSCOW (Submitted by Expert Russian Federation) ________________________________________________________________ Summary and.
2nd GEO Data Providers workshop (20-21 April 2017, Florence, Italy)
Météo France GISC and DCPCs
How to keep WIS performance healthy
Status report of GISC Beijing
Requirement for Full Global Operation on WIS Survey on the WIS Doc
AR report to ADC 14 May 2007 Presented by Hiroyuki Ichijo (JMA)
OpenWIS contribution to WIS
Outcome of the ET-CTS Meeting (Toulouse, May 2008)
Status of IRIMO Data Center Submitted by: Farah Mohammadi (I. R
World Meteorological Organization (WMO) Observing and Information Systems Department Compliance Specifications of GISCs, DCPCs, and NCs in the WMO Information.
Future Requirements of WIS Centres
Status of RA II WIS Implementation Plan
Status Reprot GISC SEOUL
WIS Project Office WMO Managing WIS WIS Project Office WMO
GISC New Delhi Status Dr. S. L. Singh
GISC Beijing Status Report
Presentation transcript:

1 Towards Full GISC Compliance for IMD in

2 Status on implementation and operation of RTH New Delhi system as a Global Information System Centre in South Asian Region Seoul, Feb 2010

3 A major modernization program en-compassing observation, connectivity, supercomputing and forecasting facilities under an over-arching digital framework is currently under implementation in India. Under this modernization program RTH New Delhi system is being replaced by a new Central Information Processing System ( CIPS ) framework designed by Meteo France International (MFI) comprising two TRANSMET © message switches ( dedicated for national & international exchange respectively)

4 CIPS © with a 10 TF and 300 TB super-computing back - end and a Climatological system ( CLISYS ©). All information flowing through Transmet International and National message switches are separated into two streams, namely, Metadata files and the associated Data files and stored by corresponding table entries in the Oracle 10g © database of CIPS. The Transmet has been installed and is under trial operations for commissioning at New Delhi.

5 Main Telecommunication Circuits at RTH New Delhi SN CircuitSpeedProtocol 1 MTN MPLS (IMTN cloud II) Port: ND=128kbps, MO=512Kbps IP (3 bftp) Message (A/N, binary) 2 MTN MPLS (IMTN cloud II) Port: ND=128kbps, TK=1Mbps TCP/IP Socket Message (A/N, binary) 3 MTN 64 Kbps leased line TCP/IP SocketMessage (A/N) 4 RMTN MPLS (IMTN cloud II) Port: ND=128kbps, BJ=2Mbps IP (3 bftp) Message (A/N, binary) 5 JeddahRMTN 64 Kbps leased line TCP/IP SocketMessage (A/N) 6 RMTN 64 Kbps leased line TCP/IP SocketMessage (A/N) 7 RMTN 64 Kbps leased line TCP/IP SocketMessage (A/N)

6 SN CircuitSpeedProtocol 8 RMTN64 Kbps leased lineTCP/IP SocketMessage (A/N) Message (A/N, binary) 9 RMTN 64 Kbps leased line ( upgrade on ) TCP/IP SocketMessage (A/N) 10 RMTNInternet ( 30 Mbps )Internet Message (A/N) 11 RMTNInternet ( 30 Mbps )Internet Message (A/N) Message (A/N, binary) 12 RMTNInternet ( 30 Mbps )TCP/IP SocketMessage (A/N) 13 RMTNInternet ( 30 Mbps )TCP/IP Socket Message (A/N, BI, FX) Message (A/N, binary) 14 MaleRMTNInternet ( 30 Mbps )TCP/IP SocketMessage (A/N) 15 RMTNInternet ( 30 Mbps )TCP/IP SocketMessage (A/N) 16 New Delhi ToulouseBilat. MPLS (IMTN cloud II) Port: ND=128kbps, TO=4Mbps IP (bftp) Message(A/N, binary),files Message (A/N) Main Telecommunication Circuits at RTH New Delhi

7 Upgrade plans CircuitSpeedProtocolRemarks New Delhi - Thimpu, Bhutan NOPXXX New Delhi - Kabul, Afghanistan NOPXXX

Summary Understanding of WMO Information System IMD recent achievements ( ) Current situation in IMD (2010) Telecommunications Information System WIS compliance IMD Future achievements ( ) Expected situation in IMD 2011 Telecommunications Information Systems WIS compliance

WIS Architecture Catalogue 3 kinds of WIS centres: National Centres ( NC ) National observations Data Collection and Production Centres (DCPC) Value-added products Global Information System Centres (GISC) World synchronized catalogue

What is required for a WIS compliant NMS ? AMSS With a WIS interface Data Centre (NIS) Real time Data Centre Climate Data Centre WIS Layer System Full integration Between above components With GTS With external WIS nodes

IMD Recent Achievements IMD Formal Application for New Delhi as a GISC (November 2008) How IMD Global Modernization Program already contributes to WIS compliance ( ): ComponentSolutionWhen WIS Layer(temporary)SIMDAT2010 AMSSTransmet2009 Information System Data CentreCIPS2010 Information System ClimateCliSys2010

Current situation in IMD New Delhi HQ (Telecommunications) IMD (Delhi) Already main RTH of South Asia Dedicated bandwidth with high reliability (i.e. RMDCN of RA-VI) Mix of dedicated and publicly shared network (i.e. INSAT VSAT) Non-dedicated shared network (i.e. 30MBps Internet) New Transmet AMSS In operation since end of 2009 (29 th Oct 2009)

Current situation in IMD (Information Systems) Central Information & Processing System (CIPS) Data Center for real-time and long- time archived data, including 25 years of INSAT imagery, and NWP output Post-Processing system for NWP Start operation in June 2010 Climate Management System (CliSys) Start operation in June 2010

Current situation in IMD (WIS Software) SIMDAT as pilot implementation of WMO Information System Start of operations in June 2010 CIPS WIS Harness for SIMDAT Metadata catalogue generation Data and product access Start of operations in June 2010 CliSys WIS Harness for SIMDAT Metadata catalogue generation Start operation in June 2010

Current level of WIS compliance (TechSpec) Tech SpecsStatus WIS-TechSpec-1 Uploading of Metadata for Data and ProductsFulfilled by CIPS, CliSys and SIMDAT as temporary solution WIS-TechSpec-2 Uploading of Data and ProductsFulfilled by Transmet (Basic RTH function) WIS-TechSpec-3 Centralization of Globally Distributed DataWill be available WIS-TechSpec-4 Maintenance of User Identification and Role Information fulfilled by SIMDAT, as pilot implementation WIS-TechSpec-5 Consolidated View of Distributed User Identification and Role Information WIS-TechSpec-6 Authentication of a User WIS-TechSpec-7 Authorization of a User Role WIS-TechSpec-8 DAR Catalogue Search and Retrieval WIS-TechSpec-9 Consolidated View of Distributed DAR Metadata Catalogues WIS-TechSpec-10 Downloading Files via Dedicated NetworksFulfilled by Transmet WIS-TechSpec-11 Downloading Files via Non ‑ dedicated Networks fulfilled by SIMDAT WIS-TechSpec-12 Downloading Files via Other Methodsfulfilled by SIMDAT WIS-TechSpec-13 Maintenance of Dissemination MetadataWill be available WIS-TechSpec-14 Consolidated View of Distributed Dissemination Metadata CataloguesWill be available WIS-TechSpec-15 Reporting of Quality of Servicefulfilled by Transmet

Function 1 Receive observational data and products that are intended for global exchange from NCs and DCPCs within their area of responsibility, reformat as necessary and aggregate into products that cover their responsible area - fulfilled by - Transmet MSS - GTS links to NC’s and DCPC’s Function 2 Exchange information intended for global dissemination with other GISCs Will be available Function 3 Disseminate, within its area of responsibility, the entire set of data and products agreed by WMO for routine global exchange (this dissemination can be via any combination of the Internet, satellite, multicasting, etc. as appropriate to meet the needs of Members that require its products) Fullfilled by - Transmet MSS - Satellite based broadcasting under review Function 4 Hold the entire set of data and products agreed by WMO for routine global exchange for at least 24 hours and make it available via WMO request/reply (”Pull”) mechanisms Available Function 5 Maintain, in accordance to the WMO standards, a catalogue of all data and products for global exchange and provide access to this catalogue to locate the relevant centre Available Function 6 Provide around-the-clock connectivity to the public and private networks at a bandwidth that is sufficient to meet its global and regional responsibilities; Available Function 7 Co-ordinate with the Centres within its area of responsibility a telecommunications infrastructure that can meet the requirements for information exchange within the area and that can exchange agreed time critical and operational critical information with other areas. GTS links: ok Dedicated links in case of bilateral agreement Function 8 Ensure that they have procedures and arrangements in place to provide swift recovery or backup of their essential services in the event of an outage (due to, for example, fire or a natural disaster) 24 hours supervision and Helpdesk available in 2010 Recovery step 1: backup GISC Recovery step 2: Disaster Recovery Centre in Pune Function 9 Participate in monitoring the performance of the system, including monitoring the collection and distribution of data and products intended for global exchange. fulfilled by Transmet MSS Current level of WIS compliance (Functions)

Expected situation in 2011 IMD as GISC South Asia Relation with NCs and DCPCs Relation with other GISC Initiate DRC process (Pune)

Expected situation in IMD 2011 (Information Systems) WISMet solution WIS software solution under development by MF/MFI/MetOffice Transmet WIS Harness Enable full GISC compliance for Transmet CIPS WIS Harness Enable full GISC compliance for CIPS CliSys WIS Harness Enable full GISC compliance for CliSys

Aimed configuration in IMD for full WIS compliance (2011) IMD Future Plans ComponentSolutionWhen WIS Layer(final)WISMet2011 AMSS Transmet +WIS Harness Information System Data Centre CIPS +WIS Harness Information System Climate CliSys +WIS Harness

IMD Future achievement for GISC Compliance 2010 Demonstration of partial compliancy Final design of broadcasting infrastructure Telecommunication infrastructure upgrade New GTS links Thimphu and Kabul 2011 Information Systems upgrade Implementation of WISMet in New Delhi WIS Harness implementation for Transmet, WIS Harness upgrade for CIPS and CliS ys Coordination with associated WIS Centres WIS Demonstration New Delhi GISC Centre trial period operations 2012 New Delhi GISC Centre operations

21 Thank you