ERA Project Team Meeting Project Management Plan April 23, 2002.

Slides:



Advertisements
Similar presentations
Software Quality Assurance Plan
Advertisements

Track 6 – Enterprise Resource Planning Higher Education ERP: Lessons Learned Ken Orgill West Virginia University Dave Swartz George Washington University.
Adult Protective Services System (APSS) Project Progress Report Prepared by: APSS Project Team Date: September 16, 2008.
Project Management Framework May 2010 Ciaran Whyte Risk Administrator Planning & Strategic Projects Unit.
ITIL: Service Transition
2003 Indigo Technology, Inc. All Rights Reserved Integrated Process Teams Process Management Quality Assurance Configuration and Data Management Program.
Stepan Potiyenko ISS Sr.SW Developer.
Secure System Administration & Certification DITSCAP Manual (Chapter 6) Phase 4 Post Accreditation Stephen I. Khan Ted Chapman University of Tulsa Department.
Chapter 5: Project Scope Management
The Software Product Life Cycle. Views of the Software Product Life Cycle  Management  Software engineering  Engineering design  Architectural design.
Project Management and MS Project. The project management triangle: Time Resources Scope.
System Implementations American corporations spend about $300 Billion a year on software implementation/upgrade projects.
Spring 2008, King Saud University Engineering Administration Dr. Khalid Al-Gahtani 1 What is a Project? “A Project is a one-shot, time-limited, goal- directed,
Software Configuration Management
Project Management and Scheduling
Chapter 17 Acquiring and Implementing Accounting Information Systems
Acquiring Information Systems and Applications
Chapter 7 Database Auditing Models
CORPORATE PROFILE
The What Why and How.  MCTS  These certifications provide the foundation for Microsoft Certification  MCITP  These certifications build on the technical.
Advanced Project Management Project Plan Templates
Configuration Management Process and Environment MACS Review 1 February 5th, 2010 Roland Moser PR a-RMO, February 5 th, 2010 R. Moser 1 R. Gutleber.
Work Breakdown Structure
Staff Structure Support HCCA Special Interest Group New Regulations: A Strategy for Implementation Sharon Schmid Vice President, Compliance and.
INFORMATION SYSTEM APPLICATIONS System Development Life Cycle.
Project Management Life Cycle Katy Koenen 05/07/2013.
Rational Unified Process Fundamentals Module 4: Disciplines II.
Independent User Acceptance Test Process (IUAT)
Software Quality Assurance Lecture #2 By: Faraz Ahmed.
How To Build a Testing Project 1 Onyx Gabriel Rodriguez.
Lecture 31 Introduction to System Development Life Cycle - Part 2.
Sampleminded® Support Overview Last Updated: 1/22/
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
Database Security and Auditing: Protecting Data Integrity and Accessibility Chapter 7 Database Auditing Models.
Project Tracking and Monitoring QMS Training. 2 Objective To track and monitor the progress of the project and take appropriate corrective actions to.
Slide 1 Project Management Chapter 4. Slide 2 Objectives ■ Become familiar with estimation. ■ Be able to create a project workplan. ■ Become familiar.
KS3 Phase4 Client Server Monitoring System October 1, 2008 by Stephen, Seema, Kam, Shpetim.
1 Advanced Project Management Project Plan Templates Ghazala Amin.
Ch-1 Introduction The processes used for executing a software project have major effect on quality of s/w produced and productivity achieved in project…
Software Project Management (SEWPZG622) BITS-WIPRO Collaborative Programme: MS in Software Engineering SECOND SEMESTER /1/ "The content of this.
Sage ERP X3 Standard Edition Methodology
Systems Analysis & Design AUTHOR: PROFESSOR SUSAN FUSCHETTO 10/24/
Evaluate Phase Pertemuan Matakuliah: A0774/Information Technology Capital Budgeting Tahun: 2009.
1 CP586 © Peter Lo 2003 Multimedia Communication Multimedia Development Team.
Pertemuan 14 Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
Software Project Management Lecture 3. What is Project Management?  Project management is “the application of knowledge, skills, tools and techniques.
Managing Multiple Projects Steve Westerman California Department of Motor Vehicles Steve Young Mathtech, Inc.
Certified Software Tester How To Build a Testing Project, Part 1.
SAFETYANALYST Integrates and automates the transportation safety planning and management Software analysis tools to assist highway agencies to implement.
The System Development Life Cycle
Systems Development Life Cycle
Presenter: Igna Visser Date: Wednesday, 18 March 2015
ITIL: Service Transition
Project Management Processes
Systems Implementation,
TechStambha PMP Certification Training
IEEE Std 1074: Standard for Software Lifecycle
System Development Life Cycle (SDLC)
The System Development Life Cycle
Engineering Processes
The 9 steps to successful project implementation
GENERAL SERVICES DEPARTMENT Facilities Management Division PROOF-NM Project (Process Re-engineering & Optimization of Operations & Maintenance Functions.
Project Management Processes
Systems Development Life Cycle
UNIT No- III- Leverging Information System ( Investing strategy )
Chapter 3 Managing the Information Systems Project
{Project Name} Organizational Chart, Roles and Responsibilities
System Analysis and Design:
Project Name Here Kick-off Date
Presentation transcript:

eRA Project Team Meeting Project Management Plan April 23, 2002

Project Management Plan  Purpose: – To describe the management processes in use by the eRA project  Scope: – Applies to the software development, maintenance, and operations activities conducted on the eRA project

Goals of eRA Project Management  Ensure that commitments made to the user community, the IC’s, and the Steering Committee are met with fidelity  Ensure that eRA allocates resources in accordance with business priorities as determined by the Steering Committee  Implement modern project management processes that best serve eRA’s advanced software engineering environment and position the project for compliance with industry standard

Project Management  New projects/new software development and major enhancements to existing software  Minor enhancements, bug fixes, software maintenance  Operations, which supports the development and maintenance of software

Project Planning  Development of the Business Plan – Describe the project – Estimate cost and schedule – Estimate the WBS  Evaluation of the Business Plan – eRA CIO, Architect, ISSO  Presentation of Business Plan to Project Team for approval

Monitor and Control Cost and Schedule  Tools – Project Central – Time Tracking System (Oracle SBS) Cost categories Life Cycle phase Workflow – Contractor invoicing

Project Central  Project file conversion completed  Users guide completed and posted  Next steps – Validate project plans – Provide training to business area groups – Configure ODBC settings – Assign tasks / create accounts – using resource pool

Time Tracking System (SBS)  Implemented to provide real-time estimates on project time and cost  Supports all contracting and government staff – ~242 staff members  Time tracked by cost category and workflow

Time Tracking System (SBS)