Measure G Bond Projects. Message from the President ….. Monument Refurbishment Project.

Slides:



Advertisements
Similar presentations
Bond Construction Update Citizens Oversight Committee Long Beach Community College District July 21, 2008 BUILDING TOMORROW TODAY 1.
Advertisements

SHORELINE SCHOOL DISTRICT Site & Facilities Assessment September 22, 2008 SHORECREST HIGH SCHOOL.
Cathedral of the Immaculate Conception Project Information Session.
Recent Bond Accomplishments. Bordeaux Elementary Remodel.
ADA Improvements on Administration Buildings Indian Valley Campus (One Stop Project)
Draft FMP Priorities For Discussion Facilities Committee 3/5/13.
COMING NOVEMBER 2012 SHAWNEE HEIGHTS BOND REFERENDUM MORE INFORMATION WILL BE AVAILABLE SOON ON THE SHAWNEE HEIGHTS DISTRICT HOMEPAGE.
Bond Construction Update Citizen’s Oversight Committee Long Beach Community College District October 2008 EDUCATE  ENGAGE  EMPOWER 1.
Measure G Overview March 9, Measure G School Facility Improvement East Side Union High School District To provide greater security and safety, relieve.
Current Project Update October 25th 2012 Good Evening!!!
May 6, 2010 Irvine Unified School District HMC Architects.
School District Merger Study Crown Point Central School and Ticonderoga Central School Facilities April 17, 2013 Castallo and Silky Education Consultants.
Bond Construction Update Citizen’s Oversight Committee Long Beach Community College District January 25, 2010 EDUCATE  ENGAGE  EMPOWER 1.
Madison Elementary School District #38 Construction update Bond & Capital 6/5/12.
Why We Need It?  Lack of Space  Need to Meet Code Requirements  Inadequate Communications & Technology  Facility Maintenance Issues.
BOND 2013 Election Day November 5th. SMART School BOND 2013 November 5 th Ballot Proposal Bond proposal for facility & site improvements to address student.
Bond Construction Update Citizens Oversight Committee Long Beach Community College District April 25, 2012 EDUCATE  ENGAGE  EMPOWER 1.
ENERGY CONSERVATION & MODERNIZATION FOR GLENDALE COMMUNITY COLLEGE
Operating Budget Report Budget Office July, 2007 Dana Van Dyke, Budget Director.
HIGHLAND PARK BOND WORK The final results will be AMAZING!
Auraria Higher Education Center Case Study John Ismert & Frank Ellis Auraria Higher Education Center Facilities Management.
Building for Their Future Dublin Unified School District.
GUHSD CITIZENS COMMUNITY MEETING MARCH 24-26, 2015 Facilities and Capital Budget Overview This Presentation Will Be Posted On Our Website:
Board of Trustees September 1, 2010.
Foothill College & Space Science Center Bill Kelly Viron Energy Services (510) ext 13,
Facilities Maintenance Status Report John Ozurovich, Director Facilities – Saddleback College John Edwards, Director Facilities – Irvine Valley College.
Geary Public School 2010 Bond Issue Vote Tuesday December 14, 2010.
Bond Expenditure Report Per A.R.S. § (K) 7/1/13 - 6/30/14.
PROP K UPDATE Citizens’ Oversight Committee Meeting October 17, 2013.
LOCAL OPTION SALES TAX FOR EDUCATION APPROVED BY THE BOARD OF TRUSTEES SEPTEMBER 29, 2015.
DEDHAM PUBLIC SCHOOLS FY 2008 Approved FY 2009 Approved FY 2010 Approved Education Technology Program 275, Roof Replacement - High School750,
2014 construction bond planning Needs assessment- what are we missing Site visits- in and out of district Safety concerns Life cycle evaluations- where.
LOCAL OPTION SALES TAX FOR EDUCATION TIMELINE AND PROPOSED PLANS AS OF MAY 26, 2015 *THE DISTRICT CONTINUES TO SEEK INPUT/SUGGESTIONS FROM BOARD MEMBERS,
Bond Construction Update Citizens Oversight Committee Long Beach Community College District January 23, 2012 EDUCATE  ENGAGE  EMPOWER 1.
Keyport Public Schools Facility Planning 12/02/15.
Bond Construction Update Facilities Advisory Committee Long Beach Community College District April 26, 2010 EDUCATE  ENGAGE  EMPOWER 1.
MIDDLE TOWNSHIP PUBLIC SCHOOLS BOND REFERENDUM March 8, 2016 Bond Referendum BUILDING FOR OUR FUTURE.
General Fund – regular operating costs of the district Associated Student Body Fund – student activities Debt Service Fund – repayment of bonds Capital.
Bond Construction Update Facilities Advisory Committee Long Beach Community College District September 14, 2011 EDUCATE  ENGAGE  EMPOWER 1.
Option 1 New Construction (10,000 Square Feet) – Secure Entrance / Administrative Offices – Lobby / Connection to Greeno Building – Weight Room Renovations.
MODERNIZATIONS “The First Five” Golden West Elementary Lathrop Elementary Lincoln Elementary Sequoia Elementary Shasta Elementary December 8, 2015.
DEFERRED MAINTENANCE PROGRAM UPDATE REPORT Accomplishments and 2016 Planned Events October 1,
MODERNIZATIONS MEASURE G OVERSIGHT COMMITTEE September 8, 2015.
SINKING FUND PROPOSAL OCTOBER 3, SINKING FUND ADVISORY COMMITTEE PURPOSE: DEVELOP A LIST OF RECOMMENDED PROJECTS FOR THE 2012 SINKING.
LOCAL OPTION SALES TAX FOR EDUCATION APPROVED BY THE BOARD OF TRUSTEES SEPTEMBER 29, 2015.
Sustainability KSU Utilities Department. KSU Current Sustainability Initiatives: Plant Operations Update Energy Initiatives and Energy Savings Programs:
LOCAL OPTION SALES TAX FOR EDUCATION APPROVED BY THE BOARD OF TRUSTEES SEPTEMBER 29, 2015.
Vision for the Future Spring 2016 Campus Open Forum APRIL 7, 2016 STUDENT CENTER CONFERENCE ROOM.
Madison Elementary School District
Facilities Focus Group
Bond Project Update September 2017
Vassar strong vision Inspire Future Excellence…Learn, Achieve, Succeed
Building Services Summer 2016 Update
How we got to ‘U’ aka Measure ‘U’pgrade.
Capital Projects Requests
Cornwall Central School District
Strategic Planning & Operations
Bond and Override Report
MIRACOSTA COMMUNITY COLLEGE DISTRICT
FIVE YEAR CAPITAL FACILITIES PLAN (Five Year Plan)
Fort Cherry School District
Troy School District Bond Program – Series 1 Construction Update
Charter Oak Unified School District
Capital Outlay Workshop
Recent Bond Accomplishments
Troy School District Bond Program – Series 1 Construction Update
Portville Central School District
Moving from Consumers to Producers Kings Park Central School District
Dixon Middle School Project Update
Presentation transcript:

Measure G Bond Projects

Message from the President ….. Monument Refurbishment Project

Measure G Bond Status Capital and Scheduled Maintenance Projects SRID Expenditures by Site District Program Overview PC Fine Arts – 2016 (Now)PC Library – 1960s (Then)

Hazardous & Safety/ADA Projects Path of Travel ADA ImprovementPlano Fire Lane Improvement Campus Security Upgrades Network Video Recorder & Science Math Electronic Locks

Library & LRC Capital Projects Constructed a library and learning center with modern computer equipment and furniture. Before Construction Completed Capital Project

SCIENCE MATH REMODEL Remodeled the building interior and installed new laboratory equipment.

FITNESS CENTER CAPITAL PROJECT Constructed a new fitness center building and installed modern exercise equipment.

CAMPUS PLANT IMPROVEMENTS Installed a newer chilled water loops with new air handlers to be installed to provide conditioned air.

STUDENT CENTER REPAIR PROJECT Replaced the roof system, removed the swamp coolers, installed air conditioning, asbestos removal, and refurbished the Student Center interior.

Classroom & Building Upgrades Music Room Riser ReplacementNew Boiler for Locker Room Showers Academic Center, Fine Arts, Communication Arts, Health Careers, and Science Math HVAC & Roof Replacements Purchased and installed new classroom carpet/flooring and furniture or building equipment throughout the campus. New furniture has been ordered and will be installed in late May 2016 in CT 1303, CT 1304, SM 101A, SM 101B, SM 125, AC 118, AC 119. Also, new carpet is planned for Theater.

GYM Roof & HVAC Project Replaces, repairs and restores the roof system and completely replaces all HVAC for the Gym, Coaches Row, Locker/Shower rooms, weight room, 2 classrooms, restrooms, Trainer’s area and Nurses office. The Gym will receive a new metal standing seam roof system, the remainder of the project will have a Built up Roof (BUR) installed. The old swamp coolers will be removed and utilize the newer chilled water loops with new air handlers to be installed to provide conditioned air. Estimated Completion December 31, 2016

District SRID Spending Summary Original Measure G Budget: $ 180,000,000 Interest & Other Revenues: $ 23,043,193 Total SRID Funds: $ 203,043,194 Total Funds Spent To Date: $ 139,235,821 Total Funds Unspent To Date: $ 63,807,373

SRID Expenditures By Site

SRID Unspent Funds By Site

District Program Overview Design Projects 2nd Quarter Ending December 31, 2015

Planning With A Vision That Embraces The Future