University Drive Road Diet September 8, 2015. Goals and Objectives A. Reduce vehicular speed in the corridor. B. Provide an attractive bicycle accommodation.

Slides:



Advertisements
Similar presentations
Reston Metrorail Access Group (RMAG) Status Report Board of Supervisors Transportation Committee September 20, 2011.
Advertisements

Reston Metrorail Access Group (RMAG) Status Report Board of Supervisors Transportation Committee November 29, 2011.
Complete Street Analysis of a Road Diet Orange Grove Boulevard Pasadena, CA Aaron Elias Engineering Associate Kittelson & Associates Bill Cisco Senior.
Road Diets and Roundabouts
Maryland Avenue and Arkwright Street Nick Fischer, EIT Ramsey County Jerry Auge, PE Project Manager Ramsey.
Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County April 2, 2013.
Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County June 25, 2013.
January 8, 2014 FMATS College Road Corridor Study FMATS Technical Committee Update.
Bailey Hill Road Safety Coalition Report to Churchill Area Neighbors Julia Pommert and Sue Palsbo January, 2008 Contact:
City of High Springs - Traffic Study City of High Springs Traffic Study Sept. 16th, 2003 Public Meeting #2.
Titusville to Edgewater Bike Loop PD&E Study
How did the Bicyclist Cross the Road? By: Mike Hendrix, PE, PTOEDate: June 26, 2012 A Case Study of Two Intersections in Seattle.
Tower Road Enhancement Project Prepared for Alachua County By Causseaux & Ellington, Inc. Alachua County Roadway Network Improvements.
County of Fairfax, Virginia Sully District Council Meeting November 19, 2014.
US 52 Corridor Study Public Meeting November 15, 2010.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
Greater Cleveland Regional Transit Authority THE HEATHLINE EUCLID CORRIDOR BUS RAPID TRANSIT PROJECT Michael J. Schipper, P.E DGM- Engineering & Project.
Reston Master Plan Thoughts on transportation. Focus is important Without the proper transportation groundwork other plans will fall through.
Ed Cox City of Sacramento, Department of Public Works Bicycle Solutions in Sacramento.
May 14, st Street and 2 nd Street Couplet Traffic Modification Project.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
Wiehle Ave. Traffic Concerns Created by Judy and Doug Pew.
Virginia Street Corridor Plan. From our Tier One University, world renowned recreation and our Midtown entertainment area to abundant cutting edge business.
Sidewalk Bikeways: A Safety Problem, Not a Safety Solution.
Lane Width Reallocations Based on 5-Year Crash Data Richard C. Moeur, PE ADOT Traffic Design March 2007 edition.
Pedestrian and Bicycle Concerns About Highway Design and Operation Barb Mee, AICP City of Asheville Transportation Department
Board of County Commissioners November 8, Recommendation Project Background and Location Traffic Analysis Comparison of Alternatives Public Meeting.
ROUNDABOUTS. What Is A Roundabout? A specific type of traffic circle Not all traffic circles are roundabouts.
Efficiency through technology and collaboration Road Diet (Roadway Reconfiguration) Every Day Counts 3 Innovative Safety Initiative.
In association with: THOMAS ROAD STREETSCAPE 73 RD STREET TO HAYDEN ROAD PROJECT NO. T0606 City of Scottsdale.
Route 28 South of I-66 Corridor Safety and Operations Study Technical Committee Meeting #2 June 25,
Presentation to the AMP Leadership Team Moving forward. April 17, 2013.
Access Management: Why And How? An Introduction To Access Management Problems, Principles and Treatments.
Hypothesis 1: Narrow roadways and roadways with higher speed limits will increase risk of vehicle/bicycle crash Hypothesis 2: Bicycle lanes and signage.
Northeast Ohio Areawide Coordinating Agency Kamm’s Corners Development Corporation.
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
County of Fairfax, Virginia Department of Transportation Richmond Highway Transit Center Feasibility Study Briefing with the Fairfax County Transportation.
1 Item 11: Review of Draft Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell TPB Staff Presentation to the Transportation Planning.
SR 997 / KROME AVENUE Florida Department of Transportation April 27th, 2006 South Miami-Dade Watershed Study Advisory Committee.
May 1, 2014 East Gude Drive Pedestrian Road Safety Audit Stakeholder Pedestrian Safety Meeting.
Roosevelt Road: State to Columbus Public Meeting September 22, 2015.
1 Item 12: Report on Draft Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell TPB Staff Presentation to the Transportation Planning.
The Main Street Bike Lane Project LADOT Bike Program.
Oregon Transportation Commission October 14, 2015 OR 99 Rogue Valley Corridor Plan.
STA Safety Project PID #76439 December 12, 2006.
Problem 1: Determination of Facility Types for Analysis.
March 8, 2005 Commonly Used Bike Routes  Roughly half are located on arterials.  Topography makes east-west movement more difficult.  No marked bike.
Analyzing the Mobility Impacts of TOD Level of Service in Transit Oriented Districts Service for Who?
Northside Transportation Network Community Meeting November 17 th, 2010 UROC.
Titusville to Edgewater Bike Loop PD&E Study FDOT Project Number: Volusia County, Florida FDOT Project Number: Brevard County,
US 25 Corbin to London Citizens Advisory Committee Meeting #3 May 2012.
Designing for Pedestrian Safety – Road Diets 9-1 ROAD DIETS.
 Rice Street Traffic Study Proposal Presentation to the Saint Paul CIB Committee March 31, 2015.
Peachtree Road Transformation Project: Operations and Safety Analysis P.I Fulton County August 25, 2015 Buckhead CID 1.
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
Pinehurst School Traffic Safety Pinehurst School Traffic Safety Meeting May 13-14, 2014.
Complete Streets Training
Corridor Management Plan. Nine Mile Road – Northern Project Limit Pensacola Blvd. (US 29) – Southern Project Limit 4.8 Miles Long 8 Signalized Intersections.
6-1 Module 6: Group Activity Wright County Safety Review Identifying Opportunities for Making Roads Safer 6-1.
Martin J. Walsh Mayor Michael Dennehy Commissioner Public Hearing January 20, 2015.
District VI, Florida Department of Transportation SE 2 nd Avenue and SE 4 th Street/Biscayne Boulevard Way March 25 th, 2014 Bicycle/Pedestrian Advisory.
Complete Streets Training Module 4a – Understanding Context.
Secondary & Cumulative Effects Analysis Training Program Module 1: How to Determine Which Resources Should be Considered in a SCEA How to identify what.
Norwalk Bikeway and Pedestrian Transportation Plan Fitzgerald & Halliday, Inc. with Alta Planning + Design and Stantec Innovative Planning, Better Communities.
Bicycle Lanes for the City of Boston
Project Management Team Meeting #3
HSM Applications to Multilane Urban Suburban Multilane Intersections
Protected Bicycle Lanes Finally Pedal Their Way to KC…
Project Location: 35th Ave HSIP8
Module 6 A 21st Century Transportation Network
Presentation transcript:

University Drive Road Diet September 8, 2015

Goals and Objectives A. Reduce vehicular speed in the corridor. B. Provide an attractive bicycle accommodation on University Drive, identified as a bike- friendly street in the City’s bicycle plan. C. Ensure that new roadway configuration will not have unacceptable negative impacts to traffic or to transit bus operations. 2

Study Area Intersections University Drive (VA 6627) at 1. Main Street (VA 236) 2. Sager Avenue 3. Fire Station #3 4. Armstrong Street Current land use is primarily business/ commercial, surrounded by low, medium, and high-density residential Breckinridge Ln Main St Sager Ave University Dr Armstrong St South St

University Drive in the City’s Bike Plan 4 University Drive considered an existing “on-street trail,” but no bike amenities exist in this section. “Missing Link” in the Mason to Metro to Mason Bike Trail. Roadway configuration – no signals between Sager & Armstrong. Few cyclists seen in field observations. Breckinridge Ln

Road Diet Case Studies Two comparable road diets: Reston, Virginia: Lawyers Road Bethesda, Maryland: Battery Lane In both locations, a four-lane roadway was reduced to improve safety and provide accommodation for bikes. 5

Reston, Virginia: Lawyers Road 6 Objective Reduce crashes and speeding Improve safety and connectivity for bicyclists Features 2-mile section Suburban Area Low-density residential No Curbs or Sidewalks Average Daily Traffic (ADT) 10,000 vehicles per day

Reston, Virginia: Lawyers Road 7 Results Analysis of speeds confirmed operating speeds reduced after Road Diet implementation. In response, VDOT lowered the speed limit on the 2-mile section of Lawyers Road from 45 mph to 40 mph. Five years after, 70 percent reduction in crashes. Key findings of road user survey (784 completed surveys):  69 percent thought Lawyers Road seemed safer.  47 percent bicycled more often.  69 percent perceived no significant increase in auto travel times.  59 percent perceived a reduction in auto speeds.  74 percent agreed the Road Diet improved Lawyers Road.

Bethesda, Maryland: Battery Lane 8 Objective Support new bicycle route Features 0.85-mile section Suburban Area Residential Apartments near downtown Bethesda Sidewalks and Bethesda Trolley Trail Average Daily Traffic (ADT) of 4,820 vehicles per day after Road Diet (little to no change)

Bethesda, Maryland: Battery Lane 9 Battery Lane in 2009 with four-lane section Battery Lane in 2014 with two-lane section, bicycle lanes, and parking on south side

Intersection Level of Service (Existing Four- Lane) 10 AMPM LOS A, B, or C LOS D or E LOS F Breckinridge Ln Main St Sager Ave University Dr Armstrong St South St

Recommended Road Diet Treatment 11 Reduce the through lanes to one in either direction, with center two-way left-turn-lane (TWLTL) from Armstrong Street to South Street. All lanes 10’ wide. Utilize extra space on either side of roadway for bike lanes in either direction.

Recommended Road Diet Treatment 12 Bike lanes vary from 6.5’ to 7.5’, including gutter Road widens to 50’ (gutter-to-gutter) where it shifts to the left. Use extra space to buffer bike lanes. Bike lanes temporarily interrupted at transit stops

Recommended Road Diet Treatment 13 Left lane SB at South Street becomes left-turn-only Treatment does not continue past South Street due to conflicts with transit stop Sharrow treatment in the block between South & Sager Ample turning space for emergency vehicles South St Sager Ave

Intersection Level of Service (Future Two- Lane, TWLTL, & Bike Lanes) 14 AMPM LOS A, B, or C LOS D or E LOS F Breckinridge Ln Main St Sager Ave University Dr Armstrong St South St

LOS D or E LOS A, B, or C Intersection Level of Service Failure Analysis 15 AMPM LOS F Analyzed road diet traffic impacts against potential increased traffic levels. It would take a 22% growth in through traffic on University Drive to create a failing intersection in the corridor.  Traffic volumes on University Drive have actually decreased since  If one did assume a steady growth rate, it would take about 20 years to get to 22% at 1% annual growth (or 10 years assuming 2% annual growth). Breckinridge Ln Main St Sager Ave University Dr Armstrong St South St

Questions / Comments?