Time to resolve Design Issues 1. Disclamer Due to the engineering meeting last week I have not had time to coordinate this material with Tim or the L3.

Slides:



Advertisements
Similar presentations
Metrics and Databases for Agile Software Development Projects David I. Heimann IEEE Boston Reliability Society April 14, 2010.
Advertisements

Computer Science Department
SENG521 (Fall SENG 521 Software Reliability & Testing Operational Profiles (Part 5b) Department of Electrical & Computer Engineering,
Software Process Models
L. Greiner 1HFT PXL LBNL F2F – March 14, 2012 STAR HFT The STAR-PXL sensor and electronics Progress report for F2F.
Fermilab E906 Schedule Paul E. Reimer 20 June 2008.
Chapter 14 Network Design and Implementation. 2 Network Analysis and Design Aspects of network analysis and design Understanding the requirements for.
CS3773 Software Engineering Lecture 8 Software Planning and Estimation.
Feasibility and Cost/Benefit Analysis. Cost considerations u Cost classifications –Tangible / Intangible –Direct / Indirect –Fixed / Variable –Developmental.
Software project management Module 1 -Introduction to process management Teaching unit 1 – Introduction Ernesto Damiani Free University of Bozen-Bolzano.
Software Engineering.
Object-oriented Analysis and Design
CS 501: Software Engineering Fall 2000 Lecture 4 Management I: Project Management.
MINER A NuMI MINER A DAQ Review 12 September 2005 D. Casper UC Irvine WBS7: Electronics and Data Acquisition  Overview (this talk): D. Casper  Front-end.
HLT Collaboration (23-Jun-15) 1 High Level Trigger HLT PRR Planning Volker Lindenstruth Kirchhoff Institute for Physics Chair of Computer Science University.
Striplet option of Super Belle Silicon Vertex Detector Talk at Joint Super B factory workshop, Honolulu 20 April 2005 T.Tsuboyama.
MINER A NuMI MINER A DAQ Review 12 September 2005 D. Casper UC Irvine WBS 7.2 & 7.3: Data Acquisition D. Casper (UC Irvine)
Iterative development and The Unified process
L. Greiner 1IPHC meeting – September 5-6, 2011 STAR HFT Plans for the next year A short report on review results and plans for TPC – Time Projection.
LSU 01/18/2005Project Life Cycle1 The Project Life Cycle Project Management Unit, Lecture 2.
LBNE R&D Briefing May 12, 2014 LBNE R&D Briefing May 12, 2014 LArIAT and LBNE Jim Stewart LArIAT EPAG Chair BNL LBNE LARIAT-EPAG J. Stewart BNL T. Junk.
Feasibility and Cost/Benefit Analysis. Cost considerations u Cost classifications –Tangible / Intangible –Direct / Indirect –Fixed / Variable –Developmental.
October 24, 2000Milestones, Funding of USCMS S&C Matthias Kasemann1 US CMS Software and Computing Milestones and Funding Profiles Matthias Kasemann Fermilab.
1 Building and Maintaining Information Systems. 2 Opening Case: Yahoo! Store Allows small businesses to create their own online store – No programming.
12 Dec 2005 J. Schukraft1 ALICE USA ALICE position towards US participation EU participation in emcal Requirements Formal steps & schedule.
Risk management in Software Engineering T erm Paper By By Praveenkumar Sammita Praveenkumar Sammita CSC532 CSC532.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
CERN LBNE Test Experiment. Plan view of Bat
Project Tracking. Questions... Why should we track a project that is underway? What aspects of a project need tracking?
EGEE is a project funded by the European Union under contract IST Testing processes Leanne Guy Testing activity manager JRA1 All hands meeting,
Prof. Aiken CS 169 Lecture 61 Project Planning CS169 Lecture 6.
Group Electronique Csnsm AGATA SLOW CONTROL MEETING 19th fev AGATA PROJECT PREPROCESSING MEZZANINE SLOW CONTROL GUI FOR THE SEGMENT AND THE CORE.
Project Scheduling 1. Why Are Projects Late? An unrealistic deadline established by someone outside the software development group Changing customer requirements.
Object-oriented Analysis and Design Stages in a Software Project Requirements Writing Analysis Design Implementation System Integration and Testing Maintenance.
Concluding Summary WBS1.1.2 SCT Subsystem A. Seiden BNL March 2001.
HFT face-2-face F.Videbaek Brookhaven National Lab.
CS 501: Software Engineering Fall 1999 Lecture 6 Management I: Project Management.
HBD FEM Overall block diagram Individual building blocks Outlook ¼ detector build.
LIGO-G M Planning and Implementation Strategy for Advanced LIGO Gary Sanders LSC Meeting Hanford, August 14, 2001.
1 These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are provided with permission by.
8-1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Project Management Chapter 8.
THE PROJECT LIFE CYCLE PROJECT MANAGEMENT LIFE CYCLE LSU 01/18/2005 PROJECT LIFE CYCLE 1.
Prof. Aiken CS 169 Lecture 21 Software Process CS169 Lecture 2.
GEM chambers for SoLID Nilanga Liyanage University of Virginia.
GEM chambers for SoLID Nilanga Liyanage University of Virginia.
CesrTA Experimental Plan M. Palmer for the CesrTA Collaboration November 17, 2008.
Introducing Project Management Update December 2011.
SOW / Open Workbench By Wilmer Arellano Summer 2013.
UCSC August 12, 2008 U.S. Upgrade R&D Meeting: Strip Detector  Seiden.
MOLLER Collaboration Meeting May 2014 Hall A Update Thia Keppel 1.
ECE791 Senior Design Experience Project Requirements and Timeline.
MINERvA Status Report Deborah Harris, Gabe Perdue, Kevin McFarland, Jorge Morfin October 15, 2009.
MICE CMPB Alain Blondel 1 Highlights on MICE.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
Xenon Detector Installation schedule Satoshi MIHARA.
Project X Working Group Meeting January 15, :00 PM Snake Pit.
By : Hisham Kahlifa Shreef Foda Khaled monir Tamer medhat Supervisor : Dr Doaa Nabil.
Advanced User Support in the Swedish National HPC Infrastructure May 13, 2013NeIC Workshop: Center Operations best practices.
Single-Phase ProtoDUNE Construction Planning Jim Stewart LBNC January 11, 2016.
GLAST Science Support Center May 8, 2006 GUC Meeting AI#28. SAE Release Schedule David Band (GSSC/JCA-UMBC) Julie McEnery (GSFC)
21 Mar 2007ALICE - Paul Dauncey1 ALICE CR07: Installation and Commissioning Paul Dauncey Material from: L. Leistam: “ALICE Status” W. Riegler: “Commissioning.
Cost and Schedule Paul Weinman Pacific Northwest National Laboratory.
Jim Fast Pacific Northwest National Laboratory
By Wilmer Arellano Spring 2010
Final CALICE OsC meeting: Status and summary of project
WBS 1.03 Readout Systems Scope, Cost and Schedule
ProtoDUNE SP DAQ assumptions, interfaces & constraints
Stan Whitcomb LSC meeting Livingston 21 March 2005
Presentation transcript:

Time to resolve Design Issues 1

Disclamer Due to the engineering meeting last week I have not had time to coordinate this material with Tim or the L3 Managers. – Use this as a general guide but not as concrete numbers. We are revising the schedule now and will hopefully have better dated in January 2

Hard Deadlines The DOE CD2/3c review is October – We must be under EVMS (US) 6 months prior to this. And the Review cycle will start in April of – Realistically no significant changes will be possible to the first detector module after November of – One must foresee that due to the prototype activities some changes are necessary and one must leave time for this. – Both detector 1 and 2 will be fixed at CD2/3c. However any major change to the configuration after the start of production of the ProtoDUNE detector would either add to the experiment’s risk by installing non-fully tested elements or require a second run of ProtoDUNE. – The project intends to plan a second protoDUNE run just in case the collaboration decides to proceed with this.. 3

Responsibility If the working groups show that some aspect of the detector design negatively impacts science then DUNE as a whole will need to work to make changes to improve the design. – Changes can increase detector cost, require re-design (with cost), and will produce delays. There must be sufficient funding at CD2/3c to construct the detectors. There will always be a cost benefit analysis. The sooner any changes are known the easier they will be to implement. We want to remain open to improving the detector. 4

Some general short term considerations APA Frame The frame design is well advanced now. – Dimensional changes require re-design Changing wire pitch would require evaluating the impact of the higher stresses before understanding how much time and effort is needed to affect the change. This would probably cause a 6 month delay in ProtoDUNE now and cost probably 500k. – Need input from L3 managers to refine the impacts. 5

APA continued Changing wire pitch and angle – The wire guides, winding pattern, and design of the front end electronics changes if the pitch and angle change. – Design of the FEMB will start in January. It is planned to be doing first winding tests of a dummy frame in Spring. – Changes in pitch and angle will have increasing impact on cost and schedule after Christmas (assume the frame does not need strengthened) – I need input from the managers but simulation, redesign, re-tooling would probably cause a few months delay now and six months after spring. Cost impacts after Spring would be on the 1-2 million dollar level. Schedule delay will be 6 months plus elapsed time. Some general short term considerations 6

Photon Detector The interface to the APA needs to be defined at Christmas to keep on track. – Changes after this could have the same impact as changes to the frame. – The photon coverage would be highest priority. Due to cost limitations work on the photon backend readout is not progressing this year. Changes to the requirements for the backend readout should be known by late Spring so work can be planned for Fall. One year solid work minimum should be foreseen to make and test the backend readout for the photon system. With the parallel development of SBND on could consider changing technology after ProtoDUNE for the detector number 1. However a risk analysis of this should be performed to understand possible implications. 7

DAQ The DAQ software including event builder, run control, slow control will require roughly one year if substantial changes from the 35t are to be made. Hardware changes to backend readout (TPC and Photon) and timing would need longer to implement and test. – We have not worked through when this needs to begin. 8

Computing Computing at CERN can become critical path and should not be forgotten. – We need to be sure the data needed to select/design the optimum detector is collected. 9

ProtoDUNE Data If data is needed to verify the detector performance then this group should be sure it will be collected in ProtoDUNE. Beam delivery to the cryostat must be resolved soon. Are other inputs needed? 10

Comments? 11