HTS-2 – FY17 Budget Request Joe Ozelis, Sr. Eng. Physicist PIP-II Budget Retreat 26 April, 2016.

Slides:



Advertisements
Similar presentations
Superconducting Spoke Resonator Cavities and Cryomodules
Advertisements

Coupling Coil Test Facility Update Ruben Carcagno Fermilab September 20, 2012.
SRF Cryomodule Assembly Facility Plans Tug Arkan AAC, May 10-12, 2005.
128 April 2008 Spectrometer Solenoid Fabrication Update MICO Meeting 19 May 2008 S. Virostek, M. Zisman LBNL.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM24 at RAL June 1, 2009.
Cryo Capture Cavity II Progress Mike McGee April 6, 2005.
RF Unit Test Facility at NML & CM1 Test Plan Bob Kephart Fermilab IWLC-10 October 20, 2010.
Spectrometer Solenoids and Coupling Coils Primary Activities and Risks Going Forward Spectrometer Solenoids Completion of SS#2 magnetic mapping Completion,
Scientific Goals: V. Litvinenko’s RHIC retreat talk Commissioning Goals: I. Pinayev presentation last week Run 14 Goals: Complete assembly of 112 MHz SCRF.
We are Here! Gluex Collaboration Meeting May Engineering Status - Presented by Tim Whitlatch1.
RF Cavity / Coupling Coil Module
MEBT & RT CH Section Thomas Page Fermilab Accelerator Advisory Committee May 10 th – 12 th, 2006.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
F HINS Schedule of Activities in Meson During FY08 Bob Webber AD Safety Meeting December 5, 2007.
Vertical Test Stand in IB1 C.M. Ginsburg (Fermilab) for the IB1 VTS Group SRF R&D Meeting 6.July 2006.
ILCTA_IB1_VTS An in-ground vertical test facility for ILC SRF cavities at Fermilab Camille M. Ginsburg ILC SRF Technical Status Meeting 5.May 2006 for.
Cryomodule Development at Fermilab Don Mitchell Representing the SRF engineering community at Fermilab April 20, 2009 Tsukuba, Japan TILC09.
HINS Front-End R&D --- Status and Plans Bob Webber Fermilab Accelerator Advisory Committee August 7, 2007 Update of May 10 th – 12 th, 2006 AAC Presentation.
January 4, 2007 Project Overview RHIC II Project Internal Cost Review Roberto Than Cryogenics Systems January 4, 2007.
S1G Experiment Schedule Plan; H. Hayano ILC10 GDE meeting.
Overview and Status of the Fermilab High Intensity Neutrino Source R&D Program Giorgio Apollinari for Bob Webber.
EuCARD WP 7 – High Field Magnets Task – Radiation certification Status report EuCARD WP 7 – High Field Magnets Task 2 – Support studies Task
Muon Tracker Responsibilities This Year South arm commissioning through this year’s run Analysis Software oversight and development North Arm station 2.
FNAL efforts on LHC Crab Cavity R&D (Proposals for R&D sub-tasks, resources and schedule) Nikolay Solyak.
Industrial Participation & SRF Infrastructure at Fermilab Phil Pfund with input from Harry Carter, Rich Stanek, Mike Foley, Dan Olis, and others.
Resources, Timeline & Contingency UCN CDR (Sept/2010)
RHIC 56 MHz Cryomodule Informational Review RHIC Integration Cross-sectional view of 56 MHz Cavity in Vacuum Vessel.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
October, 2009 Cost of SRF Components Gary McIntyre October, 2009 Internal Review.
High Intensity Neutrino Source Program Overview for CD Controls Management Meeting Bob Webber October 6, 2006.
Detail plan of S1-Global H. Hayano (KEK),
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
5 K Shield Study of STF Cryomodule (up-dated) Norihito Ohuchi KEK 2008/4/21-251FNAL-SCRF-Meeting.
The SPL Short Cryo-module: Status Report V.Parma, CERN, TE-MSC On bahalf of the Cryomodule development team SPL seminar December 2012, 6-7 December 2012,
SPHENIX Mechanical Don Lynch & Rich Ruggiero April 10, 2014.
CMTF Infrastructure Jerry Leibfritz PIP-II Machine Advisory Committee 9-11 March 2015.
NML - RF Unit Test Facility Jerry Leibfritz Fermilab.
PX FY14 Budget PXIE Infrastructure R. Stanek J. Leibfritz.
SSR1 Summary Harry Carter & Tom Peterson 19 November 2010.
CMTF Cryogenics (status and plans) SRF program and AD/Cryogenics work presented by Arkadiy Klebaner May 21, 2013.
F ILC/SRF Strategic Planning OHAP Rich Stanek September 17, 2009.
Visiting DESY for S1-G module Norihito Ohuchi 2009/8/251 19th Biweekly Webex meeting (S1-G, Cryomodule, Cryogenics)
26 April, 2016 LCLS II Cryomodules and Cryoplant, Joe Preble LCLS-II Overview JLAB Organization for LCLS-II JLAB responsibilities & Schedule and Status.
Thomas Jefferson National Accelerator Facility Page 1 Dana Arenius Cryogenics Control Account Manager 12 GeV Upgrade Project X Collaboration September.
O. Kester, NuSTAR annual meeting, 27/02/2013
PXIE Layout and Infrastructure Building, Cryogenics, Utilities… Rich Stanek On behalf of the CMTF Team PXIE Collaboration Meeting November 28, 2012.
Workshop Goals and Project Management “120A ” – FY15 Budget Request Steve Holmes PIP-II Budget Retreat July 22, 2014.
Status of Vertical Test Stand at RRCAT P Shrivastava, P Mohania,D.Baxy, Vikas Rajput S C Joshi, S Raghavendra,S K Suhane RRCAT, Indore November 26, 2012.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
Development of Cryo-Module Test Stand (CMTS) for Fermi Lab (R.L.Suthar, Head,CDM, BARC) Cryo-Module Test stand (CMTS) is a very sophisticated equipment.
Horizontal Test Stand – 2 (HTS-2) Joe Ozelis PIP-II Collaboration Meeting 9-10 November, 2015.
Cryomodule Safety Approvals Jay Theilacker LCLS-II Production Cryomodule Final Design Review May 12-14, 2015.
SRF Test Facilities – Functions and Costs Alexander Romanenko Test Facilities Review 17 Mar 2015.
SPHENIX Mechanical Don Lynch & Rich Ruggiero April 10, 2014.
ESS Cryomodule Status Meeting – Introduction | | Christine Darve Introduction to Cryomodules for the ESS 2013 January, 9 th Christine Darve.
Proton PMG May 7 th 2015 Cons Gattuso AD Shutdown Manager.
Project Management – FY17 Budget Request: HWR Cryomodule Z.A. Conway and P.N. Ostroumov HWR Cryomodule FY17 Budget PIP-II Budget Retreat 26 April 2016.
WBS 1-7 System Assembly & Installation John Voirin August 10-11, 2011.
Teleconf ACS – FREIA 28th March 2017
RF Systems and Controls for the LERF CM Tests
CERN – Zanon discussions
Cryomodule test stand at ESS site
LERF as Cryomodule Testing Facility Set-Up and Installation Logistics
FRIB Cryogenic Support
Progress and Issues with VTS Upgrade
Prototype cryomodule development
Daresbury ESS In-Kind Contributions
Upgraded Injector Test Facility
QCM and C50-12 Status Update
Presentation transcript:

HTS-2 – FY17 Budget Request Joe Ozelis, Sr. Eng. Physicist PIP-II Budget Retreat 26 April, 2016

Standard Presentation Outline Resources required to meet target goals Goals that can be met with the initial resources allocation 4/26/2016J. Ozelis | HTS-2 FY17 Budget Presentation2

PIP-II HTS-2 - FY17 Initial Goals Progress on HTS-2 Feedcan/Cryostat Fabrication –Oversight/involvement in procurement process, vendor visits, meetings to track progress Support testing of production SSR-1 cavities in STC –Cryogenic support (M&S & Cryo Engineering) for production testing of cavities for pCM Develop backup plan for HTS-2 for 2018 –Modifications to STC to allow testing of 650MHZ elliptical cavities, ready at end of FY17 HTS-2 Facility Preparation at FNAL –Install cable trays, racks, RF distribution, ES&H, and vacuum systems Support Conceptual Design Report (CDR) and Resource Loaded Schedule (RLS) for HTS-2 program –Assist as needed/requested 4/26/20163J. Ozelis | HTS-2 FY17 Budget Presentation

PIP-II HTS-2 – Resources Required to Meet Initial Goals - FTE Progress on HTS-2 Feedcan/Cryostat fabrication –Engagement with RRCAT on procurement, vendor visit(s) Support testing at STC –Cryo engineering (ops) support STC modifications for 650MHz testing –Mech engineering and design, Procurement support, Installation/assembly HTS-2 facility prep at FNAL –Design of HVAC, RF distr, ES&H, vac systems, racks/cabel trays and install/assemble 4/26/20164J. Ozelis | HTS-2 FY17 Budget Presentation

PIP-II HTS-2 – Resources Required to Meet Initial Goals - FTE Support CDR and RLS development of HTS-2 for PIP-II –Support mgmt. as needed 4/26/20165J. Ozelis | HTS-2 FY17 Budget Presentation

PIP-II HTS-2 – Resources Required to Meet Initial Goals – M&S HTS-2 Feedcan/Cryostat (14k$) –Vendor visits Support testing at STC (62k$) –Cryogens (LHe, GHe, LN2) STC modifications for 650MHz (low power) testing (72k$) –Vacuum vessel, thermal shield and magnetic shield spool pieces –Cavity support structure –LHe header/sensor assembly & additional relief valve 4/26/20166J. Ozelis | HTS-2 FY17 Budget Presentation

PIP-II HTS-2 – Resources Required to Meet Initial Goals – M&S HTS-2 Facility Preparation (255k$) –Cavity and insulating vacuum pumping systems –Cryogenic controls/thermometry readout –Cable trays and racks –ODH system/alarms and HVAC –Enclosure gates/interlock switches/boxes –RF distribution (hardline, circulators, directional couplers, loads) –Cabling 4/26/20167J. Ozelis | HTS-2 FY17 Budget Presentation

PIP-II HTS-2 – FTE – By Job Category and Role ME –Cryo Eng. : Ops support for SSR1 testing in STC –Mech Des Eng : STC modifications for 650MHz operation, HTS-2 facility –Proc/Contr Eng (?) : HTS-2 mgmt., support RDR, HTS facility design Operations –Acc Sys Spec : STC modifications for 650MHz operation (RF) 4/26/20168J. Ozelis | HTS-2 FY17 Budget Presentation

PIP-II HTS-2 – FTE – By Job Category and Role Procurement –Proc: support procurements (SOW, RFQ) for STC mods and HTS-2 facility Design –Cryo Des : STC modifications for 650MHz operation –Mech Draft : HTS-2 facility prep (shld layout, racks, cable trays) 4/26/20169J. Ozelis | HTS-2 FY17 Budget Presentation

PIP-II HTS-2 – FTE – By Job Category and Role Mechanical Technician –Mech Assy : HTS-2 facility prep (racks, cable trays, cables) –Mech SRF Tech : HTS-2 facility prep (vacuum systems), STC mods assembly –Mech Sys Tech : HTS-2 facility prep (vacuum systems), STC mods assembly Electrical Technician –E Intlk Tech : HTS-2 facility prep (interlock systems) –Electronics Tech (RF) : HTS-2 facility prep (RF dist system) 4/26/201610J. Ozelis | HTS-2 FY17 Budget Presentation

PIP-II HTS-2 – FTE – By Job Category and Role Electrical Technician – cont’d –Elec Tech : HTS-2 facility prep (install cable trays, racks, cables, instr) Electrical Engineer –Elec Des Engr : HTS-2 facility prep (facility rack/cable layout) –Intlk Engr : HTS-2 facility prep (interlock design, implementation, integration) –RF Engr : HTS-2 facility prep (RF distr system layout, components, assy/integration) 4/26/201611J. Ozelis | HTS-2 FY17 Budget Presentation

PIP-II HTS-2 – Achievable Goals at Initial Target HTS2- Cryostat /feedcan procurement –M&S : 14k$ –FTE : 0.25 Support SSR1 testing at STC –M&S 61k$ –FTE : 0.07 Support STC modifications –M&S 72k$ –FTE : 0.64 Total : M&S : 147k$, FTE : /26/201612J. Ozelis | HTS-2 FY17 Budget Presentation