Global Design Effort RTML KOM Close-out Ross, Walker.

Slides:



Advertisements
Similar presentations
CFS TIME SCHEDULE EDR - CFS Europe – Kick-Off Meetings Kick-Off Meetings, CERN, 3, 4, 5 September ILC PROJECT ENGINEERING DESIGN REPORT CFS Europe.
Advertisements

10/23/07RTML EDR Oct GDE1 Cornell Plans for RTML EDR Work G. Dugan Cornell LEPP.
BDS GDE context LC-ABD2 : WP4 - Beam Line Design 12 th April 2007, LC-ABD Plenary, RHUL Deepa Angal-Kalinin ASTeC, The Cockcroft Institute.
2011 Damping Rings Lattice Evaluation Mark Palmer Cornell University March 8, 2011.
Global Design Effort BDS KOM Opening remarks/comments from EDR Project Management SLAC Marc Ross / Nick Walker.
Review on PSB 160 MeV H- Injection Nov 9-10, 2011 Closeout by P. Cruikshank, M. Giovannozzi, D. Johnson, B. Jones, B. Pine, M. Plum, D. Tommasini.
ILC RTML Lattice Design A.Vivoli, N. Solyak, V. Kapin Fermilab.
8/28/07RTML EDR KOM1 Cornell Plans for RTML EDR Work G. Dugan Cornell LEPP.
Fred Asiri1 Conventional Facilities and Siting Global Group (CFS) SLAC Update Conventional Facilities and Siting Global Group (CFS) SLAC Update November.
DR Kick-Off Meeting CI, 5 Nov 2007 Global Design Effort 1 Damping Rings Update (after the RDR) Andy Wolski.
Nick Walker, Brian Foster LAL, Orsay WP2: Coordination with the GDE.
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
DESY GDE Meeting Global Design Effort 1 / 12 Status of RTML Design and Tuning Studies PT SLAC.
Nick Walker Marc Ross Akira Yamamoto 2010 (and beyond) Plans & Milestones.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
ATF-II Review by GDE Marc Ross, (SLAC) For GDE Project Managers: Nick Walker and Akira Yamamoto 24 January, th ATF2 Collaboration Meeting.
Project Management Mark Palmer Cornell Laboratory for Accelerator-Based Sciences and Education.
Date Event Global Design Effort 1 ILC Engineering Design Phase - Status & Plans Mike Harrison GDE/BNL.
1 Global Design Effort TILC08 - WG1 Summary WG-1: Cost Reduction Studies J. Carwardine, T. Shidara, N. Walker (For WG-1 participants)
Global Design Effort 1 Possible Minimum Machine Studies of Central Region for 2009 Reference, ILC Minimum Machine Study Proposal V1, January 2009 ILC-EDMS.
ILC Beam Delivery System / MDI Issues for LCC-phase (~
Global Design Effort - CFS ILC Accelerator Design and Integration Meeting 1 ILC AD&I MEETING CONVENTIONAL FACILITIES AND SITING GROUP UPDATE V.
N.Solyak, RTMLALCPG 2009,Albuquerque, Oct.2 1 ILC RTML Upgrade in SB2009 Nikolay Solyak Fermilab.
Report of 2 nd ILC Workshop (Snowmass) Working Group Kiyoshi KUBO references: Slides of the plenary talks in the workshop by P.Tenembaum and.
The fourth Baseline Technical Review (BTR) - Conventional Facilities and Siting March 2012 All changes made to the CFS 2007 Reference Design during.
Global Design Effort Accelerator System Kick-off Meeting e- source SLAC Marc Ross.
Nick Walker – SA meeting KEK Treaty Points and Costing Guidance Nick Walker 1 st System Area Managers Meeting KEK –
Global design effort DOE meeting 8/10/06 Global design effort Americas 1 FY07 DOE ILC Budget recommendations G. Dugan ILC-GDE/Cornell University GDE Americas.
Introduction: Tasks of “Information for simulations”, hardware specs K.Kubo
BDS: 1 October 13, 2007 BDS KOM EDR planning discussion Andrei Seryi October 13, 2007.
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
20 July 2006 Vancouver GDE Meeting Global Design Effort 1 Ring to Main Linac Peter Tenenbaum SLAC.
1 V. Kashikhin for ILC ALCPG 2007, FNAL Meeting October 23, 2007 Ring to Main Linac Magnets.
Beam Dynamics WG K. Kubo, N. Solyak, D. Schulte. Presentations –N. Solyak Coupler kick simulations update –N. Solyak CLIC BPM –A. Latina: Update on the.
13 September 2006 Global Design Effort 1 ML (x.7) Goals and Scope of Work to end FY09 Nikolay Solyak Fermilab Peter Tenenbaum SLAC.
1 The ILC Control Work Packages. ILC Control System Work Packages GDE Oct Who We Are Collaboration loosely formed at Snowmass which included SLAC,
PHG - AD&I DESY - May 29, 2009 ILC - Global Design Effort 1 Cost Estimating for the AD&I Studies X Differential Estimates What we need from you! Peter.
BDS Lattice Design : EDR plans GWP03 Meeting 04/12/2007.
LET meeting, SLAC, Dec 11-14, 2007 Global Design Effort 1 Beam dynamics issues in RTML Nikolay Solyak Fermilab.
Ring to Main Linac (RTML): Status and Plans ILC January Meeting (KEK) Peter Tenenbaum 19-Jan-2006.
Status of RTML design in TDR configuration A.Vivoli, N. Solyak, V. Kapin Fermilab.
Tor Raubenheimer KEK Mtg Goals KEK January 19 th, 2006.
Simulations - Beam dynamics in low emittance transport (LET: From the exit of Damping Ring) K. Kubo
Accelerator Systems TAG Leaders’ Meeting PM Report –Planning for ALCPG –TDR preparations: Area System Baseline Technical Reviews –Recent e+ workshop experience.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
Global Design Effort1 September 20-22, 2006 MAC Review Response to 1 st MAC Mtg Barry Barish GDE.
PM Report AS ILC PAC (19-20 May) Agenda: –Akira, Rongli, Hitoshi H, Marc, Nick, Toshiaki, Mark P., Peter G. –Nick will report on Design –Marc.
J.C. Sheppard, SLAC Americas Region February 7, ILC Source Systems Work Packages and EDR Discussions ILC GDE Meeting IHEP, Beijing, China J. C.
Global Design Effort ILC Damping Rings: R&D Plan and Organisation in the Technical Design Phase Andy Wolski University of Liverpool and the Cockcroft Institute,
Fred Asiri1 Conventional Facilities and Siting Global Group (CFS) SLAC Update Conventional Facilities and Siting Global Group (CFS) SLAC Update December.
February 4, 2007 Global Design Effort 1. February 4, 07 Global Design Effort IR&MDI: 2 Tuesday’s discussion EDR organization Work Package distribution.
CFS / Global – 09 June, 2010 PM Report: SB2009: –4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ –  as advised by AAP, PAC and etc –Written.
Main Linac Technology (MLT) Meeting To be held through WebEx July 13, 2007.
Global Design Effort Accelerator System Kick-off Meeting e- Summary Day 1 25 Sept 2007 SLAC Marc Ross.
N.Solyak, RTMLLCWS’08, Chicago Nov.16-20, RTML progress 2008 Nikolay Solyak.
15-August-2005Peter Tenenbaum for WG1 Convenors 1 Low Emittance Transport and Beam Dynamics (WG1) Snowmass Meeting “I hear the roar of the big machine,
Global Design Effort Close-Out Points EDR time-scale (2010) –No demonstrations to ILC-like RF unit –3(?) CMs constructed at FNAL – not RDR baseline –2(?)
Positron Source Report Jim Clarke STFC Daresbury Laboratory/Cockcroft Institute.
Minimum Machine Update Nick Walker Ewan Paterson AS TAG leaders meeting
Frank Stulle, ILC LET Beam Dynamics Meeting CLIC Main Beam RTML - Overview - Comparison to ILC RTML - Status / Outlook.
PM Report CFS /Gbl ILC PAC (19-20 May) Agenda: –Akira, Rongli, Hitoshi H, Marc, Nick, Toshiaki, Mark P., Peter G. –Nick will report on Design.
July 11, 2008M Ross for PM - ILC GDE - ILCDR08 closeout 1 GDE Program for the ILC Technical Design Phase Marc Ross for: Akira Yamamoto, Nick Walker GDE.
Baseline Technical Review – Central Region Accelerator Systems
Oct 22 Group Leaders Planning meeting
The ILC Control Work Packages
ILC PROJECT ENGINEERING DESIGN REPORT CFS Europe – KICK OFF MEETING
Accelerator Physics Technical System Group Review
CLIC damping rings working plan towards the CDR
ILC - Global Design Effort
Reliability, MPS, Operations and Tuning Work Packages
Presentation transcript:

Global Design Effort RTML KOM Close-out Ross, Walker

Global Design Effort Identified High-Priority RTML Issues Common housing / integration aspects –Evaluation and documentation of key critical issues –Identify what may change (site-specific issues) –Plan to accommodate these in EDR Beam dynamics – specifically emittance preservation (tuning) –Collimation efficiency / halo generation another noted issue. –Complete lattice needed for beam dynamicists –(Note many beam dynamics issues identified in RTML) Vacuum, magnet systems engineering re-evaluation needed for better value estimate –Consolidation of requirements –Best performed after initial lattice iteration (need for ‘frozen’ baseline lattice) Timing (LLRF) issues –Tight specifications for bunch compressor –‘global’ tolerance budget and beam dynamics issues need to be understood: meeting of relevant experts needed

Global Design Effort RTML Specific Issues ACD: Ultra-short bunch compressor –Specify criteria for adoption as BC –Define outstanding work and time scale –Identify impact on CFS etc. Bunch compressor tunability –What is the cost impact? Integration: –CFS will own integration related WPs –Work closely together with Integration Group Quote: Ewan and PT will do all the work! –CFS cost-optimised geometry should be design driver (where possible) Optics should follow unless it becomes impossible or too expensive Iteration will be necessary. –(Don’t forget e+ source interference) Identify strategy/method of allocating ‘volumes’ in tunnel space for individual systems. –Consider using 3D CAD from start (-> management decision)

Global Design Effort RTML Specific Issues (cont.) Dump designs –Size and required infrastructure for 220 kW dump CFS impact DRX dump currently missing in RDR –Cost implications – are all dumps really required MPS functionality? Commissioning issues. Value engineering! Extended service tunnel for turn around – needed primarily for safety egress? Re-evaluate. Power supply configuration (one magnet one quad) should be re-evaluated -> Value engineering –Need for accommodating energy scaling?

Global Design Effort RTML Specific Issues (cont.) Magnet prototyping –Spin-rotation solenoids –SC quadrupoles (cryomodule) Possible European contribution from CIEMAT known to PM office –Q20L200 (large quantity – value engineering) –Wide dipole – if needed Vacuum system (long return line) requirement (20nTorr) extremely tight –re-evaluate (beam dynamics)

Global Design Effort RTML Specific Issues (cont.) Beam experiments –LLRF related: phase stability, beam-loading compensation Investigate possibilities at FLASH Developing RTML WBS –Terse and clear definitions of WPs –Goals and milestones –Time-line with dependencies (schedule) WP Allocation –PM office / EC action item –Cornell RTML ‘bid’ will be considered in global context (PMs together with Solyak)

Global Design Effort RDR->EDR: General Comments Initial work will be to consistently document the baseline –Reflected in WBS (Work Packages) Efforts to standardise requirements documentation will soon be underway These (and other baseline-defining) documents will be placed into EDMS under Change Control Traceability of accelerator design requirements to technical (engineered) solutions will be mandated. –Engineering Management / EDMS Office

Global Design Effort Towards October GDE Meeting Consolidate and document WP descriptions –PM office will provide template examples –Include estimate of needed resources –Special case: Beam Dynamics WPs should be reported to Simulation Group. Include suggested coordinators / resource / institutes –Cornell would appear here –Include critical WPs even if you have no identified interested resources PM office will review WP –Input from integration office and other areas Final WP WBS should be presented at October meeting –Time in parallel sessions for fine-tuning and final discussions.