GROUNDING SYSTEM OF HV/MV SUBSTATIONS FORMED THROUGH CABLE LINES WITH INSULATED METAL SHEATH.

Slides:



Advertisements
Similar presentations
Mitigation of AC Induced Voltage On Buried Metallic Pipelines
Advertisements

LEA Assessor Presentation LEP Results
© 2012 DEHN + SÖHNE / protected by ISO Separation Distance 1.
M 1 and M 2 – Masses of the two objects [kg] G – Universal gravitational constant G = 6.67x N m 2 /kg 2 or G = 3.439x10 -8 ft 4 /(lb s 4 ) r – distance.
Lecture 3 Three Phase, Power System Operation Professor Tom Overbye Department of Electrical and Computer Engineering ECE 476 POWER SYSTEM ANALYSIS.
Electricity Transmission and Distribution. Transformer A device that transfers electricity from one circuit to another.
Announcements Be reading Chapter 3
Lecture 8 Transmission Lines, Transformers, Per Unit Professor Tom Overbye Department of Electrical and Computer Engineering ECE 476 POWER SYSTEM ANALYSIS.
Lecture7 Development of Transmission Line Models Professor Tom Overbye Department of Electrical and Computer Engineering ECE 476 POWER SYSTEM ANALYSIS.
DET 310 UNDERGROUND CABLES
of Large Offshore Wind Farms
Preliminary Studies of the Electric Power Distribution for CLIC
ELG4125 Transmission and Distribution Systems
Zoran Gajić ABB AB Vasteras, Sweden
BME 6938 Neurodynamics Instructor: Dr Sachin S. Talathi.
IEEE Wind Farm Collector System Grounding for Personal Safety Summary of Topics.
APPLIED ELECTRICITY SS3
1.6 Real Single-Phase Transformer.
Connections of a CT and a PT to supply, load and relay.
CHAPTER 6 EARTHING SYSTEM.
EE 369 POWER SYSTEM ANALYSIS
Electrocution of Raptors
Announcements For lectures 8 to 10 please be reading Chapter 3
Announcements Please read Chapter 3 H4 is 4.34, 4.41, 5.2, 5.7, 5.16
Aleksandra RAKOWSKA Jozef LORENC Witold HOPPEL Poznań University of Technology Institute of Electrical Power Engineering DISTURBANCES IN POLISH 15 KV NETWORK.
ECE 476 Power System Analysis Lecture 7: Transmission Line Parameters Prof. Tom Overbye Dept. of Electrical and Computer Engineering University of Illinois.
Crosstalk Crosstalk is the electromagnetic coupling between conductors that are close to each other. Crosstalk is an EMC concern because it deals with.
Barcelona May 2003 Session 5 – Block 2 1 Geographical Information System and Genetic Algorithm based planning tool for MV distribution networks Minea.
Frankfurt (Germany), 6-9 June 2011 Analysis of Protection Malfunctioning in Meshed Distribution Grids Evita PARABIRSING Dr. Edward COSTER Dr. Marjan POPOV.
Announcements Please read Chapter 3; start on Chapter 6
SAFE PRACTICES IN POWER DISTRIBUTION SYSTEM UNDER NESCO.
A New Equivalent Circuit Extraction Method For Quasi-static Regions Benjamin D. Braaten Dr. Robert M. Nelson Yuxin Feng North Dakota State University.
MV Network Operation and Control Barcelona May 2003 Eugenio Di Marino Italy Session 3 Alpha 1 Block 1.
Frankfurt (Germany), 6-9 June 2011 Mark Davies Trevor Charlton Denis Baudin Mark Davies – UK – Session 2 – Paper 0376 New Design Methods to Achieve Greater.
Announcements For lectures 9 and 10 please be reading Chapter 3
ELECTRICITY IN THE HOME. Parallel Connections of Domestic Appliances Electricity boards distribute power to separate households using a pair of thick,
Utility Engineers, PC.  Generation  Transmission  Distribution.
POWER HOUSE.
A PRESENTATION OF PRACTICAL TRAINING ON “400KV GSS “ \
Department of Electrical Engineering
132KV GSS PIPAR CITY JODHPUR
A SEMINAR ON 400 KV GSS(RRVPNL) BIKANER.
Thermal Screen Grounding CERN - Dec. 10 th, 2003 Enzo Carrone The thermal screen grounding and the tracker: a scary concert Enzo Carrone.
Submitted To:- Submitted By:- Mr.
A PRESENTATION On 400KV GSS SURPURA JODHPUR
This project on Primary sub station of Visakhapatnam port trust at Visakhapatnam. It is 132kv/11kv substation with incoming feeder from APTransco and 11.
ELECTRICAL EARTHING.
Design considerations for the FCC electrical network architecture FCC week 2016, Rome, April 2016 Davide Bozzini - CERN/EN/EL With the contribution.
Electrical Power System SMJE 2103
Electrical Power System SMJE 2103 Electrical Power Delivery System.
6.2 Transformer and high-voltage transmission
Crosstalk Crosstalk is the electromagnetic coupling among conductors that are close to each other. Crosstalk is an EMC concern because it deals with the.
Generation and Distribution of electrical energy Grade 8.
AEP’s Ground Grid Resistance Measurement Procedure
Novel Simulation Method to Quantify Induced Voltage & Current between Parallel or Partially Parallel Proximity AC Transmission Circuits Xuan Wu, David.
Announcements For lectures 7 to 9 please be reading Chapter 5.
INFLUENCE OF METAL INSTALLATIONS INVOLVED WITH MAGNETIC FIELD OF FEEDING LINE ON GROUND FAULT CURRENT DISTRIBUTION IN A SUPPLIED HV/MV SUBSTATION Dr Ljubivoje.
AEP’s Ground Grid Resistance Measurement Procedure
PRACTICAL METHOD FOR ANALYSIS OF GROUNDING SYSTEM OF HV/MV SUBSTATIONS LOCATED IN URBAN AND SUBURBAN AREAS.
PRACTICAL METHOD FOR ANALYSIS OF GROUND FAULT CURRENT DISTRIBUTION ON GROUNDING SYSTEM OF LARGE HV SUBSTATIONS I. Among outgoing lines there is no any.
Boško Mijatović1, Čedomir Zeljković2
Luka Strezoski Marija Prica
ELEC-E8409 HIGH VOLTAGE ENGINEERING
POWER SYSTEM ANALYSIS INTRODUCTION.
EET 323 – Electrical System Design Lecture 9: Grounding
DISCRETE ASCENT OPTIMAL PROGRAMMING APPLIED TO NETWORK CONFIGURATION IN ELECTRICAL DISTRIBUTION SYSTEMS B. A. Souza H. A. Ferreira H. N. Alves.
Topic 1: Cables and conductors
Electrical components and systems
CHAPTER – 41 A.C. TRANSMISSION AND DISTRIBUTION
Distributive Property
Presentation transcript:

GROUNDING SYSTEM OF HV/MV SUBSTATIONS FORMED THROUGH CABLE LINES WITH INSULATED METAL SHEATH

OUTHGOING MV CABLE LINE WITH INSULATED METAL SHEAT

EQUIVALENT CIRCUIT FORMED THROUGH THE METAL SHEATS OF A CABLE LINE WITH INSULATED METAL SHEAT

APPLIED NOTATIONS HAVE THE FOLLOWING MEANING

ANALYTICAL EXPRESSION FOR GROUNDING IMPEDANCE AT THE BEGINNING OF THE CABLE LINE

ANALYTICAL EXPRESSION FOR THE ACTIVE CABLE LINE LENGTH AND FOR ESTIMATION OF THE AREA COVERED BY THE SPONTANEOUSLY FORMED GROUNDING SYSTEM L’a - active cable line length expressed in relation to the length of average cable line section.

ANALYTICAL EXPRESSION FOR THE CASE WHEN THE FIRST LINE SECTION IS SIGNIFICANTLY DIFFERENT IN COMPARISON WITH THE AVERAGE ONE

ACTIVE LENGTH AND GROUNDING IMPEDANCE OF THE CABLE LINE AS A FUNCTION OF THE GROUNDING IMPEDANCE OF THE SUPPLIED MV/LV SUBSTATIONS

CABLE LINES BELONGING TO ONE OF THE PRIMARY DIRECTIONS AND THEIR SIMPLIFICATION USED IN THE PROCEDURE OF METHOD DEVELOPMENT

DESCRIPTION OF THE METHOD OF CALCULATION

ANALYTICAL EXPRESSIONS FOR THE GROUNDING SYSTEM IMPEDANCE AND FOR THE TRANSFERRED POTENTIAL

ADDITIONAL NUMERICAL DATA NECESSARY FOR THE USAGE OF THE PRACTICAL EXAMPLE CONSIDERED IN THE FORMER CASE - total length of each of the cable lines is 4 km - each line supplies nine 10/0.4 kV substations - value of the grounding impedance |Zt| is: 1.0 Ω. - self-impedance of tree cable line metal sheaths: ( j 0.135) Ω.

MAIN CALCULATION RESULTS

TESTING AND EVALUATING OF GROUNDING SYSTEM FOR SUBSTATIONS LOCATED IN URBAN AREAS

TESTING CIRCUIT

MEANING OF THE USED NOTATIONS

FIRST CASE: TEST CURRENT CIRCULATES THROUGH THE ENTIRE FEEDING LINE LENGTH

SECOND CASE: TEST CURRENT PASSES ONLY THROUGH THE FEEDING LINE SECTION BETWEEN TESTED AND THE NEAREST TRANSIT SUBSTATION

MEANING OF THE USED NOTATIONS

PROBLEM THAT SHOULD BE SOLVED

GEOMETRICAL SHAPE AND SPACE DISPOSITION OF THE FICTITIOUS CONDUCTOR

ANALYTICAL EXPRESSIONS FOR THE RELEVANT IMPEDANCES

DETERMINATION OF THE ACTUAL GROUNDING SYSTEM IMPEDANCE

PRELIMINARY ESTIMATION OF THE SAFETY CONDITIONS

CONCLUSIONS 1.Presented analytical procedure enables observing the whole grounding problem of distribution HV/MV substations into an realistic frame work. 2.It was shown that the part of the ground fault current passing through the earth is dramaticaly smaller than it was considered until recently. 3. General conditions for solving grounding problem of distribution HV/MV substations located in urban and suburban areas are much better than it was considered until recently.

REFERENCES 1. Lj. Popović: ”Proximity effect between an earthing grid and external electrodes in an earthing system of high-voltage installations”, IEE Proceedings, Vol. 133, Part C, No. 6, September 1986, pp Lj. Popović: “Potential Distribution Along External Electrodes of a High Voltage Installation Grounding System”, IEEE Transactions on Power Delivery, Vol. 3, No. 4, October 1988, pp Lj. Popović: “General Equations of the Line Represented by Discrete Parameters; Part I: Steady State”, IEEE Transactions on Power Delivery, Vol. 6, No. 1, January 1991, pp Lj. Popović: “Practical method for the analysis of eathing systems with long external electrodes”, IEE Proceedings-C, Vol. 140, No. 3, May 1993, pp Lj. Popovic: ”Testing and evaluating grounding systems for substations located in urban areas”, IET Generation, Transmission and Distribution (DOI: /iet-gtd ). 6. Lj. Popovic: ”Comparative analysis of grounding systems formed by MV cable lines with either uninsulated or insulated metal sheath(s)”, Electric Power System Research (DOI: /j.epsr ). 7. Lj. Popovic: ”Active length of cable lines with uncoated metal sheaths as long grounding conductors”, European Transaction on Electrical Power (DOI: /etep.555).