Kevin McLeod & Chris Horton OCE, Region 12 Houston 1.

Slides:



Advertisements
Similar presentations
DRAFT IRON & STEEL FOUNDRY MACT FACILITY INSPECTIONS 40 CFR PART 63, SUBPART EEEEE.
Advertisements

METAL CAN SURFACE COATING MACT COMPLIANCE ASSURANCE 40 CFR PART 63, SUBPART KKKK June 2006 June CFR PART 63, SUBPART KKKK June 2006 June 2006.
METAL FURNITURE SURFACE COATING MACT COMPLIANCE ASSURANCE
METAL COIL SURFACE MACT COMPLIANCE ASSURANCE 40 CFR PART 63, SUBPART SSSS May 2006 May 2006.
Compliance Dates The final rule was published on January 25, 1995,
Checking & Corrective Action
Updating Title V Post Permit Forms Joseph A. Janecka, P.E., Air Program Liaison Field Operations Support Division TCEQ.
Issue Identification, Tracking, Escalation, and Resolution.
1 Evaluation Reviews and Reevaluations Macomb ISD Special Education Management Services August, 2006.
APAI Environmental Workshop FESOP Recordkeeping/Plans James (Jim) Heim, C.T.C., E.P. Bruce Carter Associates, L.L.C February 9, 2012.
VETERANS BENEFITS ADMINISTRATION AVECO July 14 – 18, 2014 Centralized Certification.
1 Licensing in the Energy Sector Georgian National Energy And Water Supply Regulation Commission Nugzar Beridze June 27 – July 3, 2008.
feature=youtu.be.
Compliance and Enforcement: Investigation Overview.
2015 NCMA EPA Enforcement Policies and How They Affect Your Facility Michael Pjetraj, P.E. DAQ Stationary Source Compliance Branch Supervisor.
TITLE V COMPLIANCE CERTIFICATION AND DEVIATION REPORTING Annette Maxwell and Erica Solis Office of Compliance and Enforcement May 5, 2015.
NCMA Workshop March 19 and 24, 2015 Betty Gatano, P.E. Permitting Section North Carolina Division of Air Quality, Raleigh, NC (919)
Title V Site Operating Permits (SOPs)
Emissions Events Cynthia Gandee, Air Program Liaison
Air Permitting Overview.
New Template of Environmental Compliance Approval with Limited Operational Flexibility Environmental Approvals Branch Presented to Air Practitioners’ Group.
Overview of the Tribal New Source Review (NSR) Rule U.S. Environmental Protection Agency Office of Air Quality Planning and Standards (OAQPS) Research.
Susan Palachek TCEQ Pollution Prevention & Education.
Test Security. Texas Education Code (TEC) Sec SECURITY IN ADMINISTRATION OF ASSESSMENT INSTRUMENTS. (a) The commissioner: (1) shall establish.
Texas Environmental, Health, and Safety Audit Privilege Act
■ This Training Module is designed to educate Management on FMCSA Compliance Review (CR).
The Tax Credit Process (Once credit has been awarded) Reservation and Carryover Gross Rent Floor Election Form Commitment 10% Certification Quarterly Progress.
February 2007 Commercial Vehicle Drivers Hours of Service Module 24: Daily Log Audits.
Where to find Information About Facilities. Overview of Title V Permits.
Indiana New Source Review Reform Plantwide Applicability Limitations (PALs) IDEM/Office of Air Quality September 7, 2004.
Compliance Assurance and Title V Monitoring A Summary of the Rules and Applications Peter Westlin, EPA, OAQPS.
Procedures and Forms 2008 FRCC Compliance Workshop April 8-9, 2008.
How to prepare for an Authorized Agent Compliance Review Ronald Hebert Water Section Manager Region 10/ Beaumont (409)
Kathy Alexander, Ph.D. Technical Specialist Water Availability Division Texas Commission on Environmental Quality.
Presented by: Lloyd Gosselink Rochelle & Townsend, P.C. | 816 Congress Ave. Suite 1900 Austin, Texas Environmental Audits: An often overlooked tool.
Title V Operating Permit Program 1 Section 1: Intro to Title V Laura McKelvey U.S. EPA.
Title V: The Big Picture
Compliance Assurance and Title V Monitoring A Summary of Rules and Permitting Issues Peter Westlin, EPA, OAQPS.
Developing an In-House Air Quality Audit Program March 22, 2006 Judy B. Yorke Yorke Engineering, LLC x25
Title V Compliance Certification Troutman Sanders LLP Greg Blount, Margaret Campbell, Debbie Cline.
Title V Operating Permits: A Compliance and Enforcement Tool Candace Carraway US Environmental Protection Agency Office of Air Quality Planning and Standards.
Noncompliance and Correction (OSEP Memo 09-02) June 2012.
Best Available Control Technology/Lowest Achievable Emission Rate Evaluation Sarah Fuchs Air Permits Division Texas Commission on Environmental Quality.
Emissions Banking and Trading (EBT) Overview/Update Melissa Ruano Air Quality Division Texas Commission on Environmental Quality Advanced Air Permitting.
Special Education Federal Child Count Reporting NOVEMBER 2015.
Compliance and Enforcement: Investigation Overview.
Coordinating Permitting and Enforcement Nebraska’s Experiences David A Graiver Environmental Engineer NDEQ: Air Quality June 15, 2011.
IPECA’s Annual UST Seminar Management & Compliance Assistance Legal Overview –FR & Implications on Compliance October 7, Indianapolis David R. Gillay,
REVISIONS TO THE FEDERAL WATER QUALITY STANDARDS RULE JILL CSEKITZ, TECHNICAL SPECIALIST TEXAS COMMISSION ON ENVIRONMENTAL QUALITY.
January 2012 Mississippi Department of Education Office of Instructional Enhancement and Internal Operations/Office of Special Education 1 Noncompliance.
Nonattainment New Source Review (NA NSR) Program Raj Rao US Environmental Protection Agency Office of Air Quality Planning and Standards ,
1 The Exceptional Events Rule (EER) Overview Tom Link EPA – OAQPS Geographic Strategies Group Westar Meeting, San Francisco, February 25, 2009.
Title V Site Operating Permits (SOPs) Initial, Revision, and Renewal Applications Vasant Chaphekar, P.E. & Carolyn Maus, P.E. Air Permits Division Texas.
Emissions Events Cynthia Gandee, Air Program Liaison Office of Compliance and Enforcement Program Support Section Austin Jon Williams, Work Leader Office.
Susan Palachek TCEQ Pollution Prevention & Education.
Balancing the Three R’s: Regulations, Records, and Reports Dallas, TX ♦ May 18, 2016 Arron Heinerikson.
Texas Environmental, Health, and Safety Audit Privilege Act Michael De La Cruz Enforcement Division Office of Compliance and Enforcement Texas Commission.
BSB Biomanufacturing CHAPTER 4 GMP – Documentation Part I (SOP)
THURSDAY TARGETED TRAINING: Reporting Regulations and Requirements
Updated ERO Enterprise Guide for Internal Controls
Preparing for Permit Review
Basic Web-based Emissions Inventory Reporting (Web-EI)
Training Appendix for Adult Protective Services and Employment Supports June 2018.
SSA Adverse Decisions and Administrative Finality
Residential Placement Application 2011
Single Event Violations
PREREQUISITE PROGRAMS
Cupa violation Review BAESG Meeting May 20, 2019 Matthew Burge
Annual Enforcement Report Overview
New Users Guide to NetDMR
Presentation transcript:

Kevin McLeod & Chris Horton OCE, Region 12 Houston 1

Introduction Brief discussion of history and scope Review of compliance documents Investigation process 2

Clean Air Act 1977 Clean Air Act Established New Source Review (NSR) permitting Construction and major modification of facilities 1990 Clean Air Act Amendments Established Title V permitting Federal operating permits Title 40 Code of Federal Regulations (CFR) Part 70 Title 30 Texas Administrative Code (TAC) Chapter 122 3

Title V Operating Permit Includes all applicable air requirements Federal standards 40 CFR 60 (NSPS), 61 (NESHAP), 63 (MACT), etc. State standards 30 TAC 111 (visible emissions) 30 TAC 115 (volatile organic compounds) 30 TAC 117 (nitrogen oxides), etc. NSR authorizations Case-by-case permit, standard permit, permit by rule 4

Title V Operating Permits Two Common Types: Site Operating Permit (case-by-case) General Operating Permit (cover similar sites) Both Permit Types Include: Monitoring requirements Recordkeeping and reporting requirements Compliance plans for emission units not in compliance with applicable requirements 5

Additional Recordkeeping All permits have a general recordkeeping requirement: 30 TAC 106.8(c)(2) [Permits by Rule] 30 TAC (b)(E) [NSR Permits] 30 TAC [Title V Permits] Don’t rely on permit conditions to specify each record. Check each of these rule sections for applicability to your site. 6

Title V Reporting Requirements Deviation Report (DevRep) Detailed requirements in 30 TAC (2) Due twice per year (6 months)* Permit Compliance Certification (PCC) Detailed requirements in 30 TAC Due annually (12 months)* Forms, Instructions, and Guidance: * unless otherwise specified at a higher frequency in a permit condition or other ordering provision specified by the commission 7

Reporting Period Calculation Start Date: The permit issuance date, or The day after the end date of the previous reporting period End Date: Deviation Reports: Start date + 6 months - one day PCCs: Start date + 12 months - one day The deviation reporting period will not be exactly 180 days. Example: Jan 1 to June 30 = 181 days (182 days on leap years) July 1 to December 31 = 184 days 8

Reporting Period Issues Actions that DO NOT CHANGE compliance period dates: Permit revisions Permit renewals Change in ownership Actions that CHANGE compliance period dates: Permit revocation* Permit termination* Permit reissuance (restarts the compliance period) 30-day submission period begins on first day after reporting period ends. * end date compliance period unless otherwise formally laid out in an Agreed Order or other order of the commission or EPA 9

Reporting Items to Remember You can change your reporting period, but remember: Never exceed 6 months for deviation reports and 12 months for permit compliance certification Account for every day (no gaps) A deviation report is not required if there were no deviations to report during the reporting period A PCC is required at least annually regardless of whether or not deviations occurred 10

Deviations What is a deviation? 30 TAC (6) defines a deviation as any indication of noncompliance with a term or condition of the permit as found using compliance method data from monitoring, recordkeeping, reporting, or testing required by the permit and any other credible evidence or information. 11

Is a Deviation always a Violation? Most deviations will become alleged violations upon further review ViolationNot a Violation Operating parameters outside the permitted range (Ex: flare pilot outage, thermal oxidizer temp, scrubber pH) Non-reportable emissions events that include all records under 30 TAC Missing recordsDeviations properly disclosed under the Environmental, Health, and Safety Audit Privilege Act Missing reportsPreviously cited violations 12

Things to Consider The permit holder has an obligation to report deviations Not reporting a deviation is itself a deviation that must be reported separately 13

Filling out the Deviation Report Part 1: Include all instances of deviations Separately list all deviations even if they are caused by a single event Include cause of deviation Include corrective action taken 14

15

Deviation Report Form – Part 2 Part 2: This part is optional Use of Part 2 streamlines the investigation process Include only non-reportable emissions events (those not required to be reported within 24 hours of discovery per 30 TAC ) Includes all information required under Part 1 except STEERS incident number 16

17

Credible Evidence Can be used to demonstrate either compliance or noncompliance Credible evidence examples: Indication of noncompliance from monitoring methods of one rule that can be appropriately applied to another rule Credible citizen collected evidence Findings from TCEQ investigations Emissions events Must meet Texas Rules of Evidence 18

Deviation Report Form – Part 3 Part 3: This part is optional Used to report monitoring or credible evidence If the permit requirements indicate non- compliance, but other evidence/monitoring shows compliance 19

20

Permit Compliance Certification (PCC) Form Purpose: to certify compliance with an issued operating permit Submit a copy to: The appropriate TCEQ Regional Office EPA, Region 6 21

PCC – Part 1 Part 1: Certification of Continuous Compliance “Yes” indicates that all deviations have been reported/identified/ Summary of Deviations Indicate whether there were deviations reported in the previous deviation period or currently reported with PCC. Attach DevRep Form. 22

23

PCC – Part 2 Identifies deviation reports made during the certification period Include the six-month deviation reports Include any additional reports, for example: Deviation reports due to change of ownership Re-submittal of corrected deviation reports Other reports/documents used to declare deviations PCC – Part 2 24

25

PCC – Part 3 Specifies a monitoring method when the permit contains monitoring options and it cannot be determined which option is used from that permit document Required whether or not there was a deviation 26

27

Report Certifications OP-CRO1 Form Must be submitted with every PCC & DR Certifies truthfulness, accuracy, & completeness per 30 TAC (b) Must be signed by: Responsible Official (RO) OR Duly Authorized Representative (DAR) 28

29

Submission of Reports 30 day submission period Begins on the 1 st calendar day after the end of the reporting period end date TCEQ follows the Texas Rules of Civil Procedure: PCCs and DevReps must be postmarked within 30 days of the reporting period end date, except: When the TCEQ Chief Clerk’s office is closed* Weekends & holidays (when Chief Clerk’s office is closed) In this event, postmark is due the next open business day *30 TAC 1.7 relating to computation of time 30

TCEQ Report Review Title V Permit Compliance Reports are evaluated by TCEQ Regional Office with jurisdiction and includes: Permit Compliance Certification Deviation Reports Certification by Responsible Official Other Reports Required by the Title V Permit Review of Deviations Timeliness of Reports 31

TCEQ Report Review Permit Compliance Certification (Permit Compliance Certification - PCC Part 1) Timeliness of Report - 30 TAC (1) and (2) Certification of Continuous Compliance - 30 TAC (5)(B) Identification of Deviation Reports – 30 TAC (5)(C) 32

33

34

35

Permit Compliance Certification Timeliness of Reporting COMPLIANT: Within 30 days from the end of reporting period. NOTICE OF VIOLATION: 31 – 59 days from the end of the reporting period. NOTICE OF ENFORCEMENT: 60+ days from the end of the reporting period. TCEQ Report Review 36

TCEQ Report Review Deviation Reports (Form Dev Rep - Parts 1 & 2) Permit Holder/Area Permit & Regulatory Requirement Details Deviation Description/Corrective Action Deviation Dates/Times Missing Information Compliance evaluation 37

38

TCEQ Report Review Deviations to be reported include: Reportable Emissions Events Non-Reportable Emissions Events Non-Compliance with Permit Provisions 30 TAC/40 CFR Violations discovered through an audit program Violations noted during recent agency investigations No authorization Unplanned/Unauthorized Maintenance activities Failure to submit a deviation 39

40

TCEQ Report Review Common Deviation Reporting Errors Missing or inaccurate regulatory citations or permit conditions. Incomplete deviation descriptions Inaccurate starting/ending dates and times. Missing or inaccurate corrective actions 41

Reporting Issues to Avoid Failing to send the Certification by Responsible Official (OP- CRO1) with each report. Unauthorized signature of OP-CRO1 form PCC periods longer than 12 months. Gaps between reporting periods. 42

43

Additional Information Title V Deviation Reporting and Permit Compliance Certification: guidance/Title_V_Guidance_2012_November.pdf Title V Operating Permits Compliance Forms: tv_comp_forms.html 44

Questions? Chris Horton Sr. Investigator Region 12 - Houston Kevin McLeod Program Coordinator Region 12 - Houston