QXF Coil working group 2/11/16 Dan Cheng J. DiMarco, C. Hernikl, D. Humphries, S. Myers, X. Wang MQXFA Coil Fiducialization Proposal.

Slides:



Advertisements
Similar presentations
Spiral Stairs Assembly Instruction By Laser Dollhouse Designs
Advertisements

COIL & ASSEMBLY READINESS REVIEW, SEPT 2013 D. Smekens.
G.Barber Tracker Planning & Mechanical Preparation June Tracker Planning & Mechanical Preparation An outline of (known) outstanding work to be carried.
Dan Cheng H. Felice, R. Hafalia QXF Structures Video Meeting July 10, 2014 Coil Handling for Magnet Assembly Status Update.
Alignment of DB and MB quadrupoles Hélène MAINAUD DURAND 17/11/2011 With a lot of input from Sylvain GRIFFET.
Multipole Girders - Alignment & Stability (Multipole Girder Alignment technology & R&D) S. Sharma ASD: J. Skaritka, D. Hseuh, V. Ravindranath, G. Miglionico,
Yurii Levashov Undula t or fiducialization test Oct. 14, 2004 Undulator Fiducialization Test Results Fiducialization Tolerances.
Robert Ruland Installation Alignment -Magnetic Measurements – Fiducialization April 7-8, 2005 FAC Meeting 1 Installation Alignment,
Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Undulator Physics.
MICE Alignment and Support Structure Tony Jones and Yury Ivanyushenkov Engineering Department RAL.
Metrology for NCSX Steve Raftopoulos and the NCSX Metrology Team.
Mechanical design, analysis and integration of pre-alignment systems for CLIC M.Anastasopoulos / BE-ABP-SU.
DELTA Quadrant Tuning Y. Levashov, E. Reese. 2 Tolerances for prototype quadrant tuning Magnet center deviations from a nominal center line < ± 50  m.
LARP QXF 150mm Structure Mike Anerella / John Cozzolino / Jesse Schmalzle November 15, nd Joint HiLumi LHC-LARP Annual Meeting.
NCSX Metrology 1/7/04. Short term purchase recommendation Buy the Spatial Analyzer Software package –This software will be the user interface for operating.
The barrel reference system1 THE BARREL REFERENCE SYSTEM C.Guyot (Saclay) Goal: Provide a geometrical survey of the whole barrel muon spectrometer.
H. Felice - P. Ferracin – D. Cheng 09/19/2013 Update on structure CAD model.
H. Felice - P. Ferracin – D. Cheng 09/11/2013 Update on structure CAD model.
1 LHC IR Quadrupole Alignment Experience at Fermilab T. Beale, J. DiMarco, J. Nogiec, P. Schlabach, C. Sylvester, J. Tompkins, G. Velev 28 September 2005.
1 Dimensional Control for the National Compact Stellarator Experiment R. Ellis, A. Brooks, T. Brown, W. Reiersen, S. Raftopoulos, B. Stratton Presented.
LARP Prototype Assembly Steps Towards Q1 and Q3 Production Dan Cheng MQXF Design Review December 10-12, 2014 CERN H. Felice, R. Hafalia, D. Horler, T.
LARP Prototype Assembly Steps Towards Q1 and Q3 Production Dan Cheng MQXF Design Review December 10-12, 2014 CERN.
11 T Dipole Status at FNAL Fred Nobrega January 21, 2014.
Helene Felice, Dan Cheng Support structure modifications Update on discussion at CERN.
M. Gilchriese Module Assembly and Attachment at LBNL M. Gilchriese for F. Goozen April 2000.
SR NSLS prototype magnets. Dipoles 90 mm aperture dipole Pole Ends will be matched to achieve the magnetic field quality ( )
MQXFS Assembly Procedure J.C Perez N. Bourcey, B. Favrat, P. Ferracin, Ph. Grosclaude, M. Juchno, L. Lambert, P. Moyret, J. Parrilla Leal, N. Peray, T.
Hybrid Structure with Cooling John Cozzolino LARP Collaboration Meeting Port Jefferson, NY November 4-6, 2009.
Survey, Alignment and Metrology Fiducials Requirements Fabien Rey ESS Survey, Alignment and Metrology Group ACCELERATOR TECHNICAL BOARD 23/09/2015.
Survey, Alignment and Metrology Fabien Rey Pawel Garsztka ESS Survey, Alignment and Metrology Group.
Survey, Alignment and Metrology Fabien Rey Pawel Garsztka ESS Survey, Alignment and Metrology Group Interface Workshops for ESS Warm-Linac: ISrc - LEBT.
CLIC Beam Physics Working Group CLIC pre-alignment simulations Thomas Touzé BE/ABP-SU Update on the simulations of the CLIC pre-alignment.
Helene Felice HQ Test Results Review Thursday December 16 th Overview of HQ coils and Magnet.
LMQXFA Cold Mass Assembly Antonios Vouris Fermilab February 3, 2016.
Magnetic Field Stability Measurements Joe DiMarco 23Oct07.
Fiducialisation and initial alignment of components for CLIC Mateusz Sosin on behalf of the CLIC active pre-alignment team CLIC Workshop 2015.
MQXF Workshop on Structure, Alignment, and Electrical QA Feb 2-4, 2016 Dan Cheng J. De Ponte, H. Felice, S. Kincaid, T. Lipton, S. Myers, A. Pekadis, M.
Dan Cheng, Helene Felice 4/8/2015 MQXFS-D Build-up LBNL “Lessons Learned”
1 MQXF Workshop on Structure, Alignment, and Electrical QA Feb 2-4, 2016 Options for modifications to parts and procedures Options for modifications to.
MQXF Workshop on Structure, Alignment, and Electrical QA Feb 2-4, 2016 Dan Cheng J. DiMarco, C. Hernikl, D. Humphries, S. Myers, X. Wang MQXFA Magnet Fiducialization.
1 FPA Stage 2 Peer Review May 12, 2006 T. Brown. 2 FPA Stage 2 Status Summary of Stage 2 activities Review current design status Review schedule details.
Dan Cheng S. Kincaide, H. Felice, X. Wang 4/23/2015 MQXFS Mechanical Interfaces (Proposed)
Overview short model design and structures P. Ferracin on behalf of the MQXF collaboration MQXF Workshop on Structure, Alignment, and Electrical QA CERN.
QXF Coil Fabrication: Baseline Decisions QXF Coil Working Group Video Meeting (Revised from discussion during presentation) Dan Cheng April 16, 2013.
1 InnoSys Quick Connect End Effecter Service and Maintenance Procedures Shreveport Assembly 14 MAY, 2008.
MQXFB Plan for mechanical alignment measurements J.C Perez On behalf of MQXF collaboration team Special thanks to Jose Ferradas for his contribution MQXF.
VELO Integr - Jan06Jean-Christophe GAYDE TS/SU EDMS n° SURVEY FOR VELO INSTALLATION 1.SURVEY AT GROUND FLOOR - FIDUCIALISATION 2.SURVEY FOR INSTALLATION.
MQXFB design, assembly plans & tooling at CERN J.C Perez On behalf of MQXF collaboration team MQXF Workshop on Structure, Alignment and Electrical QA.
Dan Cheng, Xiaorong Wang 12/15/2015 MQXFA Connectors Discussion Part II.
CERN –GSI/CEA MM preparation meeting, Magnetic Measurements WP.
HL-LHC Meeting, November 2013D2 Status and Plans – G. Sabbi 1 D2 Conceptual Design Status and Next Steps G. Sabbi, X. Wang High Luminosity LHC Annual Meeting.
MM Status Mostly unchanged (Feb. 3 rd 2016). Parts Mildly modified bridges, allowing to actually move 130nm pickup tools along r*phi –Turned out to be.
MICE Coupling Coil Fabrication Steps to Complete Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
MQXFSD3 laminated structure J.C Perez N. Bourcey, B. Favrat, P. Ferracin, P. Moyret.
Dan Cheng 8/27/2015 MQXFS1 Observations and Feedback from the Assembly Processes, Part II.
LHQ Coil Design and Features Miao Yu Fermilab May 09, 2012.
QXF magnet integration Paolo Ferracin Joint LARP/CM20 HiLumi meeting Napa Valley, CA, USA 8-10 April, 2013.
Dan Cheng QXF Structures Working Group November 7, 2014 Implications for the split-shell MQXFS concept.
Logo area Long magnet manufacturing plan and QC by US HL-LHC-AUP Dan Cheng For the MQXFA team MQXF International Review – CERN, June 7 th – 10 th, 2016.
Build A Motor You must follow the directions step-by-step!
Tutorial On Fiducialization Of Accelerator Magnets And Undulators
QXF Coil Fabrication & Tooling Reaction / Impregnation
Procurement, Measurement and Installation of 2 Octupoles for ATF
Mechanical tolerance analysis for the MQXF prototype structures
ERMC/RMM activities May 2017
FRESCA2 Update on the dipole design and new calculations
LCLS Undulator Fiducialization
Cryomodule Assembly Plan
Magnetic measurements at ambient temperature on the MQXFBP1
For more information contact: Mike Newsky,
Presentation transcript:

QXF Coil working group 2/11/16 Dan Cheng J. DiMarco, C. Hernikl, D. Humphries, S. Myers, X. Wang MQXFA Coil Fiducialization Proposal

Outline Feb MQXFA Coil Fiducialization2 Fiducialization Plan – Coil fiducialization – Magnet fiducial features Assembly tooling and infrastructure Magnetic measurements What can be achievable?

Fiducializing Coils Feb MQXFA Coil Fiducialization3 Currently CMM measurements have only been characterizing coil size/shape We have not implemented any features to measure the coils and locate their mechanical centers yet

Proposed Coil Ends Feb MQXFA Coil Fiducialization4

Proposed Coil Ends Feb MQXFA Coil Fiducialization5 Either a coil fiducial plate, impregnated (Both ends), Or, 2-3 pin holes to be drilled into the end shoes and reamed after reaction This method will be a direct measurement to the coils, removing the uncertainty of measuring the collar ends

Fiducializing the Coil Mechanical Center Feb MQXFA Coil Fiducialization6 When coils are measured, CMM data will also measure the fiducials on both ends to locate them with respect to the theoretical center Perhaps pin holes in poles can also be used in the ID if necessary; requiring spot faces

MQXFA Dummy Coil Feb MQXFA Coil Fiducialization7 The MQXFA dummy coils will incorporate a three-hole pattern to test this

Summary Feb MQXFA Coil Fiducialization8 Coil fiducialization concepts and features proposed at coil and coil parts fabrication – Dummy coil will incorporate features Magnet fiducialization concepts are still being developed and will be tested with the first dummy assembly

Extra Slides Feb MQXFA Coil Fiducialization9

Yoke fiducialization at Shell-Yoke Assembly Feb MQXFA Coil Fiducialization10 We are exploring the possibility of both measuring and aligning the shell-yokes during the pre-assembly step – Are we able to perform an alignment at this stage, if necessary? – Not yet sure if this is practical; we will try this, though

Magnet Fiducialization Features Feb MQXFA Coil Fiducialization11 Survey tooling block will be used when measuring the Yoke blocks to locate their centers Tooling block will be mounted to at least three quadrants (bottom quadrant is questionable) to fiducialize the structure

Yoke Survey Tooling Block Feb MQXFA Coil Fiducialization12 “1-2-3” Style block – Magnetic hold down

Fiducializing the Magnet Structure Feb MQXFA Coil Fiducialization13 Yoke/magnet fiducial features must be accessible after magnet has been assembled, as depicted here Coil targets defined to their mechanical center Yoke survey block will be defined to coil targets Yoke features remain accessible after axial endplates are installed survey block

Warm Magnetic Measurements Feb MQXFA Coil Fiducialization14 May use the existing warm measurement probe with a different arrangement of two pickup coils – we can measure the field angle from the first coil relative to that from the second coil as we scan along the magnet (We will check the possible resolution of this method) Tilt angle sensors – The typical accelerometer with 12-bitADC has a resolution of 1 mrad (0.057 degrees). With inclinometers the resolution can reach 0.1 mrad Survey targets can be attached to the measurement probe to track position and location of probe during measurements Stretched wire measurements may also be performed This information will be combined with the mechanical fiducialization data

Proposed Fiducial Plan Feb MQXFA Coil Fiducialization15 Yoke Fiducials, 3x-4x per axial location (bottom may not be readily accessible) Coil Fiducials, Impregnated (4x), Both ends Measured (mech/mag) Centers

Magnet Assembly Tooling Layout Feb MQXFA Coil Fiducialization16 Magnet integration table will be surveyed and fixed into place Network of semi-permenent survey monuments for aligning the tables and defining coordinate system when surveying magnet structure

Fixed, and aligned Magnet Integration Table Feb MQXFA Coil Fiducialization17 Magnet shell/yoke assemblies will be located onto pillars that have been surveyed in

What is Achievable? Feb MQXFA Coil Fiducialization18 This is more of a fiducialization process Magnet alignment: No real “knobs to turn” – Assembly tooling will be aligned, though – Will likely use a laser tracker (FARO Vantage system) – Our survey crew will need to perform some tests o-laser-tracker/overview

Near-term B77a Feb MQXFA Coil Fiducialization19

MQXFSD1 Alignment Observations Feb MQXFA Coil Fiducialization20 MQXFSD assembly appears to be mechanically well centered – All alignment keys were loose after the bladder operations (keys are not being loaded in shear) Question: What are the specifications/requirements for the assembly (center, twist, etc.)?